Loading...
HomeMy WebLinkAboutGW1-2021-03187_Well Construction - GW1_20210625 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: �artieS s101(+4 14:WATER ZONES FROM TO DESCRIPTION "'sll Contractor Name W4?�- A I2: ft o. Sari Clay ft. ft. NC Well Contractor Certification Number /,n 15.OUTER CASING for multi-cased wells OR LINER if a licsble CaSNA k— N I'll("y FROM tE TO DIAMETER in. THICIG�tESS MATEMAL Company Name 16 INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits ri.e.UIC,County,State,Variance,etc.) ft fL in. 3.Well Use(check well use): M ft. in Water Supply Well: 11 SCREEN FROM TO DIAMETER SLOT SIZE THICICCNESS MATERIAL ❑Agricultural ❑Municipal/Public I�' ft. V, ft. /It m. ,0'�/D SG+t y� PVC ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) it. ft. in. (/ ❑Industrial/Commercial ❑Residential Water Supply(shared) 18 GROUT i ❑hri ation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Nf-Water Supply Well: fa ft. BfMonitoring ❑Recovery ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation -19.SAND/GRAVEL PACK Of applicable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑StormwaterDrainage /3t 1t. aQ ft ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILL G LOG attach additional sheets if necessary) FROM TO DESCRIPTION color,hardness,soilfrock in size etc. ❑Geothermal(Heating/Cooling Return) ❑Other("plain under#21 Remarks) D - It. , ILG i 4.Date Well(s)Completed: �� ( We11ID# Af9I0�I' D I //' fL ' ft. ,it•0—C/a fL ft. 5a.Well Location: 0 rid 1/ ft. M Facility/Owner Name Facility ID#(if applicable) M FL 015 Na41'ddal ad&W AD. 5af,1;g*••✓L M ft 1 1 22 Physical Address,City,and Zip ft. M j1111 &owe(4 Ybq oby 21 REMARKS:. XtloYli, y County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat11ong is sufficient) 22.Certification: 3!5. 6g4goWy N -1r19, 5aag3h9 W 6.Is(are)the well(s): ❑Permanent or !D'I'emporary Signature of ified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: Dyes or o 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS t 9.Total well depth below land surface: es2 (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3Q200'and 2@100) f 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: Z (ft) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use YII 24b.For Infection Wells: Copy.to DWR,Underground Injection Control(IUC) 11.Borehole diameter: (in.) Program,1636 MSC,Raleigh,NC 27699-1636 i 12.Well construction method: Sd n t�- 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed .JR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: I ' I 13b.Disinfection type: Amount: ' P Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018