Loading...
HomeMy WebLinkAboutGW1-2021-03094_Well Construction - GW1_20210625 For lnfcmni tJ,.—;CO!lly: I'Well Contractor information: v-14itoWmA TFR7T00ON ES M Or— "Cli Contractor Name - - rL A. NC`Wdl Contractor Certification Numbcr IS jA OUTER CASING.SING(Iss,Fulti-esised welts)OR LINER(Iran a Cascade Drilling, LP FROM r To DIAMICTIER, THICKNMS MATERIAL Company Nama 46.INNER SINGOWTUBING(reathermal closed-tooss) - 2-1VtlI Construction Ptrmit 01; FROM TO I DIAMETER 1 1,THICKNESS J MATERIAL 1-10 all OPIP1000NO 14-01 COMIFUCIMH prrmnt F'.(71c, onty,.Vtale,Variance,etc.) (I,[ If. L? ft. in. Vk i 1(,) 3.Well Use(check well list): A. tL in. \Mit Irl G I j A n tr Supply Well: FROM I TO PIAM.rTFOt SO OT MZF TIOICKNFSS A-Al-AMAMAL Agricultural [3Municipal/Public 0 rL Ili Geothermal(I leatingtCooling Supply) 011esidential Water Supply(single) Sd I Industrial/Commercial 13Rcsidcntial Water Supply(shared) rL q0 PVC Irrigation FROM TO MATERIAL' EMPIAEFRIFNI"MIETHOD&AMOVNT on-Wattr Supply Well: 50 /AL4424. Monitoring Recovery It. I I 2,41 Injection Well; Aquifer Recharge 13Groundwater Remcdlation AV I,'PA '01'applica I0 Aquifer Storage and Recovery DSalinity Baff icr FROM TO MATERIAL FM1`LACfMLNT Ivirrunn Aquifer Tcst DStotmwatcr Drainage 41y M 9zvt Experimental Technology [3Subsidcncc Control Geothcrmal(Closed Loop) 07fracer :10MRILL 0 LOG fallath additinital a set!#Ifftece-90 Geothermal FROM to rain 4"t. cothermal(Heating/Cooling Return) E3Other(cxplain under#21 Remarks) 4.Date Wtil(s)Completed: Wdl ID# —AIW So.Weil Location: It. racilily/Owner Name Facility IDO(ifnpplic;blo) (L —ti-0\1 9. 3stllo r- Jr -,4 A(C J(-Vtol I*d.wj�� ft. Physical Address,City,and Zip III A—EbtA R its w.'A County Parcel identification No.(FIN) 5b.Latitude and longitude in degretslininutesiatconds or decimal degrees: (ifwell field,one latilons is sufficient) 22.Certification: AfCoc q5a,�--A �4 _/. 6.11s(arc)the well(s)JOPermanent or 13Temporary Si fied Well Contractor Data fly signing Aftfarm,I hereby cerq&that the well(t)war(were)constructed in accordance 7.Is this a repair to on existing well: 13yes or JUNO with 15A NCAC 02C.0100 or 15A KCAC 02C.0200 Well Conviruc0an Slandardt and that a ffthis is a repair,fill out kno-ts well construction information and explain the mature of the copy of this record hat been provided to the well owner. repair under#21 remarks section or on the hack ofthirform. 23.Site diagram or additional well details: 8.For Geoprobt/DPT or Closed-Loop Geothermal Wells having the same You may use the back or this page to provide additional well site details or well construction,only I GIN-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SIMMIZAL INSTRUCTIONS 9.Total well depth below land surface: — (ft.) 24a. Tor Ali Wells: Submit this Reim within 30 days of completion of willror multiple wellt Att all depiks(fdOerent(exemple-3@200-�ond 2@100') construction to the following: 10.Static water level below top of casing: --- —00 Division of Water Resources,Information Processing Unit, #'water level it above cosh,,cue 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: (in.) 24h. for Injection 33'ells: In addition to sending the form to the address in 24a above,also submit one copy of this form within 30 days of completion of well 12,Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources.Un I dtirgrou nW injection Control Program, aleir,Ralcigh,NC 27699-1636 rOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Ce I 24c.For Witter Sun _Igkflkn I �V : In addition to sending the form to 13a.Yield(gpm) Method oftest: the address(es) above, also submit one copy of this form within 30 days of completion of well construction to the county health department of the county 13b.Disinfection typt: Amount: where constructed. Revised 2-22-2016 Form ow.1 North Carolina Department of Environmental Quality-Division orWater Resources