Loading...
HomeMy WebLinkAboutNCC213957_NOI Application_20210706Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/2/2021 12:10:05 PM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 7/6/2021 7:35:06 AM (Review- Construction NOI 58271) • The task was assigned to Broussard, Brooklyn C by round robin distribution 7/2/2021 12:11 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 6, 2021 5:00 PM 7/2/2021 12:11 PM Submit by Selkane, Aziza 7/6/2021 11:50:51 AM (Payment Verification for NCC213957) * Brock Hennings • Selkane, Aziza assigned the task to Selkane, Aziza 7/6/2021 11:50 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 17, 2021 5:00 PM 7/6/2021 7:35 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Doosan Bobcat - Statesville Facility Expansion 1 b. Specific Lot This field rray be used to list specifc lot numbers. Numbers 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) 4745755711.000 and 4745774735.000 2. County* Iredell 3. Highway or Street 1293 Glenway Drive Address* Street name only is acceptable if no address number assigned yet 4.CityorTownship* Statesville 5. State * NC 6. Zip Code* 28625 7. Latitude* Enter the latitude in decimal degrees 35.8201 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -80.8652 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 07/06/2021 Estimated Construction Project Start Rate 10. Date to End * 06/30/2023 Estimated Construction Project End Date 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Development 12. Acres to be 71.40 disturbed* (including off -site borrow and waste areas) 13. Total site area 71.40 (acres) * 14. Post- 61.40 construction (Estimated) impervious area (acres) * NCC Project NCC-IREDE-2021-Doosan Bobcat - Statesville Facility Expansion Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Fourth Creek Waterbody* Name of waterbody into which stormwater runoff will discharge 15b. Waterbody 12-108-20 Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Clark Equipment Company, DBA Doosan Portable Power IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Lance IF Corporation, enter Faegistered Agent First Wre 3. Last Name* Mathern IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Vice President 4. Permitee E-mail lance.mathern@doosan.com Address* 5. Permittee 701-799-8813 Telephone No.* 6. Permittee Mailing Street Address Address* 250 East Beaton Drive Address Line 2 West Fargo Fbstal / Zip Code 58078-2656 Check box if the V Yes street address the same as mailing address State / Frovince / Region ND Country us 7. Permittee Street Street Address Address* 250 East Beaton Drive Address Line 2 City State / Frovince / Faegion West Fargo ND Postal / Zip Code Country 58078-2656 us 8. Type of Ownership is only individual if an individual is naned in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Site Contact Inforrration ......................................................................................................................................................................................................................................... 1. Primary Site Brock Contact - First Name * 2. Primary Site Hennings Contact - Last Name * 3. Title Senior Project Manager 4. Site Contact E- BrockH@omegaconstruction.com mail Address* 5. Site Contact 336-701-1100 Telephone No. 6. Organization Omega Construction Name 7. Site Contact Street Address Mailing Address* 1100 South Stratford Road Address Line 2 Buildig C, Suite 110 Oty State / Rovince / Region Winston-Salem NC Fbstal / Zip Code Country 27103 us 8. Consultant Name (Optional) Freeland & Kauffman. Inc, Attn: Todd Simmons, PE First and Last nacre 9. Consultant E-mail tsimmons@fk-inc.com This person will be copied on all correspondence. 10. Consultant 864-672-3426 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) lance. mathern@doosan.com Default is legally responsible person e-rrail 12. Billing (For Annual Fee correspondence) Telephone 701-799-8813 Default is legally responsible person telephone D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/25/2021 Approved * 2. E&SC Plan Project STVLE-2021-087 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Iredell County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan 2021-06-25 - Iredell County - LOAM Doosan Approval letter or 83.99KB Expansion.pdf Grading Permit Mast be FDFfon-rat 6. Site Location Map Mist be RDFforrret (lint 201VB) 2021-06-29 - E-NOI Vicinity Map - For Upload.pdf 563.45KB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies if necessary. 8. NOI Certification 2021-06-30 - NCDEQ eNO1 Certification Form - Form 85.64KB Signed.pdf Mast be FCFfon-rat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person' (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Lance J. Mathern Title Vice President Organization Legally Ibsponsible Entity Clark Equipment Company, DBA Doosan Portable Power Date * 07/02/2021 F. Tracking and COC Info NOI Tracking No. 58271 NC Reference No. NCG01-2021-3957 Uses 'count_nurber' variable (increrrented by SP) Certificate of NCC213957 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 3957 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC213957-2021 Invoice Due Date 8/5/2021 Initial Fee $ 100.00 Invoice Status OPEN