HomeMy WebLinkAboutNCC213957_NOI Application_20210706Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 7/2/2021 12:10:05 PM (NCG01 NOI Submission)
Approve by Broussard, Brooklyn C 7/6/2021 7:35:06 AM (Review- Construction NOI 58271)
• The task was assigned to Broussard, Brooklyn C by round robin distribution 7/2/2021 12:11 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 6, 2021 5:00 PM
7/2/2021 12:11 PM
Submit by Selkane, Aziza 7/6/2021 11:50:51 AM (Payment Verification for NCC213957)
* Brock Hennings
• Selkane, Aziza assigned the task to Selkane, Aziza 7/6/2021 11:50 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 17, 2021 5:00 PM
7/6/2021 7:35 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting IT No
an NOI that was r Yes
rejected before?
1a. Project Name * Doosan Bobcat - Statesville Facility Expansion
1 b. Specific Lot This field rray be used to list specifc lot numbers.
Numbers
1 c. Parcel ID List all Rios associated w ith this project.
Number(s) (PIN) 4745755711.000 and 4745774735.000
2. County* Iredell
3. Highway or Street 1293 Glenway Drive
Address* Street name only is acceptable if no address number assigned yet
4.CityorTownship* Statesville
5. State * NC
6. Zip Code* 28625
7. Latitude* Enter the latitude in decimal degrees
35.8201
8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative)
-80.8652
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
07/06/2021
Estimated Construction Project Start Rate
10. Date to End *
06/30/2023
Estimated Construction Project End Date
11. SIC (Primary)*
Industrial (1541)
Standard Industrial aassification for Development
12. Acres to be
71.40
disturbed*
(including off -site borrow and waste areas)
13. Total site area 71.40
(acres) *
14. Post- 61.40
construction (Estimated)
impervious area
(acres) *
NCC Project NCC-IREDE-2021-Doosan Bobcat - Statesville Facility Expansion
Tracking ID Assigned automatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Fourth Creek
Waterbody* Name of waterbody into which stormwater runoff will discharge
15b. Waterbody 12-108-20
Index No. * NCWaterbody Index Number
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fternittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * Clark Equipment Company, DBA Doosan Portable Power
IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Lance
IF Corporation, enter Faegistered Agent First Wre
3. Last Name* Mathern
IF Corporation, enter F;bgistered Agent Last %rre
3b. Title Vice President
4. Permitee E-mail lance.mathern@doosan.com
Address*
5. Permittee 701-799-8813
Telephone No.*
6. Permittee Mailing Street Address
Address* 250 East Beaton Drive
Address Line 2
West Fargo
Fbstal / Zip Code
58078-2656
Check box if the V Yes
street address the
same as mailing
address
State / Frovince / Region
ND
Country
us
7. Permittee Street
Street Address
Address*
250 East Beaton Drive
Address Line 2
City
State / Frovince / Faegion
West Fargo
ND
Postal / Zip Code
Country
58078-2656
us
8. Type of
Ownership is only individual if an individual is naned in B.1. above.
Ownership*
Non -Government
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
.........................................................................................................................................................................................................................................
1. Primary Site
Brock
Contact - First
Name *
2. Primary Site
Hennings
Contact - Last
Name *
3. Title
Senior Project Manager
4. Site Contact E-
BrockH@omegaconstruction.com
mail Address*
5. Site Contact
336-701-1100
Telephone No.
6. Organization
Omega Construction
Name
7. Site Contact
Street Address
Mailing Address*
1100 South Stratford Road
Address Line 2
Buildig C, Suite 110
Oty
State / Rovince / Region
Winston-Salem
NC
Fbstal / Zip Code
Country
27103
us
8. Consultant Name (Optional)
Freeland & Kauffman.
Inc, Attn: Todd Simmons, PE
First and Last nacre
9. Consultant E-mail tsimmons@fk-inc.com
This person will be copied on all correspondence.
10. Consultant 864-672-3426
Telephone No.
11. Billing E-mail
(For Annual Fee correspondence)
lance. mathern@doosan.com
Default is legally responsible person e-rrail
12. Billing
(For Annual Fee correspondence)
Telephone
701-799-8813
Default is legally responsible person telephone
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 06/25/2021
Approved *
2. E&SC Plan Project STVLE-2021-087
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* Iredell County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan 2021-06-25 - Iredell County - LOAM Doosan
Approval letter or 83.99KB
Expansion.pdf
Grading Permit
Mast be FDFfon-rat
6. Site Location Map Mist be RDFforrret (lint 201VB)
2021-06-29 - E-NOI Vicinity Map - For Upload.pdf 563.45KB
Rease do not upload entire set of E&SC plans.
7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies if necessary.
8. NOI Certification 2021-06-30 - NCDEQ eNO1 Certification Form -
Form 85.64KB
Signed.pdf
Mast be FCFfon-rat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Legally Responsible Person named on this Notice of Intent
f Authorized Responsible Person' (signing on behalf of Legally Responsible
Person named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name* Lance J. Mathern
Title Vice President
Organization Legally Ibsponsible Entity
Clark Equipment Company, DBA Doosan Portable Power
Date * 07/02/2021
F. Tracking and COC Info
NOI Tracking No. 58271
NC Reference No.
NCG01-2021-3957
Uses 'count_nurber' variable (increrrented by SP)
Certificate of
NCC213957
Coverage (COC)
Uses 'count_nurrber' variable (increrrented by SP)
No.*
Count Number 3957
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2021
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC213957-2021
Invoice Due Date 8/5/2021
Initial Fee $ 100.00
Invoice Status OPEN