Loading...
HomeMy WebLinkAbout20211067 Ver 1_15801.1027014_Interim Plans_20210702STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET STRUCTURE STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONST. DIVISION OF HIGHWAYS PROJECT ENGINEER PROJECT DESIGN ENGINEER P.E.- - VICINITY MAP N.T.S. LOCATION: CURRITUCK COUNTY 15801.1027014 4 PROFESSION A LE NG INEER N ORTH CARO LINA SEAL 043777 EKUD H BOCAJLICENSE #: C-1506 RALEIGH, NC 27601 (919) 882-7839 301 FAYETTEVILLE ST., SUITE 1500 2018 STANDARD SPECIFICATIONS LETTING DATE : PROJECT LENGTH #07 = 0.03 MILE DESIGN DATA #07 ADT (2013) = 1,800 DEPART ME NT OF TRANSPORTATIONSTATE OF NORT H CAR O L I NACURRITUCK COUNTYCURRITUCK COUNTY CURRITUCK COUNTY TIP PROJECT: 15801.1027014CONTRACT: TBDDIEGO A. AGUIRRE, PhD, P.E. JACOB H. DUKE, P.E. 15801.1027014 15801.1027014 Knotts Island US Fish and Wildlife Service Mackay Island National Widlife Refuge APRIL 13, 2021 BRIDGE #260007 ON NC615 (MARSH CAUSEWAY) OVER CREEK OFF BACK BAY (COREY'S DITCH) Prepared for the Office of: NCDOT DIVISION ONE 113 AIRPORT DRIVE, SUITE 100 EDENTON, NC 27932 TYPE OF WORK: AND PIPE PILES AT BENT 2 INTERIM SCOUR COUNTERMEASURES - INSTALLATION OF GEOSYNTHETIC AGGREGATE BAGS PROJECT END PROJECT BEGIN 260007 VIRGINIA NORTH CAROLINA Marsh Cswy Knotts Island Rd1255 Brumley Rd LINE TO VA STATE TO SR 1255 -EL- 36'-0"48'-0"48'-0"48'-0" STRUCTURE EXISTING (TYP.) STRUCTURE EXISTING EXISTING RIP RAP (TYP.) APPROX. LIMITS OF EXISTING RIP RAP (TYP.) APPROX. LIMITS OF À BENT 2 BY PREVIOUS STORM EVENTS RIP RAP HAVE BEEN DISPLACED VARIOUS PORTIONS OF BY PREVIOUS STORM EVENTS RIP RAP HAVE BEEN DISPLACED VARIOUS PORTIONS OF (TYP.) (2006) GROUND LINE EXISTING (TYP.) LAYER 1 BAG UNIT GEOSYNTHETIC AGGREGATE (TYP.) (08/07/2020) GROUND LINE EXISTING (TYP.) LAYER 2 BAG UNIT AGGREGATE GEOSYNTHETIC (TYP.) LAYER 2 AGGREGATE BAG UNIT GEOSYNTHETIC (TYP.) LAYER 1 AGGREGATE BAG UNIT GEOSYNTHETIC COMMUNCATIONS JOINT USE: POWER AND EXISTING AERIAL PIPE PILES (TYP.) 24"x0.5" STEEL PIPE PILES (TYP.) 24"x0.5" STEEL EL. 0.0 NORMAL W.S (TYP.) STREAM BANK EXISTING ELEVATIONS PILE CUT OFF SEE SHEET S-3 FOR 23+50 24+00 24+50 25+00 25+50 10 20 15 5 0 SHEET 1 OF 2 -5 -10 -15 23+00 -20 -25 -30 JACOB H. DUKE FIDEL L. FLORES PLAN SPAN 1 SPAN 2 SPAN 3 SPAN 4 END BENT 1 BENT 1 BENT 2 BENT 3 END BENT 2 SECTION ALONG -EL- BACK BAY C O R E Y'S DI T C H (SECTIONS AT BENTS AND END BENTS ARE AT RIGHT ANGLES) E B B TI D E SPAN 1 SPAN 2 SPAN 3 SPAN 4 END BENT 1 WP#1 BENT 1 WP#2 BENT 2 WP#3 BENT 3 WP#4 END BENT 2 WP#5 S-1 (COREY'S DITCH) CREEK OFF BACK BAY (MARSH CAUSEWAY) OVER THE FOR BRIDGE ON NC 615 GENERAL DRAWING NO.NO.BY:BY:DATE:DATE: REVISIONS SHEET NO. TOTAL SHEETS STATE OF NORTH CAROLINA RALEIGH COUNTY PROJECT NO. DEPARTMENT OF TRANSPORTATION 1 2 3 4 DRAWN BY : CHECKED BY : DATE : DATE : 2/12/2021 jduke 15801.1027014_SMU_GD01_260007.dgn DATE :DESIGN ENGINEER OF RECORD:PROFESSION A LE NG INEERNORTHCAROLINA SEAL 043777 EKUD H BOCAJ SIGNATURES COMPLETED FINAL UNLESS ALL DOCUMENT NOT CONSIDERED 4NC FIRM LICENSE: C-1506 RALEIGH, NC 27601 (919) 882-7839 301 FAYETTEVILLE ST., SUITE 1500 BRIDGE NO.260007 105801.1027014 CURRITUCK JACOB H. DUKE 12/2020 12/2020 12/2020 LOCATION SKETCH PERFORM AND COMPLETE THE PROJECT. ROADWAYS, UTILITIES, THE SURROUNDING AREA, AND ANY OTHER ASPECTS THAT MAY BE NECESSARY TO THE CONTRACTOR SHALL CONFIRM, THROUGH OTHER SOURCES, SPECIFIC INFORMATION REGARDING BRIDGES, INFORMATION INDICATED ON THE LOCATION SKETCH SHALL BE CONSIDERED GENERAL INFORMATION ONLY. GENERAL NOTES SHEET 2 OF 2 JACOB H. DUKE FIDEL L. FLORES S-2 DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "B3445-1" WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF NORTHING: 1029577.6814(ft) EASTING: 2888649.1390(ft) ELEVATION: 2.95(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 1.000132062 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "B3445-1" TO -L- STATION IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 (COREY'S DITCH) CREEK OFF BACK BAY (MARSH CAUSEWAY) OVER THE FOR BRIDGE ON NC 615 GENERAL DRAWING LATITUDE LONGITUDE BRIDGE COORDINATES 36°32' 24.73"75°58' 20.56" TOTAL TOTAL BILL OF MATERIAL SQ. FT. BAG UNIT AGGREGATE GEOSYNTHETIC 1425 LIN. FT. PILES STEEL GALVANIZED PP 24" X 0.5" 384 EA. PILES GALVANIZED STEEL FOR PP 24 X 0.50 EQUIPMENT SETUP PILE DRIVING 4 BRIDGE SUBSTRUCTURE SHOWN ON THE PLANS AND THE ACTUAL CONDITIONS AT THE PROJECT SITE. DEPARTMENT OF TRANSPORTATION FOR ANY DELAYS OR ADDITIONAL COST INCURRED BASED ON DIFFERENCES BETWEEN THE EXISTING INFORMATION IS SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR, THE CONTRACTOR SHALL HAVE NO CLAIM WHATSOEVER AGAINST THE THE SUBSTRUCTURE OF THE EXISTING BRIDGE INDICATED ON THE PLANS IS FROM THE BEST INFORMATION AVAILABLE. SINCE THIS THE CONTRACTOR SHALL CONTAIN AND EXPOSE OF COLLECTED DRIFT MATERIALS OFF SITE, AT NO ADDITIONAL COST TO THE DEPARTMENT. THE CONTRACTOR SHALL NOT ALLOW, AT ANY TIME, ANY DRIFT MATERIALS TO FLOW DOWNSTREAM OF THE PROJECT SITE. FOR GEOSYNTHETIC AGGREGATE BAG UNIT, SEE SPECIAL PROVISIONS. FOR WORK IN, OVER OR ADJACENT TO NAVIGABLE WATERS, SEE SPECIAL PROVISIONS. FOR MAINTENANCE OF WATER TRAFFIC, SEE SPECIAL PROVISIONS. FOR SECURING OF VESSELS, SEE SPECIAL PROVISIONS. FOR CRANE SAFETY, SEE SPECIAL PROVISIONS. FOR FALSEWORK AND FORMWORK, SEE SPECIAL PROVISIONS. FOR SUBMITTAL OF WORKING DRAWINGS, SEE SPECIAL PROVISIONS. FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET SN. PRIOR TO BEGINNING WORK, THE CONTRACTOR SHALL SUBMIT FOR REVIEW AND APPROVAL A COMPLETE SEQUENCE OF TASKS FOR EACH OPERATION AFFECTING THE BRIDGE STRUCTURE AND/OR TRAFFIC. FOR CONTROL OF TRAFFIC AND LIMITS OF PHASING OF CONSTRUCTION, SEE TRANSPORTATION MANAGEMENT PLANS. STRUCTURE, THE DAMAGED AREA SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE ENGINEER AT NO ADDITIONAL COST TO THE DEPARTMENT. THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT THE EXISTING STRUCTURE WHICH IS TO REMAIN IN PLACE WILL NOT BE DAMAGED. IF THE CONTRACTOR DAMAGES ANY PART OF THE EXISTING FOR GEOSYNTHETIC AGGREGATE BAG UNITS, SEE SPECIAL PROVISIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL STATE AND FEDERAL SAFETY REQUIREMENTS. FOR UTILITY INFORMATION, SEE UTILITY PLANS AND SPECIAL PROVISIONS. SEE TRANSPORTATION MANAGEMENT PLANS FOR LANE WIDTHS, SEQUENCING AND OTHER TRAFFIC CONTROL MEASURES FOR STAGING OF EQUIPMENT AND PHASING OF WORK. THIS BRIDGE IS LOCATED IN SEISMIC ZONE 1. ASSUMED LIVE LOAD FOR REPAIRS = HL93. (DESIGN BASED OFF ORIGINAL PLANS) DO NOT SCALE DRAWINGS FOR DIMENSIONS NOT GIVEN. ALL DIMENSIONS ARE IN FEET AND INCHES. BL-3 NC 615 (MARSH CAUSEWAY) 19 ' BST -EL- -EL- NO.NO.BY:BY:DATE:DATE: REVISIONS SHEET NO. TOTAL SHEETS STATE OF NORTH CAROLINA RALEIGH COUNTY PROJECT NO. DEPARTMENT OF TRANSPORTATION 1 2 3 4 DRAWN BY : CHECKED BY : DATE : DATE : 2/12/2021 jduke 15801.1027014_SMU_GD02_260007.dgn DATE :DESIGN ENGINEER OF RECORD:PROFESSION A LE NG INEERNORTHCAROLINA SEAL 043777 EKUD H BOCAJ SIGNATURES COMPLETED FINAL UNLESS ALL DOCUMENT NOT CONSIDERED 4NC FIRM LICENSE: C-1506 RALEIGH, NC 27601 (919) 882-7839 301 FAYETTEVILLE ST., SUITE 1500 BRIDGE NO.260007 105801.1027014 CURRITUCK JACOB H. DUKE 12/2020 12/2020 12/2020 BEGIN BRIDGE END BRIDGE TO VA STATE LINE TO SR 1255 NC 615 (MARSH CAUSEWAY) BACK BAY COREY'S DITCH -EL- PILES (TYP.) 24" • PIPE À BENT 2 8'-6"10'-6"5'-0"5'-0"STRUCTURE EDGE OF EXISTING STRUCTURE EDGE OF EXISTING LAYER 2 (TYP.) BAG UNIT AGGREGATE GEOSYNTHETIC LAYER 1 (TYP.) BAG UNIT AGGREGATE GEOSYNTHETIC PIPE PILE (TYP.) EXISTING STEEL PIPE PILE 24 x 0.5 GALVANIZED 8'-6"10'-6"5'-0"5'-0"77'-0" |D D/2|D/2| MWS EL. LAYER 2 GEO BAG UNIT LAYER 1 GEO BAG UNIT (SEE NOTE 8, UNDER ``NOTES'') GEO BAG UNITS LOOP FOR TYING OFF PROPOSED ANCHOR ATTACHMENT (SEE NOTE 7, UNDER ``NOTES'') GEO BAG UNITS INTO PLACE LOADING POINT FOR WINCHING BENT 2 WP #2 COUNTERMEASURES SCOUR DETAILS FIDEL L. FLORES JACOB H. DUKE NOTES: S-3 STACKING DETAIL GEOSYNTHETIC AGGREGATE BAG AND 24" • PIPE PILE DETAILS PILE NOTES: AT BENT #2 SCOUR COUNTERMEASURES BAG UNIT PLACEMENT) (GEOSYNTHETIC AGGREGATE PIPE PILE PLATE DETAIL 24'' ~ X ƒ'' } ``D'' ELEVATION NO HIGHER THAN -95 FT. INSTALL PILES ON BOTH SIDES OF BENT 2 TO A TIP8. OF 10 TONS PER PILE.DRIVING RESISTANCE DRIVE PIPE PILES FOR WINCHING AT BENT 2 TO A REQUIRED 7. FACTORED RESISTANCE OF 5 TONS PER PILE. PIPE PILES FOR WINCHING AT BENT 2 ARE DESIGNED FOR A 6. SPECIFICATIONS AND AWS D1.1. PILE SPLICES SHALL BE IN ACCORDANCE WITH THE STANDARD5. DURING INSTALLATION OR DRIVING. ENGINEER PILES THAT ARE DAMAGED, DEFORMED OR COLLAPSED REMOVE AND REPLACE OR REPAIR TO THE SATISFACTION OF THE4. SECTION 450 OF THE STANDARD SPECIFICATIONS. PIPE PILE PLATES, IF REQUIRED, SHALL BE IN ACCORDANCE WITH 3. WITH SECTION 1076 OF THE STANDARD SPECIFICATIONS. GALVANIZE FULL LENGTH OF STEEL PIPE PILES IN ACCORDANCE 2. THE STANDARD SPECIFICATIONS. PIPE PILES SHALL BE IN ACCORDANCE WITH SECTION 1084 OF 1. { PILE SPLICE PIPE PILE SPLICE DETAIL STEEL PILE GALVANIZED PP 24 X 0.50 SHEET 1 OF 2 FOR ANCHOR ATTACHMENT TIE-OFF DETAILS, SEE SHEET S-4.8. DETAILS.CONTRACTOR TO PROVIDE WINCHING CONNECTION7. UNIT. INCIDENTAL TO THE COST OF THE GEOSYNTHETIC AGGREGATE BAG ALL CONNECTIONS AND WIRE ROPE SHALL BE CONSIDERED 6. 24" • PIPE PILES. TIE CABLES OFF WITH CROSBY CLAMPS AND ANCHOR TO PROPOSED5. ROPE. FOR MORE INFORMATION, SEE SPECIAL PROVISIONS. LIFTING LOOPS AND SECURE TO PILES WITH GALVANIZED …" WIRE SECURE EACH LAYER OF AGGREGATE BAGS TOGETHER THROUGH4. FOR GEOSYNTHETIC AGGREGATE BAG UNITS, SEE SPECIAL PROVISIONS.3. CENTER OF PILE). FROM ANY EXISTING PILE (MEAUSURED FROM CENTER OF PILE TO PROPOSED PILES ARE TO BE PLACED A MINIMUM OF 8'-0" 2. FIELD ADJUSTED AS APPROVED BY THE ENGINEER. PROPOSED PIPE PILE LOCATIONS ARE APPROXIMATE AND MAY BE1. NO.NO.BY:BY:DATE:DATE: REVISIONS SHEET NO. TOTAL SHEETS STATE OF NORTH CAROLINA RALEIGH COUNTY PROJECT NO. DEPARTMENT OF TRANSPORTATION 1 2 3 4 DRAWN BY : CHECKED BY : DATE : DATE : 2/12/2021 jduke 15801.1027014_SMU_B02_DET01_260007.dgn DATE :DESIGN ENGINEER OF RECORD:PROFESSION A LE NG INEERNORTHCAROLINA SEAL 043777 EKUD H BOCAJ SIGNATURES COMPLETED FINAL UNLESS ALL DOCUMENT NOT CONSIDERED 4NC FIRM LICENSE: C-1506 RALEIGH, NC 27601 (919) 882-7839 301 FAYETTEVILLE ST., SUITE 1500 BRIDGE NO.260007 105801.1027014 CURRITUCK JACOB H. DUKE 12/2020 12/2020 12/2020 FOR WINCH LOADING 1.0 KIP. DESIGN FORCE GEOSYNTHETIC BAG DIAMETER EL 0.0 EL -31.0 SCOURED GROUNDLINE APPROX. EXIST. EL -28.0 EL -36.0 EL 1.0 WATER SURFACE BAG INSTALLATION FINAL CUT-OFF AFTER GEO LAYER 1 GEO BAG UNIT LAYER 2 GEO BAG UNIT …" WIRE ROPE (TYP.) LIFTING LOOP GEO BAG UNIT24" • PIPE PILE PROPOSED DETAIL SEE ANCHOR ATTACHMENT 24" • PIPE PILE EXISTING DETAIL SEE ANCHOR ATTACHMENT 24" • PIPE PILE PROPOSED …" WIRE ROPE THIMBLE WIRE ROPE 5-TON SHACKLE 24" ~ PIPE PILE PROPOSED TO GEO BAG UNIT GEO BAG UNIT TIE-OFF VIEW EL. -31.0 | EL. -36.0 | EXISTING GROUND LINE NOTES: COUNTERMEASURES SCOUR DETAILS SHEET 2 OF 2 S-4 JACOB H. DUKE FIDEL L. FLORES ANCHOR ATTACHMENT DETAILU-BOLTCLIPS WITH(3) WIRE ROPEU-BOLTSCLIPS WITH(3) WIRE ROPEUNITS ANCHOR LINES CONNECTING GEO BAG FOR ATTACHING WIRE ROPE TO USE SIMILAR ATTACHMENT SETUPNOTE: GE BAG UNIT LAYER. EACH PILE MUST HAVE A MINIMUM OF ONE CONNECTION MADE TO EACH3. TO ALLOW FOR GEO BAG UNIT ARTICULATION. INSTALL WIRE ROPE WITH A MAXIMUM VERTICAL DEFLECTION OF 6 IN.2. FOR GEOSYNTHETIC AGGREGATE BAG UNITS, SEE SPECIAL PROVISIONS.1. NO.NO.BY:BY:DATE:DATE: REVISIONS SHEET NO. TOTAL SHEETS STATE OF NORTH CAROLINA RALEIGH COUNTY PROJECT NO. DEPARTMENT OF TRANSPORTATION 1 2 3 4 DRAWN BY : CHECKED BY : DATE : DATE : 2/12/2021 jduke 15801.1027014_SMU_B02_DET02_260007.dgn DATE :DESIGN ENGINEER OF RECORD:PROFESSION A LE NG INEERNORTHCAROLINA SEAL 043777 EKUD H BOCAJ SIGNATURES COMPLETED FINAL UNLESS ALL DOCUMENT NOT CONSIDERED 4NC FIRM LICENSE: C-1506 RALEIGH, NC 27601 (919) 882-7839 301 FAYETTEVILLE ST., SUITE 1500 BRIDGE NO.260007 105801.1027014 CURRITUCK JACOB H. DUKE 12/2020 12/2020 12/2020 STRUCTURAL STEEL: ETC. IN CASTING SUPERSTRUCTURES: ALLOWANCE FOR DEAD LOAD DEFLECTION, SETTLEMENT, REINFORCING STEEL: HANDRAILS AND POSTS: SPECIAL NOTES: STRESS IN EXTREME FIBER OF IMPACT ALLOWANCE LIVE LOAD 27,000 LBS. PER SQ. IN. 20,000 LBS. PER SQ. IN. DESIGN DATA: SPECIFICATIONS JANUARY, 1990 DOWELS: MATERIAL AND WORKMANSHIP: CONCRETE: EQUIVALENT FLUID PRESSURE OF EARTH - - - - - OF TIMBER COMPRESSION PERPENDICULAR TO GRAIN CONCRETE IN COMPRESSION CONCRETE IN SHEAR SEE A.A.S.H.T.O. CONCRETE CHAMFERS: 24,000 LBS. PER SQ. IN. 27,000 LBS. PER SQ. IN. STRUCTURAL STEEL - AASHTO M270 GRADE 36 - AASHTO M270 GRADE 50W - AASHTO M270 GRADE 50 REV. 6-16-95 EEM ( ) RGW ENGLISH REV. 8-16-99 RWW ( ) LES REV. 5-7-03 RWW ( ) JTE REV. 5-1-06 TLA ( ) GM 2/12/2021 jduke 15801.1027014_SMU_SN_260007.dgn STD. NO. SNREV. 10-1-11 MAA ( ) GM SEE A.A.S.H.T.O. SEE PLANS A.A.S.H.T.O. (CURRENT) BE HOT ROLLED. STEEL SHEET PILING FOR PERMANENT OR TEMPORARY APPLICATIONS SHALL N. C. DEPARTMENT OF TRANSPORTATION. THE 2018 ``STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES" OF THE PROVISIONS, ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH EXCEPT AS MAY OTHERWISE BE SPECIFIED ON PLANS OR IN THE SPECIAL BE USED FOR SLOPE PROTECTION AND RIP RAP. ABUTMENT BACKWALLS, AND APPROACH SLABS; AND CLASS B CONCRETE SHALL CLASS AA CONCRETE SHALL BE USED IN BRIDGE SUPERSTRUCTURES, USED FOR ALL PORTIONS OF ALL STRUCTURES WITH THE EXCEPTION THAT: UNLESS OTHERWISE REQUIRED ON PLANS, CLASS A CONCRETE SHALL BE WITH A FINISHING STONE OR TOOL UNLESS OTHERWISE REQUIRED ON PLANS. AND TOPS OF CURBS AND SIDEWALKS SHALL BE ROUNDED TO A ‚" RADIUS ON PLANS; AND CORNERS OF EXPANSION JOINTS IN THE ROADWAY FACES SHALL BE ROUNDED WITH A ‚" FINISHING TOOL UNLESS OTHERWISE REQUIRED INTO CURB FORMS; CORNERS OF TRANSVERSE FLOOR EXPANSION JOINTS TOP CORNERS OF CURBS MAY BE ROUNDED TO 1•" RADIUS WHICH IS BUILT STRUCTURES SHALL BE CHAMFERED ƒ" WITH THE FOLLOWING EXCEPTIONS: UNLESS OTHERWISE NOTED ON THE PLANS, ALL EXPOSED CORNERS ON PLACE WITH 1:2 CEMENT MORTAR. BE EMBEDDED AT LEAST 12" INTO THE OLD CONCRETE AND GROUTED INTO DOWELS WHEN INDICATED ON PLANS AS FOR CULVERT EXTENSIONS, SHALL FALSEWORK OR FORMS IS STARTED. BE SUBMITTED TO THE ENGINEER FOR APPROVAL BEFORE CONSTRUCTION OF THE AND ANY STRUCTURE OR PARTS OF A STRUCTURE AS NOTED ON THE PLANS SHALL DETAILED DRAWINGS FOR FALSEWORK OR FORMS FOR BRIDGE SUPERSTRUCTURE CONSTRUCTION ELEVATIONS FURNISHED BY THE ENGINEER. SHALL CONFORM TO THE PROFILE AND ELEVATIONS SHOWN ON THE PLANS AND ELEVATIONS SHOWN. AFTER REMOVAL OF THE FALSEWORK, THE FINISHED STRUCTURES AND PERMANENT CAMBER WHICH SHALL BE PROVIDED FOR IN ADDITION TO THE ALLOWANCE SHALL BE MADE FOR DEAD LOAD DEFLECTIONS, SETTLEMENT OF FALSEWORK, IN SETTING FALSEWORK AND FORMS FOR REINFORCED CONCRETE SPANS, AN ACTUAL BEAM CAMBER. TO COMPENSATE FOR DEAD LOAD DEFLECTION, VERTICAL CURVE ORDINATE, AND BOTTOM OF TOP FLANGES, DEPTH OF SLAB BETWEEN BEARINGS SHALL BE ADJUSTED ORDINATE, AND ACTUAL BEAM CAMBER. WHERE BOTTOM OF SLAB IS IN LINE WITH BETWEEN BEARINGS TO COMPENSATE FOR DEAD LOAD DEFLECTIONS, VERTICAL CURVE UP TO THE SLAB, THE VERTICAL DIMENSIONS OF THE BLOCKS SHALL BE ADJUSTED FOR THE ELEVATIONS SHOWN. WHERE BLOCKS ARE SHOWN OVER BEAMS FOR BUILDING GIRDER BRIDGES, ADJUSTMENTS SHALL BE MADE DUE TO THE DEAD LOAD DEFLECTIONS ON PLANS. IN SETTING FORMS FOR STEEL BEAM BRIDGES AND PRESTRESSED CONCRETE DEFLECTIONS ARE DIMENSIONS AT CENTER LINE OF BEARING UNLESS OTHERWISE NOTED ALL DIMENSIONS WHICH ARE GIVEN IN SECTION AND ARE AFFECTED BY DEAD LOAD SLABS, CURBS AND PARAPETS SHALL CONFORM TO THE GRADE OR CURVE. BRIDGES SHALL BE BUILT ON THE GRADE OR VERTICAL CURVE SHOWN ON PLANS. BE LAPPED TO LOCK LEGS ON ADJOINING PIECES. LINES, THEY SHALL BE SO PLACED THAT THE ENDS OF THE SUPPORTING WIRES SHALL INDICATED ON THE PLANS. WHEN BAR SUPPORT PIECES ARE PLACED IN CONTINUOUS WIRE BAR SUPPORTS SHALL BE PROVIDED FOR REINFORCING STEEL WHERE TO OUT AS INDICATED ON PLANS. IN THE PLANS. DIMENSIONS ON BAR DETAILS ARE TO CENTERS OF BARS OR ARE OUT PLACEMENT OF REINFORCING ARE TO CENTERS OF BARS UNLESS OTHERWISE INDICATED ALL REINFORCING STEEL SHALL BE DEFORMED. DIMENSIONS RELATIVE TO OR METALLIZING. EQUIVALENT FLAT SURFACE AT A SUITABLE ANGLE PRIOR TO PAINTING, GALVANIZING, ROUNDED BY SUITABLE MEANS TO A RADIUS OF APPROXIMATELY ˆINCH OR SURFACES,ALL SHARP EDGES AND ENDS OF SHAPES AND PLATES SHALL BE SLIGHTLY WITH THE SOLE EXCEPTION OF EDGES AT SURFACES WHICH BEAR ON OTHER ELECTROSLAG WELDING WILL NOT BE PERMITTED. TO THE REQUIREMENTS OF THE CURRENT ANSI/AASHTO/AWS " BRIDGE WELDING CODE". EQUAL TO 2 TIMES THE FLANGE THICKNESS. THE SIZE OF FILLET WELDS SHALL CONFORM DO NOT EXCEED A WIDTH EQUAL TO THE FLANGE WIDTH LESS 2" OR A THICKNESS EQUIVALENT AREA PROVIDED THESE PLATES ARE AT LEAST Š" IN THICKNESS AND SUBSTITUTE FOR THE COVER PLATES DESIGNATED ON THE PLANS COVER PLATES OF THE PLATE IS IN CONTACT WITH BEARING PLATE, THE CONTRACTOR MAY, AT HIS OPTION, EXCEPT AT THE INTERIOR SUPPORTS OF CONTINUOUS BEAMS WHERE THE COVER BE PROVIDED. THE MAXIMUM SPACING SHALL BE 2'-O". STUDS FOR 4 - ƒ" ~ STUDS. STUDS OF THE LENGTH SPECIFIED ON THE PLANS MUST ALONG THE BEAM AS SHOWN FOR ƒ" ~ STUDS BASED ON THE RATIO OF 3 - ‡" ~ SHALL BE MADE AS NECESSARY TO PROVIDE THE SAME EQUIVALENT NUMBER OF ‡" ~ STUDS THE RATE OF 3 - ‡" ~ STUDS FOR 4 - ƒ" ~ STUDS, AND STUD SPACING CHANGES ƒ" ~ STUDS SPECIFIED ON THE PLANS. THIS SUBSTITUTION SHALL BE MADE AT AT THE CONTRACTOR'S OPTION, HE MAY SUBSTITUTE ‡" ~ SHEAR STUDS FOR THE NOT BE ACCEPTED. CERTIFIED MILL REPORTS ARE REQUIRED FOR METAL RAILS AND POSTS. BE OBTAINED. CASTINGS WITH DISCOLORATIONS OR OF NON-UNIFORM COLORING WILL REMOVED IN A MANNER SO THAT A UNIFORM COLORING OF THE COMPLETED CASTING SHALL FINS AND OTHER DEFORMATIONS RESULTING FROM CASTING OR OTHERWISE SHALL BE AS MANUFACTURED FOR BRIDGE RAILING. CASTINGS SHALL BE OF A UNIFORM APPEARANCE. METAL HANDRAILS SHALL BE IN ACCORDANCE WITH THE PLANS. RAILS SHALL BE RAIL SHALL BE BUILT PARALLEL TO THE GRADE OF THE CURB. ON PLANS. THE METAL RAIL AND TOPS OF CONCRETE POSTS USED WITH THE ALUMINUM RAIL SHALL BE SET NORMAL TO THE GRADE OF THE CURB, UNLESS OTHERWISE SHOWN METAL STANDARDS AND FACES OF THE CONCRETE END POSTS FOR THE METAL SPECIFICATIONS ARTICLE 105-4. OVER NOTES HEREON, AND SPECIAL PROVISIONS SHALL GOVERN OVER ALL. SEE GOVERN OVER THE SPECIFICATIONS, BUT THE REMAINDER OF THE PLANS SHALL GOVERN GENERALLY, IN CASE OF DISCREPANCY, THIS STANDARD SHEET OF NOTES SHALL REV. 12-17 MAA ( ) THC 1,200 LBS. PER SQ. IN. 1,800 LBS. PER SQ. IN. 375 LBS. PER SQ. IN. 30 LBS. PER CU. FT. (MINIMUM) STANDARD NOTES - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - EXTREME FIBER STRESS STRUCTURAL TIMBER - TREATED OR UNTREATED REINFORCING STEEL IN TENSION - GRADE 60