Loading...
HomeMy WebLinkAbout20211067 Ver 1_Resource Agency Email Correspondence_202107021 Williams, Paul C From:Jordan, Gary <gary_jordan@fws.gov> Sent:Wednesday, June 9, 2021 9:12 AM To:Williams, Paul C Cc:Barnes, Kyle W SAW; Wilson, Travis W. Subject:Re: [EXTERNAL] FW: Currituck Bridge 7 Interim Repairs Attachments:20210609_ltr_USFWS_NCDOT_Bridge260007.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.    Paul, Attached is a concurrence letter. Gary Jordan  Fish and Wildlife Biologist, Liaison to NCDOT  U.S. Fish and Wildlife Service  P.O. Box 33726  Raleigh, NC 27636‐3726    Email: gary_jordan@fws.gov  From: Williams, Paul C <pcwilliams2@ncdot.gov>  Sent: Tuesday, June 8, 2021 7:25 AM  To: Jordan, Gary <gary_jordan@fws.gov>  Cc: Barnes, Kyle W SAW <Kyle.W.Barnes@usace.army.mil>  Subject: RE: [EXTERNAL] FW: Currituck Bridge 7 Interim Repairs      Gary,     Please see attached Concurrence Request Letter and documents.     Thanks,     Paul C. Williams, Jr.  Division Environmental Officer   Division One  NC Department of Transportation     (252) 482-1861 office  (252) 333-9812 mobile  (252) 482-8722 fax  pcwilliams2@ncdot.gov    113 Airport Dr.  Suite 100  Edenton, NC 27932     2      Email correspondence to and from this address is subject to the  North Carolina Public Records Law and may be disclosed to third parties.        Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.        From: Jordan, Gary <gary_jordan@fws.gov>   Sent: Thursday, June 3, 2021 2:04 PM  To: Williams, Paul C <pcwilliams2@ncdot.gov>  Cc: Barnes, Kyle W SAW <Kyle.W.Barnes@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; fritz.rohde  <fritz.rohde@noaa.gov>; twyla.cheatwood <twyla.cheatwood@noaa.gov>  Subject: Re: [EXTERNAL] FW: Currituck Bridge 7 Interim Repairs     CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.     Paul,    Assuming no effects to Mackay Island NWR, the USFWS has no objections or concerns. You will probably need Section 7 concurrence for West Indian manatee, but I have no problem providing that since you are committing to use the manatee guidelines.    Gary Jordan  Fish and Wildlife Biologist, Liaison to NCDOT  U.S. Fish and Wildlife Service  P.O. Box 33726  Raleigh, NC 27636‐3726     Email: gary_jordan@fws.gov    From: Williams, Paul C <pcwilliams2@ncdot.gov>  Sent: Thursday, June 3, 2021 10:12 AM  To: Jordan, Gary <gary_jordan@fws.gov>; fritz.rohde <fritz.rohde@noaa.gov>; twyla.cheatwood  <twyla.cheatwood@noaa.gov>  Cc: Barnes, Kyle W SAW <Kyle.W.Barnes@usace.army.mil>  Subject: [EXTERNAL] FW: Currituck Bridge 7 Interim Repairs          This email has been received from outside of DOI ‐ Use caution before clicking on links, opening attachments, or  responding.    3    Gary, Fritz, and Twyla,     NCDOT is planning to address a serious scour issue on Bridge 7 in Currituck County.  The bridge is on Corey’s Ditch, which  experiences high water velocities frequently as it connects Back Bay to Currituck Sound/North Landing River.  The critical  scour elevation has been surpassed at Bent 2 of the bridge, and NCDOT proposes to place geosynthetic aggregate bags  around the piles of Bent 2 to prevent further scour.  The bags would be positioned using 4 steel pipes piles placed  around the bent.  The pipe piles would be used as winching points to lower the bags into position.  The pipe piles would  be cut at an elevation of ‐31’ at the end of the bag installation.  The existing power line at the site will be relocated with  a  directional bore beneath Back Bay and Corey’s Ditch.  Maps and drawings attached.      This is an interim repair project for the bridge.  The long term solution for the scour issue would be to replace the bridge,  but that would not be for several decades since this structure was constructed in 2004.     An in‐water work moratorium of March 31st – September 30th has been requested by NCDMF.  Guidelines for Avoiding  Impacts to the West Indian Manatee will be followed.  Does USFWS or NOAA Fisheries have any comments or concerns  for the project?     Thanks,     Paul C. Williams, Jr.  Division Environmental Officer   Division One  NC Department of Transportation     (252) 482-1861 office  (252) 333-9812 mobile  (252) 482-8722 fax  pcwilliams2@ncdot.gov    113 Airport Dr.  Suite 100  Edenton, NC 27932          Email correspondence to and from this address is subject to the  North Carolina Public Records Law and may be disclosed to third parties.        Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.        From: Harrison, James A <James.Harrison@ncdenr.gov>   Sent: Tuesday, June 1, 2021 10:58 AM  4 To: Wilson, Travis W. <travis.wilson@ncwildlife.org>; Williams, Paul C <pcwilliams2@ncdot.gov>  Subject: Re: Currituck Bridge 7 Interim Repairs     I'm good with those dates for the in-water work moratorium.       Jimmy Harrison  Habitat and Enhancement Section  NC Division of Marine Fisheries  james.harrison@ncdenr.gov  252-948-3835 (Office)  757-272-3230 (Mobile - Preferred)   Email correspondence to and from this address is subject to the  North Carolina Public Records Law and may be disclosed to third parties.     From: Wilson, Travis W. <travis.wilson@ncwildlife.org>  Sent: Tuesday, June 1, 2021 10:27 AM  To: Williams, Paul C <pcwilliams2@ncdot.gov>; Harrison, James A <James.Harrison@ncdenr.gov>  Subject: RE: Currituck Bridge 7 Interim Repairs      That was the moratorium included in the 2004 permit for the bridge replacement. It looks like DMF was the agency that  requested that moratorium at that time, so  I’m good with it if they are.          Travis W. Wilson  Eastern DOT Habitat Conservation Coordinator  Habitat Conservation Program    NC Wildlife Resources Commission  1718 Hwy 56 West  Creedmoor, NC 27522  Phone: 919-707-0370  Fax: 919-528-2524  Travis.Wilson@ncwildlife.org            From: Williams, Paul C <pcwilliams2@ncdot.gov>   Sent: Friday, May 28, 2021 10:37 AM  To: Wilson, Travis W. <travis.wilson@ncwildlife.org>; Harrison, James A <James.Harrison@ncdenr.gov>  Subject: Currituck Bridge 7 Interim Repairs     It’s been a couple of months since I discussed this project with you.  Attached are the bridge repair plans and the  Utilities by Others plans.  The utilities will be in a combined bore within ROW.       5 I’ll submit this to DCM as a Major Modification Request to the original CAMA Permit No. 132‐04 (see attachment G‐ Permits for the permit packet for the bridge replacement in 2004), and the Corps should be able to permit this under a  new RGP 291 (Kyle checking on that).     Just wanted to confirm the original in‐water work moratorium of March 31st – September 30th would still be in  effect.  Also, do you have any other comments on the project or have any additional questions?     Thanks,     Paul C. Williams, Jr.  Division Environmental Officer   Division One  NC Department of Transportation     (252) 482-1861 office  (252) 333-9812 mobile  (252) 482-8722 fax  pcwilliams2@ncdot.gov    113 Airport Dr.  Suite 100  Edenton, NC 27932          Email correspondence to and from this address is subject to the  North Carolina Public Records Law and may be disclosed to third parties.        Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.           Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.    Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.