Loading...
HomeMy WebLinkAbout20130427 Ver 1_Stormwater Info_20130529Stormwater a „3, a .,....a.AUa.,. „Ctv. ? tlyda hi 's. 5;'A,,, "0' 8103 Dreamy Raleigh, i,l i4 +:t4ytyiiDi411c��a�1�,2€ �i�ir, q „dd \`��f j,.1 �iL+Jcb C{,J7177r7fr..i2dtiS%ti \F«$3t '�'� 7J7w.bA�&Y�ll)Yt� •- • 1 •,R Soil & Environmental Consultants, PA 11010 Raven Ridge Road - Ralcigb, North Carolina 27614 9 Phone: (919) 846-5900 - Fax: (919) U&9467 www.SandEC.com Tableof Contents ................................................................................................................. i Listof Figures ....................................................................................................................... ii Listof Appendices ................................................................................................................ ii Project Location, Background && Description ...................................................................... I Stor[OVwaterManage00ent Plan .......................................................................................... i Nitrogen Export Calculations .............................................................................................. 2 Limitations........................................................................................................................... 3 l lm� = MMEM=.., List of Appendices III 117TWITT MOO Stormwater Management Plan N The locations depicted for the rain barrels are approximate and may require modification based on the constructed location of downspouts from the roof gutter system. Similarly the exact location and configuration of the bioretention area may moded at the time of construction however the design surface area, poncling dept and bioretention media depth will be adhered to. I Nitrogen Export Calculations Nutrient otYset in the form • Total Nitrogen (TN) buy down is required by the Division of Water Quality (DWQ) as part of the project's permitting requirements. We estimat Nitrogen Export rates associated with the existing site conditions and proposed site conditions using methods outlined in the Neuse River Basin: Model Stormwater Program for Nitrogen Control guidelines. I roll &MV49JU9 301M.M.1 - •• - a • ent at estimate the offset paym,,� 0.25 acres x 4.63 lbs./ac./yr. (8-23 - 3.60) x $20.29/lb. I Ct prior times 30 years • $704.57. We understand this fee will�be confirmed , • D WQ prior I M 4 11010 Rom Ridge Rd.- RaWgh, NC 27614 (919) WSM - (919) 646"7 Web Pap, www.SwidEC..com ,mjccc Numver: Map Title. I 2029.P I fiepre 2 - NRC5 Siod Soil & Environmental Consultants, PA 11010 Rmn Mdp Rd • RRIMOK NC 27614 (919) P&M • (M) 846-9467 Web Par: www.SwKtEC.corn 6"%,TOKMWKFF:p\ MANAGEMEN PI AN ti bhe t Title: 5TORMI B,Iffalo "LMANAGEMENT PLAN A ammu��� Location VAKE CO., NC Client: H.J. MORRJ5 CON5TRUCTION, INC. M MAW 11 11 11 zm Lvi T-1 I il F -de I i R A I i I I I ^ \ \ / ; \ /� \ \\ \ \ :\ \ } :\ / \: ^ \� w °� d / \ƒ S 101A(44-� 51ko AIL -lit wl fAA t L 5J L) \\ «� \� �� \ ^^ � !"' mm' lof�*A 6 W, 2 I 20,111MM-3 ro]Mpl � GMMMCRE�� Location:WAKE GO., NC !Client: H.J. MORK15 iCON5TRUCTION, INC. D.er�loa Co„f�9ua„k,en �* I . -- im m UA • 0 r • A Supporting Nitrogen • • CalcuWions 1,1103 Dreamy Way af � �IT I Step I Determine area for each type of land use and enter in in Column (2). Step 2 Total the areas for each type of land use and enter at the bottom of Column (2). Step 3 Multiply the areas in Column (2) • the TN export coefficients in Column (3) and enter in Column (4). Step 4 Total the TN exports for each type of land use and enter at the bottom of Column (4). Step 5 Determine the export coefficient by dividing the total TN export from uses at the bottom • Column (4) • the total area at the bottom • Column (2). PROPOSED CONDITIONS Nitrogen Export Rate Calculations: I Based on Proposed Site Uses I (1) (2) (3) (3) (4) Type of Area TN Export TN Export Land Cover (acres) Coeff. (acres) from Use Coeff. (lbs./ac./y-r.) Qbs./ y r. Peranently Protected Undisturbed 0.00 0.60 C bs./ yr. 0.00 Open Space (forest, unmown meadow) (Dist and Limited Site Buffers as Perm. Protect. Undisturbed Open Space) Permanently Protected Managed 0.25 1.20 0.30 Open Space (grass, landscaping, etc.) (Assume No Perm. Protect. Undisturbed Open Space) Impervious Surfaces (roads, parking, 0.00 21.20 0.00 lots, driveways, roofs, paved storage Open Space (grass, landscaping, etc.) (Assume All Non-imperv. Areas to be Managed Open Space) Impervious Surfaces (roads, parking, areas, etc.) 21.20 TOTAL L. ..... 0.25 0.30 Total Nitrogen Export Coefficient = L . . .. ....... 1. 0 lbs./ac./yr. PROPOSED CONDITIONS Nitrogen Export Rate Calculations: I Based on Proposed Site Uses I (1) (2) (3) (4) Type of Area TN Export TN Export Land Cover (acres) Coeff. from Use (lbs./ac./Ar.) _ C bs./ yr. Peranently Protected Undisturbed 0.00 1 0.60 1 0.00 Open Space (forest, unmown meadow) (Assume No Perm. Protect. Undisturbed Open Space) Permanently Protected Managed 0.16 1.20 1 0.19 Open Space (grass, landscaping, etc.) (Assume All Non-imperv. Areas to be Managed Open Space) Impervious Surfaces (roads, parking, 0.09 21.20 1.86 lots, driveways, roofs, paved storage areas, etc.) TOTAL 0.25 2.06 Total Nitrogen Export Coefficient 3 lbs./ac./yr. to remove enough Nitrogen to bring the TN export rate below 3.6 lbs./ac./yr. Nitrogen Export Rate Evaluation: If the computed TN export rate for the post-development site is greater than 6.0 lbs./ac./yr. then the Owner must use on-site BMP's to bring the development's export down to 6.0 lbs./ac./yr. Then the Owner may utilize one of the following options; 1.) Supplemental BMP's to reduce the TN export rate down to 3.6 lbs./ac./yr. 2.) Pay a one-time offset payment of $330/lb. to bring the rate down to 3.6 lbs./ac./yr. 3.) Do a combination of BMP's and offset payment to bring the rate down to 3.6 lbs./ac./yr. 1 of 1