Loading...
HomeMy WebLinkAbout20211061 Ver 1_CAMA Application_20210625 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Curt Grosse PROJECT NAME: Curt Grosse Docking Expansion 2. LOCATION OF PROJECT SITE: Site is located at 192 Greensboro Street on the west end of Holden Beach, Brunswick County. Coordinates: Latitude N 33.91458 Longitude W -78.29619 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit—5-20-2021 Was Applicant Present—No 5. PROCESSING PROCEDURE: Office - Wilmington _Application Received 4/29/21 DWR WQC Pre-filing date: 4/13/21 Application Complete 6/24/21 Day 30 for WQC Pre-filing 5/13/21 6. SITE DESCRIPTION: (A) Local Land Use Plan- Town of Holden Beach Land Classification From LUP—Residential (B) AEC(s) Involved: PT, CW (C) Water Dependent: Private Docking Facility—Yes (D) Intended Use: Residential (E) Water and Wastewater Treatment: Existing- Septic Planned - N/A (F) Type of Structures: Existing- Single family residence, fixed platform, floating dock,jet ski platform Planned- Install two boatlifts, access finger pier,reconfigure jet ski platform (G) Estimated Annual Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER N/A N/A N/A (A) Uplands (B) Vegetated Wetlands N/A N'A 56 SF(Shading (C) Open Water N/A N/A 442 SF. (Incorporated) (D) Total Area Disturbed: 498 sq. ft. (.01 acres) (E) Primary Nursery Area: No (F) Water Classification: SA; HQW Open: No 8. PROJECT SUMMARY: The applicant proposes to install a second fixed finger pier and two additional boatlifts, reconfigure an existing jet ski dock, increasing the total slip count from one (1) to three (3) in the Holden Beach canal system. Grosse Docking Expansion June 24th,2021 Page 2 9. PROJECT DESCRIPTION The proposed project is located at 192 Greensboro Street, on the feeder canal directly across from the north end of Burlington Street, on the west end of Holden Beach, Brunswick County. The property can be reached by traveling NC HWY 17 south towards Holden Beach. At the Supply intersection, turn left onto NC 211 S. Travel .3 miles down NC 211 S and turn right onto Stone Chimney Road SW. Drive down Stone Chimney Road for 5.5 miles and continue onto Old Ferry Connection SW for L1 miles. Turn right onto Sabbath Home Road SW and then take the next left onto NC 130 E towards Holden Beach. Travel over the Holden Beach bridge and take a right onto Ocean Blvd W. Continue for 1.8 miles and take a right onto Greensboro Street. Drive 1 mile and the project location will be located on the right hand side. The project site is approximately .17 acres and is vegetated primarily with domestic grasses and ornamental landscaping. The high ground portion is elevated approximately 5' above the normal high water(NHW) level, and the shoreline (+/- 75 linear feet) is stabilized by bulkhead. Waterward of the bulkhead, there is a band of Coastal Wetlands,which consist primarily of Spartina alterniflara, spanning the length of the property with a width of approximately 12'-15' out from the bulkhead. The applicant's property sits on a feeder canal, directly across from the north end of Burlington Street. Residential properties border the project site to the east and west, Greensboro Street borders the north, and the feeder canal borders the south side of the property. The width of the feeder canal measures approximately 102' feet at the proposed project site. Existing structures on the project site include a single family residence, bulkhead and a private one (1) slip docking facility. The existing docking facility is accessed by a fixed access pier (6' x 18'). From the east side of the terminus of the fixed access pier, an access finger platform(4' x 3') leads to a fixed uncovered platform(12' x 12') extending over the water to the south and east. From the terminus of the fixed access pier, a gangway leads south to an existing floating dock(8'x 18')which is oriented parallel with the shoreline. From the east side of the floating dock, a jet ski floating platform(6' x 12') extends parallel with the shoreline. The property is jointly owned by 12 parties (Mr. Grosse is one owner),however all parties have signed a joint agent authorization to authorize Mr. Curt Grosse to pursue this project on the property (see Signing Authority Letter dated as received by DCM 6/24/21). The waters of the canal system are classified SA by the Division of Water Quality and ARE NOT designated as a Primary Nursery Area(PNA) by the N.C. Division of Marine Fisheries. They are CLOSED to the harvest of shellfish. Based on visual observations made by DCM staff during the site visit,there appears to be NO Submerged Aquatic Vegetation(SAV) in the surrounding waters. PROPOSED PROJECT The applicant proposes to construct a second fixed finger access pier and two additional boatlifts,reconfigure an existing jet ski dock, increasing the total slip count from one (1)to three (3) in the Holden Beach canal system. Approximately 30' to the east of the existing fixed pier,the applicant is proposing to construct a fixed finger pier (40' x 4'), extending to the south,perpendicular to the existing bulkhead. To the immediate west and east of the terminal end of the proposed finger pier, the applicant is proposing to build two boat lifts (each 13' x 13')(See Site Plan Page 2 of 3). The applicant proposes to reposition the existing jet ski dock from its current position on the eastern side of the existing floating dock to a new position on the immediate western side of the floating dock, and turned 90 degrees back towards shore, in an orientation parallel with the existing access pier. The proposed new location of the floating jet ski dock would encroach into the western riparian corridor setback,however the appropriate waiver has been obtained. The proposed easternmost boatlift would encroach into the eastern riparian corridor setback, however the appropriate waiver has been obtained. The constructed features would increase the slip count from 1 to 3, in water depths from 0 to -3.1' @ NLW, according to the applicant. Grosse Docking Expansion June 24h,2021 Page 3 10. ANTICIPATED IMPACTS The proposed docking facility expansion would incorporate an additional 442 sq. ft. of Estuarine Waters and Public Trust Area and shade 56 sq. ft. of Coastal Wetlands. The docking facility would remain consistent with similar pier length requirements (established pier-head line). The proposed docking facility would encroach into the 15-foot riparian corridor setback of the eastern and western property owners however the waivers have been obtained. Minor increases in turbidity should be expected during piling installation. Submitted by: Patrick Amico Date: June 24th, 2021 Office: Wilmington 0_00 SEA DOG MARINE CONSTRUCTION !t . ` 107 SW 9TH STREET OAK ISLAND, NC 28465 April 13,2021 Mr.Patrick Arnico Wilmington Region District Manager NC Division of Coastal Management Department of Environmental Quality 127 Cardinal Drive Ext. Wilmington NC 28405 RE: (Project Narrative) 192 Greensboro Street Holden Beach,NC 28462 The Owner of the canal front property located at 192 Greensboro Street on Holden Beach NC wishes to install two boat lifts at their property.To access the proposed boat lifts a new forty-foot long finger pier will be constructed between the lifts(see site plan).This property has an existing pier/deck with a floater as well as a jet ski float.The existing pier/deck and the associated floating dock are to remain in place.The existing jet ski dock is proposed to shift to the east and rotated 90 degree. Typical canal lots on Holden beach are 50'wide. 192 Greensboro street is larger than a single lot totaling approximately 75 LF of shoreline allowing for a shaded impact up to(600 SF).Please see the shaded impact table below for the project site. Covered Area Table Ex Descriptiont 8'x18'Dimensions Sg4arF Footage Ex.Pier - 144 5 6'Wide Exempt _Ex.Pier Head/Deck 12'X12' 144 SF - Ex.Jet Ski Float 6'x12' 72 SF Pier Access(4'x3') 4'x3' 12 SF Proposed 4'Access Pier _4'x40' _ 160 SF Total Area 532 SF The addition of two boat lift will provide to owner a total of%slips.The neighboring property to the East and West have agreed to waive their shared 15'riparian offset limit allowing room for construction of the additional lifts.Sea Dog Marine Construction has made a site visit to confirm the site plan attached with this narrative. Construction will take place on the water by barge.The barge will be spudded in place during construction at the project site. Please find the following documents attached with this project narrative: 1. DCM-MP-1 Form 2. DCM-MP-4 From 3. 192 Greensboro Street Location Map(Page 1 of 3) 4. 192 Greensboro Street Site Map(Page 2 of 3) 5. 192 Greensboro Street Section View(Page 3 of 3) RECEIVED 6. DWR Pre-Filing Meeting Request 7. Property Deed 8. Agent Authorization Form A PR 2 2021 9. McCormick Property Notification 10. Rogers Property Notification DCM WILMINGTON, NC Adam Greene, PE General Contractotr NCL#82621 Mobile: 910-876-0852 OCM MP-1 APPLICATION for Major Development Permit1111 (last revised 12f27/08) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/Landowner Information Business Name Project Name(if applicable) Tanger James R Etals 192 Greensboro Street Applicant 1: First Name MI Last Name Curt Grosse Applicant 2: First Name MI Last Name if additional applicants,please attach an additional page(s)with names listed. Mailing Address PO Box 12941 Darby Chase Dr CityC State Charlotte NC ZIP Country Phone No. 28277 FAX No. US 704 -517 -0909 ext. I+ Street Address(if different from above) - City State ZIP Email grossecs@gmaii.com 2. Agent/ContractorInformation Business Name Sea Dog Marine Construction Agent/Contractor 1: First Name MI Last Name Adam Fi Greene Agent/Contractor 2: First Name MI Last Name Mailing Address PO Box City State 107 SW 9th Street Oak Island NC ZIP Phone No. 1 28465 Phone No. 2 ext. - ext. FAX No. Contractor 83737 Street Address(if different from above) City 1 State ZIP Email Seadogmarinecons#ruction@gmail.corn RECEIVED <Form continues on back> APR 2 9 MI 252-808-2808 :: 9-888-4RCOAS7 :. w"vw.nccwastalsnanagem vi° mmQTQl11r Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County(can be multiple) Street Address State Rd.# Brunswick 192 Greensboro Street Subdivision Name City State Zip Holden Beach NC - 28462 Phone No. Lot No.(s) (if many,attach additional page with list) ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Lumber Feeder Canal c. is the water body identified in(b)above,natural or manmade? d. Name the closest major water body to the proposed project site. ENatural ®Manmade ❑Unknown AICW e. Is proposed work within city limits or planning jurisdiction? f. If applicable,list the planning jurisdiction or city limit the proposed EYes ❑No work falls within. Holden Beach 4. Site Description a. Total length of shoreline on the tract(ft.) b. Size of entire tract(sq.ft.) 75 7405 c. Size of individual lot(s) d. Approximate elevation of tract above NNW(normal high water)or 75'x100' , NWL(normal water level) (If many lot sizes,please attach additional page with a list) 4' IINHW or DNWL e. Vegetation on tract Grass f. Man-made features and uses now on tract Residential Lot on Manmade Canal g. Identify and describe the existing land uses adjacent to the proposed project site. Residential Homes h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? HB-R-1 (Attach zoning compliance certificate,if applicable) DYes ❑No jXINA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done far the tract? If yes,attach a copy. Dyes ®No DNA If yes,by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a Dyes ®No DNA National Register listed or eligible property? <Form continues on next page> RECEIVED APR 2 9 2021 252- 0 -2t t3$ .. 1®$ 8p COA,S ' .. www.nccoastalrnanagemenbC WILMINGTQN NC Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ❑No (ii)Are there coastal wetlands on the site? IJYes ❑No (iii)if yes to either(i)or(ii)above,has a delineation been conducted? DYes No (Attach documentation,if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. City Water p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial,public,or private use? ❑Commorcial ❑Pubiic/Governmen# ®PrivateJCommunity b. Give a brief description of purpose,use,and daily operations of the project when complete. Residential Boat Storage c. Describe the proposed construction methodology,types of construction equipment to be used during construction,the number of each type of equipment and where it is to be stored. Work to take place from barge.Barge to be spudded in place on project site for the duration of the work. d. List all development activities you propose. 2 Boat Lifts,Shift existing Jet Ski Float and a Finger Pier e. Are the proposed activities maintenance of an existing project,new work,or both? New f, What is the approximate total disturbed land area resulting from the proposed project? 160 ®Sq.F# or DAcres g. Will the proposed project encroach on any public easement,public accessway or other area DYes ®No DNA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No Existing direct discharges onsite.No changes proposed.Existing site drainage is by sheet flow wastewater or stormwater be discharged into a wetland? DYes ®No DNA If yes,will this discharged water be of the same salinity as the receiving water? DYes ❑No DNA j. Is there any mitigation proposed? DYes No DNA if yes,attach a mitigation proposal. Form continues on back> RECEIVED APR 2 9 2021 252 0a-286a 1-S88 4RCOAST www§nccoastal rnasaagem et im WILMINGTON, NC Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6 Additional►nformation In addition to this completed application form, (MP-1)the following items below, if applicable;must be submitted in order for the application package to be complete, Items(a)-(I)are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate,dated work plat(including plan view and cross-sectional drawings)drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work,clearly indicate on maps,plats,drawings to distinguish between work completed and proposed, c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed(with state application only)or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront(riparian)landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Rogers Joe Kenneth Address 188 Greensboro St Holden Beach Phone No. Name Address Phone No. Name McCormick Donald M Et McCormick Gay M Address 194 Greensboro Street Phone No. g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers,permittee,and issuing dates. h. Signed consultant or agent authorization form,if applicable. i. Wetland delineation,if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.G.Environmental Policy Act(N.C.G.S. 113A 1-10),if necessary, If the project involves expenditure of public funds or use of public lands,attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land • I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit, I certify that i am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge.Date a; 3oa t Print Name Curt Grosse Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges DDCM MP-3 Upland Development and Culverts Tiocm MP-4 Structures Information RECEIVED APR 2 9 2021 252-808-.2eCia 1.888-4RCOAST aastsaiil aria- esnv,„tDCM WlLmINGTON, NC Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Bo sure to complete al!other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS El This section not applicable a. (i) Is the docking facility/marina: b. (i)Will the facility be open to the general public? ❑Commercial ❑Public/Government ®Private/Community EYes ®No c. (i)Dock(s)and/ori. d. (i)Are Finger Piers included? DYes ElNo (ii)Number If yes: (iii)Length 40 (iv)Width 4 (ii)Number (i (v)Floating ❑Yes ®No )Width (iv) (v)Floating ❑Yes ❑No e. (i) Are Platforms included? Dyes InNo f. (i) Are Boatlifts included? ®Yes ❑No If yes: If yes: (ii)Number (ii)Number 2 (iii)Length _ (iv)Width (iii)Length 13 (v)Floating ['Yes ❑No (iv)Width 13 Note: Roofed areas are calculated from dnpline dimensions. g. (i)Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service,including travel lift and/or rail,repair or (ii)Number of slips existing maintenance service ❑Dockage,fuel,and marine supplies ❑ Dockage("wet slips")only,number of slips: ❑ Dry storage;number of boats: ❑Boat ramp(s);number of boat ramps: ®Other,please describe: Residential Boat Lift i. Check the proposed type of siting: 1. Describe the typical boats to be served(e.g.,open runabout, ❑Land cut and access channel charter boats,sail boats,mixed types). DOpen water;dredging for basin and/or channel Open Runabout ['Open water;no dredging required ❑Other;please describe. N/A k. Typical boat length: 20 I. (i)Will the facility be open to the general public? Dyes No RECEIVED m. (i)Will the facility have tie pilings? 4 Eyes No (ii)If yes number of tie pilings? APR 2 9 2021 DCM WILMINGTON, NC 252-808-2808 :: t-888-4RCOAs'T e. www.necoestadreanagementnet revised: 12l27iE16 Form DCM MP-4 (Structures, Rage 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑Office Toilets ❑Toilets for patrons;Number; ; Location: ❑Showers ❑Boatholding tank pumpout;Give type and location: b. Describe treatment type and disposal location for ail sanitary wastewater. c. Describe the disposal of solid waste,fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i)Give the location and number of"No Sewage Discharge"signs proposed. (ii)Give the location and number of"Pumpout Available"signs proposed. f. Describe the special design,if applicable,for containing industrial type pollutants,such as paint,sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and"No Wake"signs proposed. i. Give the location of fuel-handling facilities,and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and five-aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina,what types of services are currently provided? RECEIVED APR 2 9 2021 i CM WILMINGTON, NC 252-808-2808 n 1-888- 1WOAST.ewwwatecesstalmanagerrieritnet revised:12i27I06 Form CCM MP-4 (Structures, Page 3 of ) m. Is the marinaldocking facility proposed within a primary or secondary nursery area? ❑Yes nNo n. is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ©No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh(CVV),submerged aquatic vegetation(SAV),shell bottom (SB),or other wetlands(WL)? If any boxes are checked,provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? Eyes 'gNo • If yes,give the name and address of the leaseholder(s),and give the proximity to the lease. 3. BOATHOUSE(including covered lifts) IA This section not applicable a. (i) Is the boathouse structure(s); ❑Commercial ❑Public/Government ❑Private/Community (ii)Number _ (iii)Length (iv)Width Note: Roofed areas are calculated from dnpline dimensions. 4. GROIN(e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) 0qThis section not applicable a. (i) Number (ii)Length (iii)Width 5. BREAKWATER(e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW,NWL,or wetlands c. Maximum distance beyond NHW,NWL or wetlands 6. MOORING PILINGS and BUOYS ! ®This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline d. Description of buoy(color,inscription,size,anchor,etc.) Note: This should be measured from marsh edge,if present. e. Arc of the ECEIVED APR 2 9 2021 OCM WILMINGTON, NC 252-808-280 : 1-8t3 3-4RCOAST eewww.riccoastaireariaperneritmet revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 rf 4) 7 GENERAL a. Proximity of structure(s)to adjacent riparian ro A perty lines b. Proximity of staicture(s)to adjacent docking facilities. 1 5'Western Limit /1'Eastern Limit 10'+/_ Note: For buoy or mooring piling,use arc of swing including length of vessel. ° c. Width of water body E g d. Water depth alwaterward end of structure at NLW or NWL 3.9' e. (I) Will navigational aids be required as a result of the project? ❑Yes ❑No ®NA (ii)It yes,explain what type and how they will be implemented. 8. OTHER This section not applicable a. Give complete description: Date 1'1 Cru,ns 5z#-- Project Name Appli nt Nam Applicant Signature RECEIVED APR 2 9 2021 DCM WILMINGTON, NC ; 52-BDd-2808 1-888 -: . - - . DWR Pre-Filing Meeting Request Form NORTH CAROLINA Enrkonffltntarf QIpfT,y Contact Name* Adam Hobby Greene Contact Email Address* seadogmarineconstruction @gmail.cam Project Owner* Tenger James R Etals 4 Cu-f&e-p8 SC-- Project Name* 192 Greensboro Street Project County*tY Brunswick Owner Address:* Street Address 192 Greensboro Street Address Line 2 City State/Ravine/Ron Holden Beach NC Fbstal/Zp C':rie Country 28462 United States Is this a transportation project?* e Yes No Type(s)of approval sought from the DWR: r� 401 Water Quality Certification- r 401 Water Quality Certification- Regular Express r Individual Permit r Modification I— Shoreline Stabilization Does this project have an existing project ID#?* r Yes ' No Do you know the name of the staff member you would like to request a meeting with? Robb Mairs Please give a brief project description below and include location information.* installation of 2 boat rifts and an access pier Please give a couple of dates you are available for a meeting. 4/14/2021 4/20/2021 Please attach the documentation you would like to have the meeting about. 192 Greensboro Street SITE PLAN.pdf 1.06MB P If nNY By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature* Submittal Date 4/13/2021 RECEIVED :DECEIVED APR 2 9 2021 APR 'r 7fol • 0CM WILMINGTON, NC ;::;:: ` ., ..,z; ;;4. .;--N NC Client Contact Report Page 2 • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. Sincerely, SEA DOG MARINE CONSTRUCTION RECEIVE_ APR 29 2021 DC114 WILMINGTON, NC ?1a SrA7£ -ems ROY COOPER y c,;: Governor JOHN NICHOLSON ; az Interim secretary r" ^ "b BRAXTON DAVIS Director NORTH CAROLINA Environmental Quality SENT VIA EMAIL Sea Dog Marine Construction do Mr.Adam Greene 107 SW 9th St. Oak Island,NC 28465 RE: CAMA Major Development Permit Application—Curt Grosse Docking Expansion 6/24/2021 Dear Mr. Greene: The Division of Coastal Management hereby acknowledges receipt of your application,acting as agent for Curt Grosse, for State approval for the expansion of a private docking facility located at 192 Greensboro St.,Holden Beach,Brunswick County,NC.It was received complete on June 24th, 2021 and appears to be adequate for processing at this time. The projected deadline for making a decision is September 7th,2021.An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances,this letter will serve as your notice of an extended review. However,an additional Ietter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from June 24,2021 you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner,developer, and project designer/consultant. NCGS 113A-119(b)requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a"Notice of Permit Filing"postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be:Nailing the notice card to a telephone pole or tree along the road right-of-way fronting the road right-of-way where a private road would lead one into your popertypFailute}to post this or at a nnoticet n could result in an incomplete application. An onsite inspection will be made,and if additional information is required,you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely fatfi � Patric ico- Field Representative cc: DCM,MHC Rhonda Wooten,LPO WIRO DCM USACE DWR Curt Grosse,Applicant North Carolina Department of Environmental Quality 1 Division of Coastal Management i .D Wilmington Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 awrwmr�w.�arq 910.796.7215 ) • , a Iwo% - m r U CC VII < W a a)s_as0' 7) o � w- N H -(---) isQ . _PIN (,) • . a u. i.D. ■ N � c ��" E 0O 0 N o 0 ..- 2 - . i-i: ' .(sc . ' r' ' F N o — — � � W . VI I I 0 0 �+ o I LL MO (1) 1 0 1' 0 0 (1)a o V D milO4-6 vw . •— ■ Ark 12- � — 0 •, �' E vw 4 J C .12 i , ,('- CI v t m F. 0 C t ., = cn 0 ao s ° 04 E a CL ' CL -� 0y i• 4 a ■ 4 Mei a CD c4 T. CO 0 . — 4 . - . O L ,. 1. g ° c E o d t cl R ' — , _ z � v, av� CL y i a 0 U le C 44 2 i � v V" 41 'Q a ROY COOPER Governor ' JOHN NICHOLSON Interim Secretary NORTH CAROLINA BRAXTON DAVIS Environmental()uulfry Director,Division of Coastal Management June 25,2021 Advertising@starnewsonline.corn 2 Pages Star News Legal Advertisement Section Re: Major Public Notice for: • Curt Grosse Hello: Please publish the attached Notice in the Thursday,July 1,2021 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Tanya Pietila at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington,NC 28405, 910-796-7226(Customer No. 489895). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions,please contact me at our Wilmington office. incerely, l aho Tan 4. . Pietila Permitting Support&Customer Assistance cc: MHC Files Gregg Bodnar—MHC USACE State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext.,Wilmington,NC 28405 919 796 7215 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A- 119(b) that the following applications were submitted for a development permits in Areas of Environmental Concern as designated under the CAMA: On June 24, 2021, Curt Grosse proposed to install a second finger pier & two (2) additional boatlifts for a total of three (3) slips at 192 Greensboro St., adjacent to a canal in Holden Beach, Brunswick County. Copies of these applications can be examined or copied at the office of Patrick Amico N.C. Dept. of Environmental Quality,Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington,NC 28405, (910) 796-7425 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to July 22, 2021 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Tanger James R Etals g Cw Gres e Mailing Address: C_ II 12941 Darby Chase Dr da✓I6 Sc Q S .7 c Phone Number: 704-517-0909 Email Address: grossecs@gmaiLcom I certify that I have authorized Sea Dog Marine Construction Agent/Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: New Finger Pier and Boat Lifts at my property located at 192 Greensboro Street in Brunswick County. 1 furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: CLA-42 r -4A•14)*- Signature COAT 6 o55V-- Print or Type Name Title Y I ICo i 07-0.2 Date RECEIVED This certification is valid through 12 12 2025 APR 29z 21 RCMP WILMINGTON, NC DocuSign Envelope ID:027B66A9-1417-415E-8640-67578197B380 1 /, a /47 June 20, 2021 We,the undersigned, are deeded co-owners of the property located at 192 Greensboro St. in Holden Beach, NC. With our signatures below we are allowing Curt Grosse, one of the co-owners,to sign any documentation involved in the permitting process for the proposed boat lift/ramp/floating dock resurfacing project per state and local guidelines. Signed: Karl Hesse signed: Nest- date: 6/23/2021 °°"P°"° 6/23/2021 Mersa Hesse 6/21/2021 Lewis Wolhar °� (Al Jl °°'S'°'"° 6/21/2021 Judy Wolhar A d & ,� DearSigine Mitch Varner M, Uarxtir 6/21/2021 e—°°a"°°°°" 6/21/2021 Kathee Varner U +^ '-,araeetaU12S4V_ "" °°`""'°� 6/21/2021 I JII James Tanger ' toNGft Trish Tanger 6/21/2021 6/21/2021 Malcolm McLaughlin [i�satcebw 6/21/2021 Carol McLaughlin C At444tAlik. wexaa,aurz.a_ °°° "°n' 6/21/2021 Jill Grosse 1 avast. 6/21/2021 Curt Grosse ECta Gres% AtetiVED 4 Z021 CERTIFIED MAIL • RETURN RECEIPT REQUESTED DIVISION OF COASTAL. MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM Name of Property Owner: Tanger James R Etals Address of Property: 192 Greensboro Street, Holden Beach NC (Lot or Street#, Street or Road, City&County) Agent's Name ft: Sea Dog Marine Const. Mailing Address: 107 SW 9th Street Agent's phone#: 910-876-0852 Oak Island NC 28465 I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing_the development they are proposing.A description or drawing, with dimensions, must be provided with this letter. bin 1 have no objections to this proposal. I have objections to this proposal. if you have objections to what is being proposed,you must notify the Division of Coastal Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext., Wilmington, NC, 28405-3845, 0CM representatives can also be contacted at(910)795-7215.No response Is considered the same as no obJedtlon if you have been notified by Certified Mall. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) do wish to waive the 15'setback requirement. I do not wish to waive the 15'setback requirement. (Pro•arty Owner Information) (Adj c nt Property Owner Information) gr ! o Signature gnat re Curt Grosse Print or Type Name Print or/Type Name dot S 194 Greensboro Street Mailing Address Mailing Address e (6) AV.7 7 Holden Beach,NC 28462 City/State/Zip` CityIStatee Zip (70) sl7- Osi'Oct Telephone Number Telephone Number Y f411 Deaf � / RECEIVED Date Dale Revised 6/18/2Ailaki2 9 2021 DOM WIi!MINGTON,N DocuSign Envelope ID:C3349511-ADFD-46A9-A6C7-4E37735BBD90 •ir liL - Re 1 utcrlt r c,...r.rr . DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONMfAIVER FORM Nance`of Property owlier Tanger James R Etals ~N. Address of Property 192 Greensboro Street, Holden Beach NC `• (Let or Street#, street or Road, City&Counly) Agents Nairte#: Sea Dog Marine Const. Mailing Address: 107 SAN 9th Street A tic:.phone#: 910-876-0852 Oak island NC 28465 I hereby certify that 1 own 'property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing_the development they are proposing-A description or drawing,with dimensions, must be provided with this letter. f , I have no objections to this proposal. I have objections to this proposal. t.,ek_ you have objections to what is being proposed,you must notify the Division of Coastal Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext., Wilmington, NC, 28405-,3845. .DCM representatives can also be contacted at(910) 796_7215 No response is considered the same as no objection if you have been notified by Certified Malt l understand that a l8f., WAIVER SECTION }p .. dock, mooring pilings, breakwater boathouse, lift, or groin must be set back a-minimum.distance-of 15'from myarea of ri ariart access unless waived by me you-.: i.; � � -, nx - . 7. C_, I:do wish to waive the 15'setback requirement. I do not wish to waive the 15 setback requirement. ( 'ropor ,Owner Information) Adjacent Pr©Party Owner.In ormation) , 'ignti tl Signature sTJ hurt tGrflsse. ' ' c: • Print or Type Name Print or.Type Name Curt rrsse -' • 188 Greensboro St _ Mailing Address It eling Address • 5237 9C�i.rlJ his• ct - 3 . . - j � pi�y,NC 2$462 Ctty/S p - City `r ip ----___;-,.._ .; -,..1.;,,...0:rft---5:::..-:4--.:it-p.s.- ,:-_,,:i4:74--...,f...:-,: ::.:.:-..-_•,.-......,„-„:„.,;,-,,,:„., _ __._ i_f_. . , , . . Tel v`" , `. Yr Te j'hone trm - ,-". . F" , xis 1 -' , h,,, �qqr x °•�, r r s y 7 n . q� Date .SX ," s' T -s� '#Y sPi.4 `�.Y _ : i R -,-,,,x Ss��'.f - zom s - _,A �P-�o }�I/�/. i-fi 1}�'(J{1 Tit e 4 g-7,44 �F*.F } A.% d"'� f 1G: ti+Mi'�'f" W Y.I - $Fug-^ 4 h x - [ j x st,4 '' <- c�-- �w$_ 1' rti 4 - fit'`°', +7> get. hl FA r., ' r r fc nv •, �V WILMINGTAI' , NC x U Z Z LLi o Q W C K - .' 4*(:;--- ' i.-- d CC .0C cnC7o El. € y 1 � N 151 T�T y u.t i • a g 3 (nWeg ri . o U o° 3 �00000 g. a Z9Sh LLLE 0000 05h2 020L W N 1 I 9 a � > 4— W u.I a zl- •LCD EL4. ?'a. V/ 0fl U. 3 g i - �'PAq N N - .g I / _ ee o OCL � ty ffi m � m3 �g m co fi 8 $, g ,. - E g j o LL! gg LL 05Eh 6Lc.E 0000 0Sh2 0202_ ,(--- ., a ...--,,L ,_...... c . ,. .. , „. , , ,.. „ , ... , , ..;., ,. _ , , A.-- 4 .-;?:,., -4 ' -"" 411, - ,4s 1- t . A C--) Q �� ■d 0 C.: 0 Z h ti I .R Z 1S 1NIOd HOIH e, # a -...._. - -. - --__._ 3i CI CO LL s. III CO wr W/ 00 i ° 0 r .' a. N z Uy i , sue` * t 1,' m Q N_ Q m is -.° - 4 r" 2 D z m Zzr !JJA - 0 2 0 lik _ _ * & r z . W Z a f 3 ' J • } Q N O ,� x-". _ 0 141..• _ zo . t P Z* a 0 : .. : o _J - u_4 y . _ ------z'-.-1-f,:',,,f-,- , • I -' NNN.,,,N1 CO o rt Z o cN g O 0 ,+ W Z W O v _ � " - - H ... -- o 2�C1 13NN08 HOlOOS H WLns N 1. �; •2�a 2ib-�OaUNdS , o 1 o ----____ -. Ativ s, -•�% 0 z ® _ 0 w 0 icilliC\ ° O w co O ,,j �. co W OCI) z O 1 CD Uei � QO O a I. in .4(C) d' 0 0 0 x Z D Z W h QC, (P fl ( z z 0I- .) Z • < U III Z ocn w �,_ ¢ W Z o� 0 Q o 0o "' 0_ f- 1- � � W N p � � m � ocn �' - _ LL m z*wcn LL T b � Q CO I-- V� xw co .: cL Cn � 7Cr) Fes- w z U) 0 I Q W w Q O EL Q _ 0 p co < X ELI ---= _____ - - QZ I- - Q p _J © E 1- L J Q ° w z r6 EELu 1- - a w 0 W LOLL zo < - o tzp 0 - O +j V? w z U1 N o o w w Cv- V) o H w II CC O Q i I N N. 0 CS? .! 1r .-.1',, c`, 1 r"--- . AO c) .7=t). ',wail .Z-c./ --- ii-ireiWck tit.V. INAr ' 0 z 0 .'---' if; IA.! cJ 1-- i > 0 ..... L--- ,---1 0 Ui = —,, LI Cl) La ' ,0 F71 1 0 Y _i -D- LI Z 7 CO CO L 6_,.. -cs _ ..--. LL ..... •': in 0 ). LI LA 0 ,--1 in V) I in co in W in .71- (Ni W 1: Ki --.- (4 -• licimis < (I) cn o 11 P,. 0 z — / 0 i ..,_ f: CNJ (-9 0 6- RiP —. w 1— co < cp > I: I Si D Z co z ° al Z 0 E CC I-1-1 in 0 i----- 0 E o t-N 0 w C 1) 5 < L, v, Li-- Li, ,...) , 0 < <, 0 03 , N in Lu cn o a_ o o_ w I- -J Li- 5-- = .1- < 0 ° LL-1 ED cf) o o_ 0 tt \ ‘ \ 1 0 I , _ H \ \ r-------- r----- . !, ___-aE STAT£aF n OF ROY COOPER , r_ ,__ Governor °V o l JOHN NICHOLSON , �� �=a Interim Secretary ft` "o-=' BRAXTON DAVIS NORTH CAROLINA Director Environmental Quality June 25, 2021 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ- Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar@NCDENR.gov SUBJECT: CAMA Applicant: Curt Grosse Project Location: 192 Greensboro St, adjacent to AIWW/feeder canal in Holden Beach, Brunswick County. Proposed Project: Proposal to install a second fixed finger pier and two additional boatlifts, reconfigure an existing jet ski dock, increasing the total slip count from one (1) to three (3) in the Holden Beach canal system. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by July 22, 2021. If you have any questions regarding the proposed project, contact Patrick Amico at (910) 796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME AGENCY SIGNATURE DATE D_E Q North Carolina Department of Environmental Quality . Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 NORTH CAROLINA m Depeme t ofEnvironmental Quality /`� 910.796.7215 12-at 20t e 111111IIII1II111lN111111IIlIl1v111 84141 P 9=11°21- Ai31isO Btt toeruriswick County. NC Register of Dssds page 1 of 3 me PO ifrifKliagt Brenda H. CIensions Register of Deeds velum lOxe3,fees,ilagifigeMBNI of whir 12-31-2e18 11:47:20.90e Bru ewiok County, NC Om which the BIUnBVibl1 C gilt' ex NC STAMP: $132.M (1613227)Colleolor is charged Moo SW so •oftParcel Number��COO as rotated by 81B Brows e*Cetieler / nr�+,U Ammons orb*. Mk l► otr-nuns 1"+ /I 1Ii! Ste pereef number mete ee Wit/ttkarZ' 4,41CA(11.9 3 ?arum to !v 1-ywo -��al f3ev lint- 111 K3 Ckfl h$ 17lR[s� f.Ats4)"wow./8yl.1511rio's. 'efund .ash$- finance rtions Of document are illegible due to condition of originEi. Occumerit contains seals verified by originai =urne that cannot be reproduced or copied. NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax$132.00 Recording Time,Book and Page Parcel Identifier ea 311r1 COO Verified by County on the day of 20_. By • Mail To: J.JEROME MILLER 319 S.SHARON AMITY STE 350 CHARLOTTE,NC 28211 This instrument was prepared by J.JEROME MILLER. Attorney at Law brief description for the Index: LOT 209&E 1/2 LOT 208 HOLDEN BEACH THIS DEED made tbis_28TH Day of DECEMBER 2018 ,by and between GRANTOR GRANTEE JOHN A.SHROM AND WIFE MITCHELL VARNER MELINDA SHROM AND WIFE KATHLEEN VARNER 9200 SKIPAWAY DRIVE WAXHAW,NC 28173 4700 COTTON CREEK DRIVE CHARLOTTE,NC 28226 • Enter in appropriate block for each Grantor and Grantee:name,mailing address,and,if appropriate,character of entity,e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties,their heirs,successors,and assigns,and shall include singular,plural,masculine,feminine or neuter as required by context Page 1 of 2 NC Bar Association Form No.3 O 1/12010-Printed by Agreement with the NC Bar Association-1981 RECEIVED APR 2 9 2021 DCM W!LMINQTQNf 11I1IEIIII11ll11I1II111111Igi1 14141 P 6 rt:4 �. 72-3�t-y@ig� Brunswick County, NC egastsr of t)eetts Cleaver: PROP Pape Cleaver of 3 W1TNESSETH,that the Grantor,for a valuable consideration paid by the Grantee,the receipt ofwhich is hereby acknowledged,has and by these presents does grant,bargain,sell and convey unto the Grantee in fee simple,A 1/6Th UNDIVIDED INTEREST IN AND TO THAT that certain lot or parcel of land situated in the City of HOLDEN BEACH Township, BRUNSWICK County,North Carolina and more particularly described as follows: SEE EXERIT A ATTACHED FOR LEGAL DESCRIPTION The hereinabove described was acquired by Grantor by instrument recorded in Book 2848 .Page 1085 All or a portion of the property herein conveyed includes or X_does not include the primary residence of a Grantor. A map showing the above described property is recorded in Plat Book_ 6 Page _132 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee,that Grantor is seized of the premises in fee simple,has the light to convey the same in fee simple,that title is marketable and free and clear of all encumbrances,and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever,other than the following exceptions: EASEMENTS AND RESTRICTIONS OF RECORD IN WITNESS WHEREOF,the Grantor has duly executed the foregoing as of the day and year first above written. (SEAL) (Entity Name) JO A.SHROM By. (SEAL Title: (SEAT.) By: MEL A S OM Title: (SEAL) State of North Carolina-County of MECKLENBURG I,the undersigned Notary Public of the County and State aforesaid,certify that JOHN A_SHROM AND MELINDA SHROM personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this 7 day of . 7 k My Commission Expires: 1 ants zrc z tai� Notary Pu Tic Noah Carolina Cammissiots 1-1 Notary Printed Name Page 2af2 NC Bar Asocatiou Form M.301/1/2010-Printed by Aft with the NC Bar Associatiaa-1921 RECEIVED APR 2 2021 QCM W!LMJJGTAN, NO 11111111111111111111111111111111111 P141 P@261 ; 7;72 Brunswick County, NC Register of eDeeds page 3 of 3 EXHIBIT A LOCATED IN MECKLENBURG COUNTY,NORTH CAROLINA AND MORE PARTICULARLY DESCRIBED AS FOLLOWS: • A 1/6Th undivided interest in and to that certain parcel of land BEING ALL of Lot Number 209 and the easlem one-half of Lot Number 208 of the Channel • Lot Development of Holden Beach Realty Corporation which is recorded in the Office of the Register of Deeds of Brunswick County in Map Book 6 at Page 132. Also being more recently described in a survey'plat designated "Lot 209&one-half 208"bearing dimensions 75 feet frontage on Greensboro Street and the Canal and 100 feet in depth and being bounded on the North by Greensboro Street on the East by the Western property line of Lot 210 on the South by the Canal and ortibe West by the Western one-half of Lot 208 as more particularly described la a map for BILL Garrick dated 5 June 1980,prepared by Thomas W.Morgan,R.LS.,which is recorded in Book 475,Page 831 of the Brunswick County Registey and Incorporated herein by reference as a part pf this Deed. . • • . • • . • • • • • • RECEIVED APR 2 9 PCM WI .MINGTON, NC Major Permit Fee Schedule Project Name: Ch(f� County: fFa#Kw,C 1c Check No &Amount: Cvtrsse 'DOCV,M5 Screwy, 56`r (141__firtessiecg, C+ 140 1(64 r)eitei6 DCM % DWQ % Development Type Fee (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development, that does not involve the filling or 25 100% ($250) 0% ($0) excavation of any wetlands or FJA open water areas: ll_ Public or commercial development that does not involve the filling or excavation $400 100% ($400) 0% ($0) of any wetlands or open water areas: Ill. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: IRA), Private, non-commercial development, if General Water Quality $250 100% ($250) 0% ($0) Certification No.4175 can be applied: 1Il(B). Public or commercial development, if General Water Quality Certification $400 100% ($400) 0% ($0) No.4175 can be applied: III(C). If General Water Quality Certification No.4175 could be applied, but DCM staff determined that additional ° ° review and written DWQ concurrence is $400 60/o ($240} 40/° ($160) needed because of concerns related to water quality or aquatic life: ill([])_ If General Water Quality $400 60% ($240) 40% ($160) Certification No.4175 cannot be applied: IV. Development that involves the filling and/or excavation of more than one acre $475 60% ($285) 40% ($190) of wetlands and/or open water areas: