Loading...
HomeMy WebLinkAbout20210512 Ver 1_Revised Impact Table - PCN form - printed 7-1-21_20210701C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections ❑ Wetlands were completed below for your project (check all that apply): ❑ Buffers ❑ Open Waters ❑ Pond Construction X Streams — tributaries 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT to Beaverdam Creek PER Corps 3.6 28 S2 T Excavation UT to Beaverdam Creek PER Corps 3.6 20 S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 48 3i. Comments: S1 permanently impacts 0.0036 acres of stream bed and S2 temporarily impacts 0.0017acres of stream bed. Page 4 of 10 PCN Form — Version 1.4 January 2009