Loading...
HomeMy WebLinkAbout20210512 Ver 1_Figure 6 - Revised - Stream Impacts - printed 7-1-21_20210701VZONING '\ / /� ZONING :RS4 I : RM 16 1 JUDY K. BOOTH I PIMAI YAO 8 / I D B. 1292 PG. 171 I D.B. 4566, PG. / a m % / / I ZONING RM .. I , , , I I ZONING : RN / / 1 / I ROAD CROSSING \ \ \/ �\\ ____ \\ , / / / , orS•48'• E 673.30' '. )- \` .�' _ I 1 EXISTING CULVERT: 31 LF PROPOSED CULVERT: 56 LF \ \ \\ , •4,e opo"911 �rE PIN: 9750-18-4870 / 1���� 2 / , , ' Qom KAREN G. NOEL . 9 3172 0y o D.B. 4019, PG. 568 I, _ 1 \ ' ,'° w3a4.o., y \ -. ZONING :RS4 / ' �'� . 81 I z3os,g / ///JJ��� , ,, 2305.E ��� _. _ _ .. PERMANENT STREAM IMPACT S1: 156 SQFT OR 0.0036 AC Q CULVERT -ACCESS ROAD \ - '� \ ��Q, '� -- � h" //l: I +�, 4% I 'av pow, . _� �,�_ I 3/ , r ��..v-- '- — �� ��, �� .I / � _ 1 _ ,,_ In l �j i I / / /� " ``\` E7/,`/ `r�r�� �� ICON ' ' �� / �� "—mod :-Q / l f I ® / \\ ." -` .'1 9750 18-6290 l� / Y ® T BARNHARD I v I" Emig' �J x -"" 01 `\�� ``ttI 4699, PG. 338 I I, %i 1•'4. �_ B. CI 2297.0' II� EGAN BEEBE 1 I I / \ 2296.0' 2296i1L111 23 12. I / �� 3 /IIIi'/¼2/ � I /y+3•� \ 1 I I I ' s A%� �► , I 1 j 1 7► � 1 i 1 2 / ,/� i I ' • i' .1 , I / ,� / , I I /v , i i/ 11 I I 6�ram \ _ --b--/ ► ij 1."--~y\ r i� .cam 1 LOT 1 % \ O ` 226os' �1 o 1 0 y \ 1�_ I �1 ' , ,'r �- 0 • i ler . ..." /.,k //L . . / /�,_�1' .l' 11181 " PROPOSED ' LOT E�-. /� � 11 i %/=�_, , ,II, a - i -0-1 �I ,•3.':,: -.� °� �—+ . „•ems--- __ __ � -- 1186290 ,_�� ®®■� 00____ �t��l�'1�.A -'-, ,v a ,.■ ° n' PUBLIC WATER CONNECTION �! 1 i \ \ I 1 SHELLEY \ .. _ft, `M \� SHELLEY �: y �w����Jo Vy i_�g�.WIN 7,PG.441 �� Ap1 pia �J�� ��l�L ��J/>"ST\I�\�j�j _' I 3: RS4 i �• NIIIN A4111I ) .. i]�YI \ 1 \ 1 1 I I ll\1A 111j 11 1 1 \. 1 ��� . 2298.5' 2U .; • —� 1) . - 1 1 1 -ae.- / B. e:_ : 1 = 1gL eas 33330 \,a715 I.� =NI .%, =a, ' e TEMPORARY STREAM IMPACT 1 1 __�• �� \`198,% / w� 1 \ - :. 6 ., __ _—.,. ;-i_ - \" ' N:::::_,....._„...?„,,,,,., S2: 73 SQFT OR 0.0017 AC 20 LF) cam- 1}`- i_ - -- s ---- ``y IMENI' PUBLIC SEWER CONNECTION LLY f , PIN: 9750- :-:•.. '---_ ���\11 :... --_. ,—,, NATESI ASHEVILLETWO �c-p,E'T PROPCOLLC .. �Fo CROSSING UNDER STREAM 231, Pam. __._ NING: RS4 I I 1 ��tNIN W 1 1 B. 5113, PG. 806 "'� G / I m ING:NOTZONE / Tl k \ / LT CARE H / I I \ --1 ' r /i� PROPOSED PUBLIC 1 -' I F' _ _" ___ / qf PIN:9750-2 L. I I \` "./_//'j1 7� / ///�/�/ice I �� ASHLEY LEE //•./ SEWER CONNECTION 1 ��/ ///1L_I //��//// \ // 1 DR,51ON PI3 Rn6 N PRELIMINARY, NOT FOR CONSTRUCTION 0 100� 200' 300' , , _ — W E , SCALE: 1 "=100' S /��V� 11: 113100KS ENGINEERING ASSOCIATES AMARX BEAVERDAM Figure 6.1 - SITE PLAN 0 40' 80' 120' SCALE: ■�� 1"=40' TEMPORARY STREAM IMPACT S2: 73 SQFT OR 0.0017 AC (20 LF) PUBLIC SEWER CONNECTION CROSSING UNDER STREAM ROAD CROSSING EXISTING CULVERT: 31 LF PROPOSED CULVERT: 56 LF PERMANENT STREAM IMPACT S1: 156 SQFT OR 0.0036 AC (28 LF) CULVERT - ACCESS ROAD FILL PIPE WITH STREAM BED MATERIAL TO EXISTING STREAM BED ELEVATION -12„ NOT TO SCALE Summary of Impacts: Permanent Stream Impact S1: 0.0036 Ac / 28 LF Temporary Stream Impact S2: 0.0017 Ac / 20 LF PRELIMINARY, NOT FOR CONSTRUCTION ..,..,,.41.0,,,, BROOKS ENGINEERING ASSOCIATES AMARX BEAVERDAM Figure 6.2 - STREAM IMPACTS approved dewatering device flow sediment dike pumps should discharge onto a stable velocity dissipater made of rip rap or sandbags discharge hoses dewatering pump A f intake hose clean water dike work area length not to exceed that which can be completed in one day STREAM DE -WATERING DETAIL • er • stream r- diversion pumps I P A -- intake hose flow sump -hole yr pool (12" to 18" • deep) 2' dia.) NO WORK SHALL BE PERFORMED DURING ELEVATED STREAM BASE FLOWS PRELIMINARY, NOT FOR CONSTRUCTION BROOKS ENGINEERING ASSOCIATES AMARX BEAVERDAM Figure 6.3 L- PROPOSED PUMP AROUND SYSTEM i 12" MIN 2" X 2" X 36" WOODEN STAKES PLACED 5' O.C. INSTALL 601b OF SAND BAGS ON TOP OF OUTLET SECTION Nrs 2" X 2" X 36" WOODEN STAKES PLACED 5' O.C. PLAN NHS FILTREXX TRENCH WATER DE -WATERING MAXIMUM DEPTH OF CONTAMINATED WATER IS 50% OF CONCRETE WASHOUT HEIGHT 18" DIAMETER FILTREXX®SOXXTN (ALSO AVAILABLE IN 8", 12" AND 24" DIAMETERS) PUMP CONTAMINATED WATER INTO WASHOUT 18" DIAMETER FILTREXX®SOXXIN NOTES: 1. INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE 2. _ _ _ WASHOUT MAY BE STACKED IN A PYRAMIDAL ( CONFIGURATION FOR ADDED HEIGHT AND STABILITY 3. WASHOUT MAY BE DIRECT SEEDED AT THE TIME OF INSTALLATION PRELIMINARY, NOT FOR CONSTRUCTION CONSTRUCTION SEQUENCE: ALL WORK TO BE PERFORMED IN THE DRY USING PUMP AROUND SYSTEM SHOWN ALL WORK MUST BE PERFORMED ONLY AFTER 401/404 PERMIT HAS BEEN OBTAINED AND IN ACCORDANCE OF ALL CONDITIONS. 1. INSTALL FILTREX FILTER RING 2. INSTALL PUMP AROUND AND DEWATERING PUMP, DO NOT TURN ON 3. INSTALL ALL REQUIRED PUMPING PIPING 4. INSTALL UPSTREAM AND DOWNSTREAM DIKES AND BEGIN DEWATERING 5. ONCE TRENCH IS DRY, REMOVE EXISTING CULVERT (IF PRESENT) AND INSTALL NEW ONE 6. RE -STABILIZE BANK IF NECESSARY. USE BIO-DEGRADABLE EXCELSOIR CURLEX III 100% SEED FREE ASPEN FIBERS. 7. REMOVE ANY COLLECTED SEDIMENT IN TRENCH OR FILTREXX FILTER RING 8. REMOVING PUMPS AND PIPING EQUIPMENT 9. REMOVE DIKES 10. APPLY WETLAND SEED MIX TO ANY DISTURBED AREAS BROOKS BASIN DETAIL AMARX BEAVERDAM ENGINEERING ASSOCIATES Figure 6.4 - PROPOSED PUMP AROUND SYSTEM NOTE: ALL STREAMBANK RESTORATION AND STABILIZATION SHALL RESULT IN A FINISH GRADE TO ORIGINAL CONTOURS, UNLESS SPECIFIED OR DIRECTED OTHERWISE BY THE ENGINEER IN WRITING INSTALL ANCHORS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS PLACE EXCELSIOR ABOVE RIP -RAP EXTEND TWO FEET BEYOND TOP OF BANK TOE IN 12 INCHES EXIST. GRADE 12" PLACE CLASS I RIP -RAP TO E VERTICAL DISTANCE ABO VE STREAMBED AS SPECIFIED THE DRAWINGS BACKFILL STREAMBED WITH NATIVE MATERIALS 18"MIN. FILTER FABRIC 12" OVERLAP 6" MINIMUM CONCRETE ENCASEMENT AS SPECIFIED STREAMBANK RESTORATION DETAIL N.T.S. Figure 6.5 STANDARD DETAIL Metropolitan Sewerage District of Buncombe County, North Carolina STREAMBANK PROTECTION III DATE APPROVED: MARCH 2017 1.18 - 03