June 29,2021
Davidson County
NCDWR Project No.20201815
Bridge 63 on SR 1472
WBS No. 17.BP.9.R.57
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Ms.Amy Euliss
NCDOT Division 9
375 Silas Creek Parkway
Winston Salem,NC 27127
Dear Ms.Euliss:
You have our approval,in accordance with the conditions listed below,for the following impacts related to
replacing Bridge 63 with a new bridge over Reedy Creek on SR 1472(Welcome-Arcadia Road)in Davidson
County.
Stream Impacts in the Yadkin PeeDee River Basin
Permanent Fill in Temporary Fill in in Stream
Perennial Stream Perennial Stream Total Impacts
Site (linear ft) (linear ft) Stream Requiring
Impact Mitigation
Bank Stabilization Utilities (linear ft) (linear ft)
3 89 - 89 -
4 - 3 3 -
Totals 89 3 92 -
Total Stream Impacts: 92 linear feet
Wetland Impacts in the Yadkin PeeDee River Basin(Riverine).
Hand Mechanized Wetland Impacts
Site Fill Excavation Clearing Clearing Requiring
(ac) (ac) (ac) (ac) Mitigation
(ac)
1 1 <0.01 0.0 0.0 <0.01 1 -
1 2 1 <0.01 - I - <0.01
Totals <0.01 I 0.0 I 0.0 I <0.01 1 -
Total Wetland Impacts for Project: <0.01 acres
The project shall be constructed in accordance with your application dated received May 28,2021,and subsequent
information received on June 24,2021. After reviewing your application,we have decided that these impacts are
covered by General Water Quality Certification Number 4135. This certification corresponds to the Corps Regional
D_E North
512North CaroSalisburylina DepartmeStreetnt of 17MavironmentailService CeE Quanlityter Raleigh j Division of WaterNorthCaro Resources
, 699-1617
NORTH CAROLINA
Department of E.Aronmeml0*ft 919.707.9000
DocuSign Envelope ID:35990E44-3C83-4838-8AC1-E7B0F0896066
General Permit 50. In addition,you should acquire any other federal, state or local permits before you proceed with
your project including(but not limited to)Sediment and Erosion Control,Non-Discharge and Water Supply
Watershed regulations. This approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application(unless modified below).
Should your project change,you must notify the NCDWR and submit a new application. If the property is sold,the
new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying
with all the conditions. If total wetland fills for this project(now or in the future)exceed one acre,or of total
impacts to perennial streams(now or in the future)exceed 300 linear feet,compensatory mitigation may be required
as described in 15A NCAC 2H.0506(h)(6)and(7). For this approval to remain valid,you must adhere to the
conditions listed in the attached certification(s)and any additional conditions listed below.
Condition(s)of Certification:
Project Specific Conditions
1. Bridge demolition and construction must be accomplished in strict compliance with the most recent version of
NCDOT's Best Management Practices for Construction and Maintenance Activities. [15A NCAC
02H.0507(d)(2)and 15A NCAC 02H.0506(b)(5)]
2. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species.
15A NCAC 02H.0506(b)(2)
3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge
or discharged to overbank areas and pre-treated through site-appropriate means(grassed swales,pre-formed
scour holes,vegetated buffers,etc.)before entering the stream. To meet the requirements of NCDOT's
NPDES permit NCS000250,please refer to the most recent version of the North Carolina Department of
Transportation Stormwater Best Management Practices Toolbox manual for approved measures. [15A NCAC
02H.0507(d)(2)and 15A NCAC 02H.0506(b)(5)]
General Conditions
1. During the construction of the project,no staging of equipment of any kind is permitted in waters of the U.S. or
protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
2. The dimension,pattern and profile of the stream above and below the crossing shall not be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC
02H.0506(b)(2)]
3. If concrete is used during construction,a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC
02B.0200]
4. Placement of culverts and other structures in open waters and streams shall be placed below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches,and 20 percent of the culvert
diameter for culverts having a diameter less than 48 inches,to allow low flow passage of water and aquatic life.
Design and placement of culverts and other structures including temporary erosion control measures shall not
be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks,adjacent to or
upstream and downstream of the above structures. The applicant is required to provide evidence that the
equilibrium is being maintained if requested in writing by NCDWR. If this condition is unable to be met due to
bedrock or other limiting features encountered during construction,please contact NCDWR for guidance on
how to proceed and to determine whether or not a permit modification will be required. [15A NCAC
02H.0506(b)(2)]
DENorth Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CAROUNA
Department of Environmentel ou.ury 919,707.9000
DocuSign Envelope ID:35990E44-3C83-4838-8AC1-E7B0F0896066
5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage.
[15A NCAC 02H.0506(b)(2)]
6. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506(b)(2)and(c)(2)]
7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags,rock
berms,cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A
NCAC 02H.0506(b)(3)and(c)(3)]
8. Heavy equipment shall be operated from the banks rather than in the stream channel to minimize sedimentation
and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)]
9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. [15A NCAC 02H.0506(b)(3)]
11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited. [15A NCAC 02H.0506(b)(3)]
12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any
other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are
not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being
violated,or that further conditions are necessary to assure compliance,the NCDWR may reevaluate and modify this
certification. [15ANCAC 02B.0200]
13. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization, including all non-commercial borrow and waste sites associated with the project, shall be clearly
marked by highly visible fencing or flagging prior to any land disturbing activities. Impacts to areas within the
fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and.0502]
14. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise
authorized by this certification. [15A NCAC 02H.0506(b)(2)]
15. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition,the
Water Quality Certification and all subsequent modifications,if any,shall be maintained with the Division Engineer
and the on-site project manager. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506(b)(2)and(c)(2)]
16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations,or ordinances that may be imposed by other government agencies(i.e. local, state,and federal)having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements,etc.
17. Upon completion of the project(including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer(or appointee) shall complete and return the enclosed "Certification of Completion Form" to notify the
NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(f)]
18. There shall be no excavation from, or waste disposal into,jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites,or access roads to waste or borrow sites,be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities. [15A NCAC 02H.0506(b)(3)and(c)(3)]
North Carolina Department of Environmental Quality i Division of Water Resources
D_E512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CAROUNA
Department of Environmentel ou.ury 919.707.9000
DocuSign Envelope ID:35990E44-3C83-4838-8AC1-E7B0F0896066
19. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices to protect surface waters
standards[15A NCAC 02H.0506(b)(3)and(c)(3]):
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design,installation,operation,and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
20. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by
this Certification. [15A NCAC 02H.0506(b)(3)and(c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty(60)days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm,except
for official state holidays. The original and one(1)copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five(5)business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh,NC 27699-6714
Telephone: (919)431-3000,Facsimile: (919)431-3100
A copy of the petition must also be served on DEQ as follows:
Mr.Bill F.Lane,General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions,please contact Dave Wanucha at(336)403-5655 or dave.wanucha@ncdenr.gov.
c—DocuSigned by:
0,-4441 c i VIA,
'-9C9886312DCD474...
S.Daniel Smith,Director
Division of Water Resources
DEj North Carolina Department of Environmental Quality i Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CARO�1NA
Department of Environmentel ou.ury 919,707.9000
DocuSign Envelope ID:35990E44-3C83-4838-8AC1-E7B0F0896066
Electronic copy only distribution:
Andrew Williams,US Army Corps of Engineers,Raleigh Field Office
Janet Mizzi,US Fish and Wildlife Service
Marla Chambers,NC Wildlife Resources Commission
File Copy
jNsio2rNt
h CnaDepartment of ironment Quality 1 ResourcesNORTH CAROUNADorth Salisburyaroli Street 1617Env Mail Serviceal Center RaleighDivision,NorthofWater Carolina 27699-1617
Deparhnert of Environmentel ou.ury 919.707.9000
DocuSign Envelope ID:35990E44-3C83-4838-8AC1-E7B0F0896066
ofi,,,STATE 4-
,1,11x,-q-7 7,''.
Rtjy
ROY COOPER i, jM o,
Governor
JOHN NICHOLSON ,` * an.. * �_=
Interim Secretary 44 `^
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
NCDWR Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and
any subsequent modifications,the applicant is required to return this certificate to the 401 Transportation Permitting
Unit,North Carolina Division of Water Resources, 1617 Mail Service Center,Raleigh,NC,27699-1617. This form
may be returned to NCDWR by the applicant,the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Agent's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, ,as a duly registered Professional Engineer in the State of North
Carolina,having been authorized to observe(periodically,weekly,full time)the construction of the project for the
Permittee hereby state that,to the best of my abilities,due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials.
Signature Registration No.
Date
}�
D �- North ollnm of oml Quality 1 Division of rc
v�J 512 NorthCar SalisburyaDepart Streetent 1617Envir Mail n Serviceenta Center Raleigsih,NarthWater CarolinaResou 27699es 1617
NORTH CAROL3NA
o.wtneM of enmmnmonui quai� - 919.707.9000