Loading...
HomeMy WebLinkAboutNCC210941_Modification Review_20210701Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/1/2021 11:55:11 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 7/1/2021 3:17:05 PM (Construction COC ADD TO FILE Review- NCC210941) The task was assigned to Georgoulias, Bethany A. The due date is: July 6, 2021 5:00 PM 7/1/2021 11:55 AM Y . Ta4M1 w, NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC210941 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name PNG Line 466 Pipeline Address Highway 11, Grainger Station Rd., and Faulkner Rd., Kinston, NC County Lenoir Latitude 35.3161 Longitude -77.4936 Permittee Listed Piedmont Natural Gas Company, Inc. Legally Responsible Dave Vena Individual NC Reference No. NCG01-2021-0941 E&SC Plan ID LENOI-2021-012 Original NOI 44542 Tracking No.* Date COC Issued* 02/17/2021 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional Ivbre information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers. Explanation Additional LOD You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised IRSCApproval, (lose -Out Doc, etc.) Documentation Lenoi-2021-012 PNG Line 466 Pipeline - 07012021 831.7KB (REV).pdf Wst be FDFformat North Carolina General Statute 143-215.6113 (i) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). � I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Dave Vena Title * Project Manager Organization* Piedmont Natural Gas Company, Inc. Date * 07/01 /2021 Email Address* dave.vena@duke-energy.com En -ail for confirmation Telephone Number* 704-731-4496 Contact number if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email camcmullan@burnsmcd.com (Optional) Additional email for confirmation Original Permittee dave.vena@duke-energy.com Email Original Site Contact michael.parham@duke-energy.com Email Review Date 07/01/2021 Rescinded Since Submitted? Request Date 20210701 Formatted Review Date 20210701 Formatted