Loading...
HomeMy WebLinkAbout20211057 Ver 1_ePCN Application_20210630 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20211057 1 Is a payment required for this project?* ✓ No payment required 6' Fee received Reviewing Office* ✓ Fee needed-send electronic notification Wilmington Regional Office-(910)796-7215 Select Project Reviewer* Robert Patterson:eads\rdpatterson Information for Initial Review la.Name of project: Bridge 100 on SR 1342(Makatoka Rd.)over Muddy Branch,B-4439 1a.Who is the Primary Contact?* Mason Herndon 1b.Primary Contact Email:* 1c.Primary Contact Phone:* tmherndon@ncdot.gov (910)341-2036 Date Submitted 6/30/2021 Nearest Body of Water Muddy Branch Basin Lumber Water Classification C;Sw Site Coordinates Latitude: Longitude: 34.092168 -78.382995 A. Processing Information L) County(or Counties)where the project is located: Brunswick Is this a NCDMS Project ✓ Yes 6 No Is this project a public transportation project?* ✓ Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: B-4439 WBS#(?) 48366.1.2 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version Pre-fling Meeting or Request Date 10/25/2018 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach docurrent B-4439 BRUNSWICK 100_ProjectScopingReport.pdf 184.23KB Pie type mast be FCF 1a.Type(s)of approval sought from the Corps: I7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? r Nationwide Permit(NWP) fJ Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? G Yes r No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): ld.Type(s)of approval sought from the DWR: I7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes t No For the record only for Corps Permit: r Yes r No If.Is this an after-the-fact permit application?* ✓ Yes (' No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? 6 Yes r No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo 1h.Is the project located in any of NC's twenty coastal counties? 6 Yes r No 1i.Is the project located within a NC DCM Area of Environmental Concern(AEC)? ✓ Yes ( No r Unknown 1j.Is the project located in a designated trout watershed? C Yes (- No B. Applicant Information ( ) Id.Who is applying for the permit? 17 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* C Yes a No 2. Owner Information 2a.Name(s)on recorded deed: NC Department of Transportation 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 5501 Barbados Blvd. Address Line 2 Qly State/Bovine/Region Castle Hayne NC Postal/Zip Code Country 28429 New Hanover 2e.Telephone Number: 2f.Fax Number: (910)341-2000 2g.Email Address:* ckimes@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Exu m 2. Project Identification 2a.Property Identification Number: 2b.Property size: N/A N/A 2c.Project Address Street Address N/A Address Line 2 Gly State/Bovine/Region N/A N/A Postal/Zip Code Country N/A N/A 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Muddy Branch 3b.Water Resources Classification of nearest receiving water:* C;Sw 3c. What river basin(s)is your project located in?* Lumber 3d.Please provide the 12-digit HUC in which the project is located. 030402060403 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Bridge 100 is 91 ft.long with a deck width of 24.2 ft.The surrounding area is forested with Juniper Creek Game Lands and Nature Preserve on both sides of the bridge and approaches. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes f No r Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 3.49 4g.List the total estimated linear feet of all existing streams on the property: 410 4h.Explain the purpose of the proposed project:* Remove existing bridge structure that was constructed in 1966 and replace it with a 100 ft.long by 33 ft.wide bridge.The existing structure has a sufficiency rating of 27.61 out of a possible 100 for a new structure.The bridge has timber elements that are 53 years old. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The project is to replace the existing 91 ft.long by 24.2 ft.wide bridge with a 100 ft.long by 33 ft.wide bridge.The approach roadway improvements will extend 345 ft.on the south end of the bridge and 300 ft.on the north end of the bridge.No utility relocations are required for this project and traffic will be detoured offsite.The project will be constructed with standard roadway construction equipment which includes excavators,backhoes and cranes. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes C No C Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* a Preliminary C Approved C Not Verified C Unknown C N/A Corps AID Number: SAW-2016-02149 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Robert Turnbull Agency/Consultant Company: Terracon Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Site field verification 10/19/2016,Verification signed 10/26/2016. 6. Future Project Plans 6a.Is this a phased project?* C Yes 6. No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary la.Where are the impacts associated with your project?(check all that apply): 17 Wetlands r Streams-tributaries r Buffers r Open Waters r Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 126.Impact type*''' 112c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* 1 roadway fill P Riverine Swamp Forest WA Yes Both 0.149 (acres) 1 excavation P Riverine Swamp Forest WA No Both 0.001 (acres) 1 hand clearing T Riverine Swamp Forest WA Yes Both 0.004 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.004 0.150 2g.Total Wetland Impact 0.154 2i.Comments: Excavation is a beneficial impact for floodplain tie-in to natural ground elevation where existing approach fill is being removed. E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The bridge will be replaced on the existing alignment and an offsite detour will be used vehicular traffic.Rock plated 2:1 slopes were incorporated in the design on the north side to minimize impacts.2;1 slopes were evaluated for the south sides but the impacts savings were minimal in comparison to the cost. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The bridge will be constructed using top down construction methods.Strict implementation of S&EC BMP's will be utilized to protect waters of the US in accordance with NCDOT's NPDES Permit No.00250 and NCG01. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ( Yes r No 2c.If yes,mitigation is required by(check all that apply): r"DWR fJ Corps 2d.If yes,which mitigation option(s)will be used for this project? n Mitigation bank IJ Payment to in-lieu fee r' Permittee Responsible program Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. 6 Yes r No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: N/A 4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested: (square feet) (acres) N/A 0.149 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) N/A N/A 4h.Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes (• No If no,explain why: Buffer rules do not apply to the Lumber River Basin. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* 6 Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* 6 Yes CNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ( Yes r No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes r No Comments:* A Type 1A CE was completed and signed on 6/17/2019. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15ANCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes (7 No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes r No 3b.If you answered"no,"provide a short narrative description. Replacement of the existing bridge will neither influence nearby land use nor stimulate growth. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes f No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ✓ Yes f• No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ yes (7 No 5d.Is another Federal agency involved?* ✓ Yes r No r Unknown What Federal Agency is involved? FHWA 5e.Is this a DOT project located within Division's 1-8? 6 Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Field surveys,USFWS IPaC,NCNHP database 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes f• No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NC GIS data 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes f No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* Project was reviewed and cleared by NCDOT HEU in coordination with SHPO. 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* 6 Yes r No 8b.If yes,explain how project meets FEMA requirements: Hydraulics Unit coordination with FEMA 8c.What source(s)did you use to make the floodplain determination?* FEMA FIS/Field Observations Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. pick the upload button or drag and drop files here to attach docurrent B-4439_HYD_Permit_20210628.pdf 4.15MB Fle crust be FOF or ME Comments Stormwater Management Plan,Permit Drawings and Impact Summary are attached Signature ®By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Mason Herndon Signature 2Va w 70 ree�< Date 6/30/2021