Loading...
HomeMy WebLinkAboutNCC204111_NOT Closeout Documents_20210628North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Forsyth Project: Shattalon Station Drainage Person financially responsible: Duke Energy Carolinas, LLC - Michael D Robinson, Manager, Transmission Engineering Address: 526 South Church Street, PO Box 1006, Charlotte, NC 1. Project Location: 4615 Murray Road, Winston-Salem Pictures: Yes - Digital River basin: Yadkin-PeeDee Project #: FORSY-2021-006 2. Weather and soil conditions: Sunny, Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Ryan Swaim Inspection report: Sent Report 9. Corrective action needed: Title: Field Superintendent Date given/sent: April 16, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Tyler Pearson Others present: Date of inspection: April 14, 2021 Time arriving on site: 10:15 AM Time leaving site: 11:00 AM cc: