HomeMy WebLinkAboutNCC200283_NOT Closeout Documents_20210628North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Cumberland Project: Fayetteville Honeycutt Road Dollar River basin: Cape Fear
Person financially responsible: Par 5 Development Group, LLC — Project N: CUNME-2020-085
R. Lee Pittman, Member Manager COC• NCC200283
Address: 2075 Juniper Lake Rd, West End, NC 27376
1. Project Location: Honeycutt Road, Fayetteville
Pictures: No
2. Weather and soil conditions: mostly sunny, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Matt Winebarger Title: Env. Compliance Manager,
Inspection report: Sent Report Date given/sent: May 26, 2021
9. Corrective action needed:
10. Comments:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or
self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage
under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the
permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded
as part of completing the NOT process.
Reported by: Lori Britt Others present:
Date of inspection: May 25, 2021 Time arriving on site: 1:55 PM Time leaving site: 2:10 PM
cc: Matt Winebarger (via email)