Loading...
HomeMy WebLinkAboutNCG030651_2020 DMR_20210701Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 2110/20 CERTIFICATE OF COVERAGE No. NCG03 0 6 5 1 FACILITY NAME Aallied Die Casting �+ COUNTY Rutherford PERSON COLLECTING SAMPLES Jeff Lindsey LABORATORY Pace National Lab Cert. # ENV375 Comments an sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2020 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or El Monthly' January (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply [:]SA Mother Freshwater Class C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 —> n No discharge this ueriod?z Outfall No. Date Sample Collected' (rno/dd/yr) 24-11our rainfall amount, Inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks _ - 100 mg/L or 50 mg/0 6.0 —9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C053D 00400 01119 01051 01094 00552 78141 001 1-24-20 1.72 2.78 7.72 <0.01 <0.005 0.0946 <5.81 NA 002 1-24-20 1.72 11.4 7.56 0.0128 <0.005 0.0545 <5.88 NA 003 1-24-20 1.72 14.6 7.36 0.0172 <0.005 0.148 <5.68 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22, and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics MO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Not Applicable Name (Print name) NA Title (Print title) Date Signature ect Note: Results muse be reported in numerical format. Po not re ort Below Detection Limit, BDL, them mustbe reported in the format, " XX <PQ LNon-det where X iNtDhe r other si is r of the detection format. When results are below the applicable limits, mg(� limit, reporting limit, etc. in mg/L. you must implement Tier I, Tier2, or Tier 3 responses. See Genera! Permit text. Note: if you report a sample value in excess of the benchmark, Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per m°F—I No charge this period Date Sample Cailectedr Outfall No. (mofdd/yr) Benchmarks Parameter Code Footnotes from Part A also apply to Part B 24-hour rainfall amount, New Motor Oil or Non -Polar O&G/ Total Total Suspended Inches3 Hydraulic Oil Usage petroleum Hydrocarbons Solids 15 mg/L 100 mg/L or 50 mg/L° NCOIL 00552 CO530 46529 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier2, or Tier 3 responses. See GSwU 2 5ral Permit rlastrevised 11/1/2015 Permit Date: 11/1/2018-05/31/2021 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART Il SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES [F]NO[] IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES 0 NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal copy of this DMR, including all "No Dischor e" r orts within 30 days of receipt of the lab results or at end of monitorina period in th case of "No Discharge" reports_} to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties forsubmitting false information, including the possibility offines and imprisonment for knowing violations." rye �- to Signature Permits Date 1 Permit Date: 11/1/2018-05/M/2021 SWU-245, last revised 11/1/2018 Page 3 of 3