Loading...
HomeMy WebLinkAbout20210966 Ver 1_Pre-Filing Meeting Information_20210628DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low and include location information.* 20210966 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre-Filing Me eting Reque st submitte d 5/24/2021 Jonathan Hefner jhefner@wetherilleng.com Jones Creek Greenway (TIP C-5181) Town of Carrboro Orange City Carrboro State / Province / Region NC Postal / Zip Code 27510 Country United States Street Address 301 W. Main St, Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date The proposed project involves the construction of a 10ft. wide multi- use path in the Orange County Town of Carrboro. The approximately 800ft. trail will begin at the current terminus of Lake Hogan Farms Rd. on the east side of the road and will run north connecting to the existing trail constructed by Orange County. The trail will have an approximately 70 ft. long bridge over Buckhorn Branch. The proposed project is included in the 2018-2027 North Carolina State Transportation Improvement Program (STIP). Jones Creek Greenway Buffer and Stream Permit Drawings 10-15-30.pdf 2.26MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 5/24/2021