HomeMy WebLinkAbout19_Internal Post-Construction Plan Review ChecklistIZck ►t✓�
Stormwater Plan Submittal Check List
N/A
SD
DID
CD
Plans
General
North Arrow, Scale, Legend, Construction Limits
Property Lines
Horizontal Datum (NAD 83 State Plane Survey Feet)
Jordan Lake Buffer Zones
Town of Chapel Hill RCD Buffer
Floodplains
Streams and Wetlands
Significant Natural Heritage Areas
Existing Plans
Original Survey with Date and Surveyor Information
Existing Contours; Vertical Datum Used (NAVD 88)
Existing storm structures to remain with location size material and invert
elevations
Existing storm conduit, swales, or channels to remain with inverts,
dimensions, length, and material
Existing BMPs with their location, size, surface area, and type
Trees with type and diameter at breast height
Existing Topographic Info
Demolition Plans
Any Storm Drain or BMP being removed or abandoned
Impervious Area to be Removed
Proposed Site Plan
Existing Contours
Proposed Contours
Existing storm drainage infrastructure to remain
Proposed storm structure location
Size, material, and invert elevations
Proposed storm conduit, swales, or channels
Inverts, Dimensions, length, and materials
Proposed storm conduit and channel schedule
Proposed BMPs location and type
Size, Surface Area
Maintenance Access
Proposed other utilities and existing utilizes to remain
Proposed land cover shown VERY clearly on plans
Proposed Trees and Mature Root Zone
Proposed Project Phasing
Walls and other grade change locations
Storm Drain Profile Sheets with HGL (Can be shown in report instead)
Stormwater Detail Sheets
Storm Drainage System Details
BMP Details in plan, cross-section, and profile views
BMP invert, weir, and orifice elevations
Version 1 Appendix A
1of3 July 18,2016
Stormwater Plan Submittal Check List I
BMP Elevations Consistent through all views
BMP surface area at key elevations
Emergency Spillways
Energy Dissipaters
Any Landscape or Architectural drawings related to Storm (PDF Only)
Showing roof, landscape and sock drain connections to storm
General Plumbing showing roof drainage, elevator sumps, area and floor
drains
Plan view and details of Green Roofs
Stormwater Management Report and Drainage Calculations
Short Narrative
Identify applicable stormwater management requirements and address how
they will be met
Identify the types of BMPs proposed
Describe the condition of any existing storm drainage infrastructure to remain
Describe any proposed changes to the storm drainage system
Identify any potential conflicts with existing utilities and indicate an additional
site exploration work needed
Address the ways in which the Jordan Lake Rules are satisfied
For Underground Storage :
What happens when storage leaks?
How can leaks be found and repaired?
What is acceptable leakage rate?
Summary Tables
Table Summarizing the drainage areas including label and acreage
Summary of each BMP, and its drainage area
Water Quality Table (Provided Treatment vs. Required)
Pre Post Peak Discharge Table
Pre Post Volume Table
Drainage Area Maps (Pre and Post)
Drainage area(s) shall cover the entirety of the project limits, and any offsite
areas draining through the project site
A drainage area shall be defined for each point where concentrated flow exits
the site
A drainage area shall be defined for each pipe, channel, or other conveyance
mechanism within the site (Post only)
All design points shall be clearly shown and labeled
All drainage areas shall be clearly labeled
Existing and Proposed Land Cover Tables
Land cover in square feet for each drainage area
Runoff Coefficients used for each drainage area
Jordan Lake Accounting Tool worksheets
Calculations for BMP Sizing
In -Situ Infiltration Test Results (If Infiltration type)
Geotechnical Investigation which shall include water table and seasonal
high water table (If Applicable)
Version 1 Appendix A
2 of 3 July 18, 2016
Stormwater Plan Submittal Check List
Hydrology and Hydraulics Calculations (Input and Output Print Outs)
Curve Number Calculations
Time of Concentration Calculations
Water Quality Volume Calculations
2-year volume reduction calculations inside Chapel Hill
Peak discharge calculations
Existing conditions modeling includes de facto detention
For Detention Ponds and Wetlands:
X-Section through embankment and compaction requirements
Anti -flotation Calculations
Stage -Storage Discharge Curves
Summary of outlets and elevations
Peak Discharges through 1% Chance Storm
Peak Water Surface Elevations through 1% Chance Storm
Extents of 1% Chance Storm overland Flow
Infiltration Calculations for Infiltration BMP's
For Cisterns:
Demand projection calculations
Input/Output from the NCSU rainwater harvester model
Storm Drainage Calculations
Calculations for each proposed and existing drainage pipe, inlet, and channel.
Calculations follow performance criteria in this document
Video of Existing Storm Drainage to Remain
Specifications
Soil Testing for Bioretention and Soil Specifications
Permeable Pavement Specifications
Green Roof Media Specifications
BMP Operation and Maintenance Plan
Use NCDENR BMP Operations and Maintenance forms as a starting point
Delete agreement portion of form
Proprietary product specific operation and maintenance plans
Mechanical and Electrical components preventative maintenance
requirements
Version 1 Appendix A