HomeMy WebLinkAbout18_Post-Construction SCM Approval Letterram' THE UNIVERSITY
o'/* NORTH CAROLINA
j of CHAPEL HILL
ENERGY SERVICES
DEPARTMENT
9_t 11RAN(Al STKFFT
CAMPUS BOX 1855
CHAPEL HILL. N(* 27599-1855
Lew Kellogg
Director
[MONTH, DATE, YEAR]
CONSTRUCTION CLOSE OUT
CERTIFICATE OF STORMWATER CONTROL MEASURE (SCM)
AND DRAINAGE COMPLIANCE
[Project Name]
[UNC Project #]
[UNC Design Manager]
[UNC Construction Manager]
[Lead Designer]
[Civil Designer]
Mailing Address
City, State, Zip
Dear [Civil Sub]:
[Prime Contractor]
Mailing Address
City, State, Zip
P 919.966.4100
1- 919.843.7328
Lew.kellogg@energy.une.edu
On [Date], The University of North Carolina at Chapel Hill Energy Services Stormwater Group
received the required documentation for the Stormwater Control Measure (SCM) and/or
drainage devices used onsite. UNC Stormwater Staff also visited the site and inspected the
SCM(s) and drainage system for completeness with the approved plan. As such, the following
items have been provided to the Energy Services Department.
• Reproducible record drawings of the SCM's and Drainage Infrastructure;
• Operations and Maintenance Manual for the SCM(s);
• As -built Calculations for SCM's
• Sealed certification by a licensed North Carolina Professional stating that the structure is
complete and complies fully with approved plans and specifications;
Please feel free to contact Energy Services Department and speak with our stormwater staff,
should you have questions regarding this matter.
Sincerely,
[UNC Stormwater Engineer]
CC: [UNC Design Manager, UNC Construction Manager, UNC Grounds, UNC EHS]