Loading...
HomeMy WebLinkAbout18_Post-Construction SCM Approval Letterram' THE UNIVERSITY o'/* NORTH CAROLINA j of CHAPEL HILL ENERGY SERVICES DEPARTMENT 9_t 11RAN(Al STKFFT CAMPUS BOX 1855 CHAPEL HILL. N(* 27599-1855 Lew Kellogg Director [MONTH, DATE, YEAR] CONSTRUCTION CLOSE OUT CERTIFICATE OF STORMWATER CONTROL MEASURE (SCM) AND DRAINAGE COMPLIANCE [Project Name] [UNC Project #] [UNC Design Manager] [UNC Construction Manager] [Lead Designer] [Civil Designer] Mailing Address City, State, Zip Dear [Civil Sub]: [Prime Contractor] Mailing Address City, State, Zip P 919.966.4100 1- 919.843.7328 Lew.kellogg@energy.une.edu On [Date], The University of North Carolina at Chapel Hill Energy Services Stormwater Group received the required documentation for the Stormwater Control Measure (SCM) and/or drainage devices used onsite. UNC Stormwater Staff also visited the site and inspected the SCM(s) and drainage system for completeness with the approved plan. As such, the following items have been provided to the Energy Services Department. • Reproducible record drawings of the SCM's and Drainage Infrastructure; • Operations and Maintenance Manual for the SCM(s); • As -built Calculations for SCM's • Sealed certification by a licensed North Carolina Professional stating that the structure is complete and complies fully with approved plans and specifications; Please feel free to contact Energy Services Department and speak with our stormwater staff, should you have questions regarding this matter. Sincerely, [UNC Stormwater Engineer] CC: [UNC Design Manager, UNC Construction Manager, UNC Grounds, UNC EHS]