Loading...
HomeMy WebLinkAbout20210905 Ver 1_Shoreline Stabilization_20210701Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: Tim Gaines - Prefile Approval.pdf 749.69KB Pre -fling Meeting or Request Date 5/5/2021 ID# 20210905 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * charlie@marineconstructionllc.com Rease provide an err -ail address for payment and requests for pure infornation here. Owner Information: Name: * Tim & Nancy Gaines Email: * Tgaines@gainesexpress.com Phone Number:* (828)302-2835 (xxx)xxx-xxxx Mailing Address:* Street Address 984 18th Ave Circle NW Address Line 2 City State / Frovince / Region Hickory NC Fbstal / Zip Code Country 28601 USA Is there an agent working on the project? * Agent/Consultant Information ................................................................................................................. Name: Company Affiliation:* Email: Phone Number:* Mailing Address:* F Yes r No Charlie Washburn Marine Construction LLC charlie@marineconstructionllc.com (828)495-3040 (XXX)XXX-XXXX Address 1173 Shiloh Church Road Address Line 2 City Hickory Fbstal / Zip Code 28601-7855 Asigned and dated copyof the Agent Authorization letter:* Tim Gaines - Agent Authorization.pdf 310.02KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Gaines - Hickory NC State / Province / Fbgion NC Country United States If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Upload Map: Tim Gaines -Directions and GIS.pdf 1.66MB Latitude:* 35.766654 Longitude:*-81.356518 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Tim Gaines - Summary & Drawings.pdf 2.36MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Tim Gaines - Property Pic.pdf 1.29MB 4. Location of the property (where work is to be conducted) Nearest Town:* Hickory County:* Catawba Lake/ river/ ocean adjacent to Hickory property: Subdivisions name or site address:* Le Pointe Subdivision Lot 10 hclude phasellot number Directions to site:* Printed directions included above Rease include road narres and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential, Developed. Residential, undeveloped, etc. 6. Property Size 1.20 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): We plan to place riprap along the shoreline to prevent further erosion. 8. How will the work be done? * r1 From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 996 perm, 0 temp square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 996 perm, 2490 construction corridor square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) Grassy yard and a few bushes. Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Charlie Washburn Signature: Initial Review Is this accepted into the review process?* Project Number:* 20210905 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO: 10 STREET ADDRESS: 9R4 1 Rth Ave Circle NW Hickory, NC Please print: Property Owner: Tim Gaines Property Owner: Nancy Gaines PLAN NO: PARCEL ID: 370417110887 The undersigned, registered property owners of the above noted property, do herebyauthorize Charlie Washburn (Contractor/Agent) , of Marine Construction LLC (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (if different than property above): same Telephone: 828-302-2835 We hereby certify the above information submitted in this application is true and accurate tothe best of our knowledge. �J Authorized Signature Date Autho ed Signature ©5-- // Date 1173 Shiloh Church Rd Hickory, NC 28601 al 1. Head southwest on Shiloh Church Rd toward Rosenbalm Ln 10 s (38? ft) h 2. Slight left to stay on Shiloh Church Rd 2 min (1.0 mi) Continue on NC-127 S to Hickory _..,... _ ...... _____ ._.... 6 min (3.8 mi) i 3. Turn right onto NC-127 S 19 Pass by Bojangles (on the right in 2.9 mi) 3.2 mi 41 4. Continue straight onto N Center St Pass by McDonald's (on the right in 0.2 mi) __...... 0.6 mi Continue on 20th Ave NW. Take 18th Ave Dr NW to 18th Ave Cir NW https://www.google.com/maps/dir/1173+Shiloh+Church+Rd,+Hickory,+NC+28601-7855,+USA/984+18th+Ave+Cir+NW,+Hickory,+NC+28601/@35,787... 1 /2 5/5/2021 1173 Shiloh Church Rd to 984 18th Ave Cir NW, Hickory, NC 28601 - Google Maps 4 min (1.3 mi) i 5. Turn right onto 20th Ave NW 0.5 mi 6. Turn right onto 2nd St NW 0.2 mi i 7. Turn left onto 20th Ave Dr NW 0.2 mi 8. Turn left onto 18th Ave Dr NW 0.4 mi 9. Continue onto 18th Ave Cir NW 407 ft 98418th Ave Cir NW Hickory, NC 2860*1 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. https://www.google.com/maps/dir/l 1 73+Shiloh+Church+Rd,+Hickory,+NC+28601-7855,+USA/984+18th+Ave+Cir+NW,+H ickory,+NC+28601 /@35.787... 2/2 Ccatawba counter Geospatial Real Estate Search t€vim, s.„... Information Services " 1 in=400ft w- E VS Parcel: 370417110887, 984 18TH AVE CIR NW HICKORY, 28601 Owners: GAINES NANCY C, Owner Address: 984 18TH AVENUE CIR NW Values - Building(s): $1,042,000, Land: $390,000, Total: $1,432,000 This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2021 Catawba County NC 05/05/2021 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Catawba Nearest Town: Hickory Lake/ river/ ocean adjacent to property: Hickory Property size (acres): 1.20 acres Subdivision name or site address (include phase/lot number): Le Pointe Subdivsion — Lot 10 Directions to site - please include road names and numbers, landmarks, etc.: Included in packet Latitude (in decimal degrees) 35.766654 Longitude (decimal degrees)-81.356518 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): We plan to place riprap along the shoreline to prevent further erosion. 7. Will work be conducted from land? IP/ From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 1=16 5o f{- Dbir 'e4. d 1' Iti f4P Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 414 S /Mlgn a h t I l fy Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): o o.. a JAM yArd and R iay/ [AvIS 11. Sign urn Owner/Agent's Signature* [15A NCAC 02H .0502(f)1 Date "Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full 2 ft. K ISo ft. .1461 clearing H necessary Plan View Lake pad/ awmat Watettevelt Existing Dock IMINI-I'S RISHIS d 1-4 be4oal ,VV4 0, 4 >ve- )V4&- r am IMI Irw IMI'IMI FORM: SSGP 02-2017 Page 3 of 4 r_ Side View FORM: SSGP 02-2017 Page 4 of 4 ID#* 20210905 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 5/5/2021 Contact Name * Charlie Washburn - Marine Construction LLC Contact Email Address* Project Name * Project Owner* Project County* Owner Address: Is this a transportation project?* Marineconstructionhickory@gmail.com Gaines - Hickory NC Tim & Nancy Gaines Catawba Street Address 984 18th Ave Cir NW Address Line 2 city Hickory Fbstal / Zip Code 28601 r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - 1- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Rovince / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* We plan to place riprap along the shoreline to prevent further erosion. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Sianature Submittal Date 5/5/2021