Loading...
HomeMy WebLinkAboutWQ0008383_Permit (Issuance)_19930923State of Nuirth Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director LDEF-1N R September 23, 1993 Mr. M.J. Noland, Director of Water and Sanitary Sewer Systems Fayetteville Public Works Commission P.O. Box 1089 Fayetteville, N.C. 28302' D E� 1 �► SEP 29 1993 ENV.. Dear Mr. Noland: Subject: Permit No. WQ0008383 Fayetteville Public Works Commission N. Reilly Road Sewer Extension Cumberland County In accordance with your application received August 25, 1993, we are forwarding herewith Permit No. WQ0008383 dated September 23, 1993, to Fayetteville Public Works Commission for the construction and operation of the subject wastewater collection extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. One set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Mr. John Seymour at 919/733-5083. Sincerely, A. Prestos Howard, Jr., P.E. cc: Cumberland County Health Department Fayetteville Regional Office Bennett Engineering P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper ps NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Fayetteville Public Works Commission Cumberland County FOR THE construction and operation of approximately 664 linear feet of 8 inch gravity sewer to serve N. Reilly Road and the discharge of 1,250 GPD of collected domestic wastewater into the Fayetteville Public Works Commission's existing sewerage system, pursuant to the application received August 25, 1993, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities must be properly maintained and operated at all times. 4. The sewage and wastewater collected by this system shall be treated in the Rockfish Wastewater Treatment Facility prior to being discharged into the receiving stream. 5. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 6. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 1 7. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting materials. Mail the Certification to the Water Quality Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. 9. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Environmental Management, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 11. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater collection facilities. 12. Noncompliance Notification: The Permittee shall report by telephone to the Fayetteville Regional Office, telephone number 919/486-1541 as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b . Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within 15 days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Permit issued this the 23rd day of September, 1993 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ir7c•CLUIL A. Presto oward, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission Permit Number WQ0008383 2 Permit No. WQ0008383 September 23, 1993 ENGINEER'S CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Project Name Location Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of this permit, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 3