Loading...
HomeMy WebLinkAbout20130548 Ver 1_401 Application_20130513COLE Design Group, Inc. TO: NC DENR -DWQ — WBSCP Unit 512 North Salisbury Street Raleigh, NC 27604 We Are Sending You: + ST. LOUIS ST. CHARLES DALLAS 10777 Sunset Office Dr. 1520 S. Rfth Street 6175 Main Street Suite 10 SWte307 Suite 367 St. Louis, MO 63127 St. Charles, MO 63303 Frisco, TX 75034 314.9849887 b 636.97 &7508 W 972.624.6000 M 314.984 0587 fax transmittal DATE: 05122/13 JOB #: 12 -0099 ATTENTION: Karen Higgins RE: New Hope Development — Lot 2 20130548 COPIES DATE NO. DESCRIPTION 3 05/22113 Pre - Construction Notification (PCN) Forms 3 05/22113 Agent Authorization Forms 3 05/22/13 Site Review Plans (Full- size) These Are Transmitted As Checked Below: ❑ Approval ® For Review and Comment Via: ❑ Courier ❑ Mail Remarks: ❑ For Your Use ❑ Other ❑ Pick Up ® Other Enclosed, please find our application for a Buffer Authorization for the New Hope Road Development. We are seeking only Buffer Rule approval for stormwater discharge through the Neuse River Buffer. Copy To: Damon Zvoch- BC Construction Group File CIVIL ENGINEERING 1 SURVEYING 1 PLANNING I LANDSCAPE ARCHITECTURE V�- Emily John, P.E., LEED AP BD +C® E� €IVE MAY 2 3 2013 o�ot wa Leo 0 o � 20 130548 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express Q Riparian Buffer Authorization; 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. ,'Is payment into a mitigation bank or in-lieu fee program proposed for) ;mitigation of impacts? If so, attach the acceptance letter from mitigation bank; or in -lieu fee program.' Q �Ye) [],!4]o t19. Is the project located in any of NC's twenty coastal counties. If yes, answer 1p) below.; ❑`Yes QNo ` , 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC) ?; ❑ Yes; ©;No� 2. 'Projec�,information)) I2a. Name of projed j New Hope Development - Lot 2 2b. County ,\ Wake County 2c. Nearest municipality / town Raleigh 2d. Subdivision named New Hope Development 2e. NCDOT only, T.I.P. or state project no: ,311 ,Owner Information, ,3a. Name(s) on Recorded Dee& New Hope Development Partners, LLC 3b. Deed Book and Page No ; Book 13031, Page 1725 '3c. Responsible Party (for LLC it applicable):; Lindsay Sewell 3d. Street address ;, 4904 Water Edge Drive MAV 13e. City, state, zip:) Raleigh, NC 27606 ,3f. Telephone no. :) 909 - 239 -4667 (3g. Fax no. n/a �3h. Email address.) lindsay @brookwoodcp.com Page 1 of 10 PCN Form — Version 1.4 January 2009 I4� Applicant Information (if different from owner) 4a. (Applicant is: Q Agee ❑ Other, *peck. (4b. Nams Jim Roth, PE (Civil Engineer) . Business name) (if applicable): COLE Design Group, Inc. (4d. Street address 10777 Sunset Office Dr 4e_City, state, zip St. Louis, MO 63127 [4f. Telephone no.: 314 -984 -9887 (4g. Fax no.� 314 -984 -0587 C4h. Email address jroth @colestl.com �5) �Agent/Consultant Information (if applicable) 5a. (Nams (5b. Business name ((if applicable): 5c. Street address L5d. City, state, zip 5e. Telephone n — t f � . _Fax no_ (5g. Email address: Page 2 of 10 B. Project Information and Prior Project History (1 ; Property [dentification 1a _Property identification no. (tax PIN or parcel ID):) 1723991957 1b. Site coordinates (in decimal degreesl��ude: 35.78099 ((ongitude: -78.564861 0 c. Property size) 9.43 [ores) 72.' , 'Surface Waters), 2a. Name of nearest body of water to proposed project Crabtree Creek I2b. Water Quality Classification of nearest receiving water:; Class C, Nutrient Sensitive Water (NSW) I2c. River basin: Neuse River Basin (Stream Index 27- 33 -(10)) 3. , Project Description `3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:, The site is currently undeveloped. The site generally drains from the eastern property line to the west and north. A portion of the site is in the Neuse Buffer, which is now covered with woody vegetation. The rest of the site is predominately covered with grass. The land use in the vicinity is industrial, however, the land to the south, west, and north is currently vacant. 3b. List the total estimated acreage of all existing wetlands on the property: '3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:; 1,350 3d. Explain the purpose of the proposed pro�ect:, 'Me purpose of the project is to construct a 100,155 s warehouse with associated utilities and parking. Stormwater controls will be constructed outside of the riparian buffer on site and riparian impacts are due to a stormwater management bypass channel from the storrnwater controls. 3e. Describe the overall project in detail, includingq the ttyype of equipment to be used:" The project consists of a 100,15nf warehouse, a portion oTwhictf�Ut be usedTortire distribution. barking lots are proposed along the south side of the building and at the northwest comer. 4' loading docks are proposed along the west side of the building. Retaining walls are required along the west side of the building and at the northeast comer. The budding is served by water and sewer along the east side. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the' Corps or State been requested or obtained for this property j project (including all prior phases) in the past?, [I Ye ❑;No Unknown; "Comments 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. 'If yes, who delineated the jurisdictional areas ?j Name (if known):, Agency /Consultant Company *;! Other:, 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation., 6. Project History, 5a. Have permits or certifications been requested or obtain�d for; this project (including all prior phases) in the past? ❑Yes Q,No) ❑Unknown ,5b. If yes, explain in detail according to "help file" instructions; 6. Future Project Plans) 6a. Is this a phased project?) ❑ Yes ❑X No 6b. (If yes, explain Pa e3of10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries Q Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W2 W3 W4 W5 W6 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S2 S3 S4 S5 S6 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 02 03 04 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 P2 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ)) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin ?; Q Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or,, Temporary 6c. Reason for impact 6d. Stream name 6e. (Buffer mitigation, required ?; 6f. Zone 1' impact, (square feet 6g. Zone 2 impact; (square) feet 131 P discharge stormwater Crabtree Creek No 980 445 B2 B3 64 135 136 6h. Total Buffer Impacts: 6i� Comments Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization) 1a. �Specifc_ ally describe measures taken to avoid or minimize the proposed impacts in designing project.) We have designed the storrnwater management to have one discharge point, through one 24" pipe to minimize impacts. The buffer will be protected with a tree protection/sediment fence. The discharge point will be located directly at the top of bank in order to minimize erosion. 1 b� Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Impacts will be minimized by using smaller and lighter equipment near the Neuse River Buffer, rather than large, heavy equipment. During construction, the limits of the tree protection fencing will be observed and maintained. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Type: Type: Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. 'Buffer Mitigation State Regulated Riparian Buffer Rules - required by EM �6a. Will the project result in an impact within aprotected riparian buffer that requires ',buffer Yes No mitigation Calc that requires mitigation. ul ate 6b. off yes, then identify the square feet of impact to each zone of the r�arian buffer the amount of miti ation r uired.` Zone� ` - - - -- (Reason for impa ] ,6d. - Total impacts ��Sguare feet rMultiplier - Required mitigati n feet `,(square Zone 1 3 (2 for Catawba) Zone 2 1.5 6f.1,Total buffer mitigation required: 6g. � If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation ban) ,permfttee re_ponsible riparian buffer restoration, payment into an approved in -lieu fee fundL 6h.;Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan, `1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑, No within one of the NC Riparian Buffer Protection Rules ?' '1b. If yes, then is a diffuse flow plan included? If no, explain why Diffused flow can not be achieved on this project due to the existing slope of the Neuse River Buffer being than 5% due to the from the Therefore, direct discharge to the ❑ Yes ❑X NO greater and amount of runoff site. a stream is proposed. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local governments jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally- implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): H Session Law 2006 -246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been [] Yes ❑ No attached. 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state/local) funds or the Yes ❑ No use of public (federal /state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State []Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H.1300), DWQ Surface Water or Wetland Standards; ❑ Yes Q No or Riparian Buffer Rules (15A NCAC 26.0200)?; 2b. Is this an after- the -fad permit application? ❑Yes') 0,N o ,�2c. If you answered "yes" to one or both of the above questions,\' prov ide an explanation of the violation s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in; 0Yes ❑X No additional development, which could impact nearby downstream water quality?) 3b. 'if you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the; most recent DWQ policy. If you answered "no," provide a short narrative description) 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Applicant/Agent's Signature _ __ A rs signature is valid only if an authorization letter from the applicant is provided)) ge- 2 /3 Dat ( pplican-VAgent's Printed Name Page 10 of 10 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: A tract of land being Lot 2 of the subdivision plat of new hope development in the City of Raleigh, Wake County, North Carolina PARCEL ID: 1723991957000 STREET ADDRESS: 4205 Global Street, Raleigh, NC 27610 Property Owner: New Hope Development Partners, LLC The undersigned, registered property owner of the above noted property, do hereby authorize, Jim Roth, P.E., of Cole & Associates (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): 4904 Water Edge Drive, Raleigh, NC 27606 Telephone: 909 - 322 -4373 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. , Author'zed Signature (Owner) Print Nam Date: S d� 0Tf1 !'•r. Print Name Date: 2z /