HomeMy WebLinkAbout20011269 Ver 2_CAMA Application_20130520Pat McCrory
Governor
May 16, 2013
A4
IrCD -EE R
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Braxton C. Davis John E. Skvada, III
Director Secretary
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
ZOi'3 y
Karen Higgins
Division of Water Quality
Doug Huggett
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Salty Shores Canal Owners Assn.
Carteret County, located along the existing canal within the Salty Shores
subdivision along Hwy 24.
Proposed Project: Proposes a Major Modification to Major Permit #123 -01 to include the
maintenance excavation of two existing basins, the entire canal as well as the
entrance channel. They are also asking to add the maintenance five clause.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
June 5, 2013 . If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808 -2808. When appropriate, in -depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
400 Commerce Ave., Morehead City, NC 28557
Phone: 252 -808 -28081 FAX: 252 - 247 -3330 Internet: www.n=astalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Salty Shores Canal Owners Association C/O
Ronnie Stroud, President of COA
2. LOCATION OF PROJECT SITE: Located along the existing canal within the Salty
Shores subdivision along Highway 24
Photo Index - 2000: 39 -500 grids J (18 -21), K (18 -19), L -M (19)
2006: 39 -8051 grids L -M (7), O (6 -7), P (4 -6)
State Plane Coordinates - X: 2615351.0 Y: 355895.0
Longitude: 76 °57'08.29 Latitude: 34 042'37.57
3. INVESTIGATION TYPE: D &F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit – 4/26/2013
Was Applicant Present – No
5. PROCESSING PROCEDURE: Application Received – 4/23/2013
Application Accepted Complete- 5/2/13
Office – Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan – Carteret County dated 2005
Land Classification from LUP – Limited Transition/Conservation
(B) AEC(s) Involved: EW, PTA
(C) Water Dependent: yes
(D) Intended Use: private /community
(E) Wastewater Treatment: Existing – Municipal sewer
Planned - None
(F) Type of Structures: Existing – Piers, boatlifts, bulkheads
Planned – maintenance excavation of existing basins, canal
and channel
(G) Estimated Annual Rate of Erosion: N/A
Source – N/A
7. HABITAT DESCRIPTION:
DREDGED FILLED OTHER
(A) Shallow Bottom basin 1
500 ft2
N/A
N/A
(B) Shallow bottom basin 2
2,925 ft2
N/A
N/A
(C) Shallow bottom canal
82,150 ft2
N/A
N/A
ir— (D) Shallow bottom channel
24,000 ft2
N/A
N/A
(D) Total Area Disturbed: 109,575ft2
(E) Primary Nursery Area: No
(F) Water Classification: ORW Open: No
8. PROJECT SUMMARY: This project is being proposed as a major modification to Major
Permit 123 -01. The current permit is set to expire on 12/31/13, has been renewed and
modified thru the years and allowed for the maintenance excavation of the center of the
canal, certain boatlift areas along the canal as well as the channel area. The applicant
Field Investigation Report:
SSCOA
Page 02
proposes the maintenance excavation of two existing basins, the entire canal as well as the
entrance channel. They are also asking to add the maintenance five clause.
9. Narrative Description
The Salty Shores Canal Owners Association project is located along the existing canal
within the Salty Shores subdivision which connects to Bogue Sound. The tract is bordered
by Bogue Sound Yacht Club s/d to the west and a partially developed tract of land to the
east.
The Salty Shores Canal Owners Association individual lots are a total 18.42 acres
combined and are an average of 10' above NHW. Presently there are existing individual
piers with boatlifts, bulkheads and channel markers along this tract. There is a 35' x 165'
fringe of coastal wetlands along the southeast side of the canal entrance. The coastal
wetlands consist predominately of Spartina patens. The s/d lots consist primarily of typical
lawn grasses, shrubs and trees and are stabilized by one continuous bulkhead.
The Carteret County Land Use Plan classifies this property as Limited Transition, with all
parts of the AEC classified Conservation. This section of Bogue Sound is not designated
as Primary Nursery Area, is closed to the taking of shellfish and carries a water
classification of SA/ORW. Riparian corridors are not applicable for this type of
development. The substrate in Bogue Sound is mostly sand with some silty areas. There
are SAV beds approximately 10' to 20' to the east and west of the existing channel
markers however no SAV's or shellfish beds were observed within the proposal project
area (canal, basins and channel).
10. Project Description:
The Salty Shores canal was originally opened to Bogue Sound in 1976 without state or
federal authorization and due to an enforcement action taken by the USACOE, was closed
by an earthen plug placed at the mouth of the canal until 1984 when it was reopened
through the first major permit 157 -84. This permit authorized canal maintenance and
bulkhead construction however did not authorize the access channel. The existing marked
channel was historically used to access the ICW and existed in aerial photography from the
early 80's. The current existing major permit # 123 -01, which has been modified and
renewed over the years, authorized the maintenance excavation of the existing canal,
excavation of certain boatlift areas and excavation of the existing entrance channel. The
current proposal is to maintenance excavate the entire canal (average of 53' wide),
excavate two boat basin areas and excavate the entrance channel.
To facilitate safe use of the entrance channel, the main portion of the canal as well as the
boat basins and individual boatlifts along the canal properties, the applicants are proposing
to maintenance excavate with a bucket to barge method. A total of 4,058 cubic yards of
material would be removed below nhw from all the areas combined. The excavation
dimension for boat basin one is 20' x 25', 65' x 45' for basin two, 53' x 1,550' for the
canal and 40' x 600' for the entrance channel. All the areas have an average depth of -3'
nlw /mlw (4.8' to 5' msl) with a proposed final depth of -4' nlw. The connecting water
depths within this area range from - 4'nlw /mlw to - 4.5'nlw /mlw.
Field Investigation Report:
SSCOA
Page 03
The excavation for the entrance channel would be located inside of the existing channel
markers and approximately 10' to 20', depending on location, from the SAV areas. The
width in between the channel markers is 40' but due to shoaling the entrance channel
width has been reduced. The entrance channel was shown thru aerial photography as 40'
wide in the early 90's and was previously excavated around 2009 to this width.
A member of the SSCWA (Mr. Bobby Bell) has given written permission to dispose of
the spoils onto his property located at 131 Salty Shores Road. The spoil location would be
approximately 200' plus from normal high water, would have dimensions of 80' x 200'
and would consist of 16,000 square feet.
11. Anticipated Impacts:
The maintenance excavation for the basins, canal and entrance channel would disturb a
total of 109,575ft2 of shallow bottom habitat and remove 4,058 cubic yards of sandy /silty
material from the system. The excavation has the potential to cause a temporary increase
in turbidity during excavation activities. In order to protect the SAV beds it is
recommended a minimum distance of 10' from the excavation area be maintained.
Name: Heather Styron Date: 5/8/13 Morehead City
ATTACHMENT
G. Additional Information
a. Narrative
We herby propose to dredge the existing center of Salty Shores Canal and
channel to a depth of -5' MSL which is 3.9' below NLW. All to be done
within the existing foot prints of the existing canal and channel. We also
propose to dredge the existing boat lifts and slip areas to a depth not to exceed
4' below NLW. All dredging is to be done by a barge excavator with sandy
silt (spoil) to be barged to the property of Bobby Bell where the spoil will be
loaded onto dump trucks and hauled off site to 131 Salty Shores Rd.. This is
in order to keep the existing Salty Shores Canal navigable and usable
primarily for recreational purposes.
We expect to dredge the canal some time in 2014 and would like to be able to
perform any required maintenance of boat lifts, boat slip areas and canal over
the next 5 years.
The last dredging of the canal was done in July of 2008.
The spoil disposal area is an area 80' X 200' consisting of 16,000 SF (0.367
acres).
i1T
�
a
iU
t^J
4
Ie■ E'Ll
WFUCATIONUr
Major Development ftrmft
(last revised 1227106)
North Carolina DMSION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Salty Shores Canal Owners Association
Project Name (d applicable)
SALTY SHORES CANAL MAINT.
Applicant 1: First Name
RONNIE
MI
G
Last Name
STROUD (PRESIDENT)
Applicant 2: First Name
MI
G
MI
Last Name
if additional applicants, please attach an additional
page(s) with names listed.
Mailing Address
164 RADFORD LANE
nn v� CiTY
PO Box
City
Newport
State
NC
ZIP
28570
Country
USA
ZIP
28570
Phone No.
252-714-4921 exL
FAX No.
- -
street Address (if different from above)
Phone No. 2
- - ext.
City
State
ZIP
Email
Street Address (if different from above)
2. Agent/Conftctor Information
Business Name
CEIVE])
Agent/ Contractor 1: First Name
RONNIE
MI
G
Last Name
STROUD
3 20,13
Agent/ Contractor 2: First Name
MI
Last Name
nn v� CiTY
Mailing Address
164 RADFORD LANE
PO Box
City
Newport
State
NC
ZIP
28570
Phone No. 1
252-714-4921 ext.
Phone No. 2
- - ext.
FAX No.
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
<Form continues on back>
252- 808 -2808 :. 1- 888- 4RCOAST .: www.nccoastaimanagement.net
Form DCM MP -1 (Page 2 of 4)
APPUCATION for
Major Development Permit
3. Project Location
a. Total length of shoreline on the tract (fL)
County (can be multiple)
Street Address
ACCESS CHANNEL= 23,800SF /CANAL= 85,340SF
State Rd. #
CARTERET
164 RADFORD LANE
NWL (normal water leveo
(if many lot sizes, please attach additional page with a list)
Subdivision Name
City
ON LOTS MOVED GRASS.
State
Zip
SALTY SHORES, F&J, SALTY'B', RADFORD
NEWPORT
NC
28570-
ESTATES
i. Is the proposed project consistent with the applicable zoning?
LOTS ARE RESIDENTIAL
(Attach zoning compliance certificate, if applicable)
Phone No.
Lot No.(s) (of many, attach additional page with list)
252-714-4921 ext
SEE ATTACHMENT, I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
WHITE OAK
BOGUE SOUND
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural []Manmade ❑Unknown
BOGUE SOUND
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
[]Yes ®No
work falls within.
CARTERET COUNTY
4. Site Description
a. Total length of shoreline on the tract (fL)
b. Size of entire tract (sq.R)
3,480 BULKHEADED CANAL FRONTAGE
ACCESS CHANNEL= 23,800SF /CANAL= 85,340SF
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
SEE ATTACHMENT,
NWL (normal water leveo
(if many lot sizes, please attach additional page with a list)
1VAV ❑NHW or ®NWL
e. Vegetation on tract
ON LOTS MOVED GRASS.
ON CANAL & CHANNEL NONE RECEMD
f. Man -made features and uses now on tract APR 2 3 2013
BULKHEADED CANAL WITH BOAT LIFTS & BOAT SLIPS
DCNf IVJiD CMV
g. Identify and describe the existing land uses adiacent to the proposed project site.
SINGLE FAMILY RESIDENTIAL
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
LOTS ARE RESIDENTIAL
(Attach zoning compliance certificate, if applicable)
®Yes []No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attache copy. ❑Yes ®No ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Fonn continues on next page>
252- 808 -2808 :. 1- 888- 4RCOAST :: www.nccoastalmanagement.net
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either () or (i) above, has a delineation been conducted? ❑Yes []No
(Attach documentation, if available)
n. Describe ehdsting wastewater treatment facilities.
LOTS ARE BY INDIVIDUAL SEPTIC TANK SYSTEMS
o. Describe edsting drinking water supply source.
WEST CARTERET WATER CORPORATION
p. Describe edsting storm water management or treatrnent systems.
STORM WATER RUN OFF ENTERS CANAL BY DITCH & CULVERTS & OVER TOP OF BULKHEAD, LOTS ARE COVERED
BY MOWED GRASS
5 Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑PublidGovemment
®Pdvate/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
TO KEEP CANAL MAINTAINED FOR PRIMARILY RECREATIONAL BOATING USE AD SOME COMMERCIAL FISHING
USE OF THE COMMUNITY. WE ARE REQUESTING A 5 YEAR MAINTENANCE PERIOD.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
DREDGING IS TO BE DONE BY BARGED EXCAVATOR, MATERIALS TO BE LOADED ON BARGE AND THEN
OFFLOADED TO DUMP TRUCKS AT BOBBY BELL'S PROPERTY AND THEN HAULED OFF SITE.
d. List all development activities you propose.
PROPOSE TO REMOVE SANDY SILT ALONG CENTER OF CANAL & EXISTING CHANNEL TO A DEPTH OF -5' MSL.
ALSO PROPOSE TO REMOVE SANDY SILT AT BOAT LIFTS & SLIPS TO A DEPTH NOT TO EXCEED -5' MSL.
e. Are the proposed activities maintenance of an ehdsting project, new work, or both? MAINTENANCE OF AN EXISTING
PROJECT
f. What is the appropmate total disturbed land area resulting from the proposed project? 2.4 ❑Sq.Ft or ®Acres
g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA
that the public has established use oft
h. Describe location and type of eAssting and proposed discharges to waters of the state.
THE EXISTING WATER DISCHARGE ARE AS DESCRIBED IN ITEM 4P ABOVE. NONE OF THIS WILL CHANGE BY THIS
DREDGING PROJECT.
RECEIVED
I. Will wastewater or stomnaater be discharged into a wetland? ❑Yes ®No ❑NA
APR 2 3 Z013
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA
j. Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes, attach a mitigation proposal. DCM -MHD M,
<Form continues on bacb
252 - 808 -2808 .. 1- 888- 4RCOAST :. www.nccoastaimanagement.net
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form. (MP- f) the ftqmmV dams below, yapplicable, must be submilted in order for the apphcahW
package to be complete. hems (a) — (I) are always applicable to any major development apprbstion. Please consult the apPlication
instruction booldet on law to properly prepare Me required dams below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant dawns title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name TERESA GARNER Phone No. 252 - 223-5316
Address P.O. BOX 836,821 NINE FOOT RD., NEWPORT, NC 28570
Name JOHN HUNT JF;L Phone No. 910. 796-0510
Address 1616 SOFTWIND WAY, WILMINGTON, NC 28403
Name Phone No.
Address
g. A list off previous state or federal permits issued for work on the project trail Include permit numbers, permittee, and issuing dates.
l5&() )
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 11 3A 1 -10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
1 7. Certification and Permission to Enter on Land I
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fad grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date `f — Z 3 — /3 Print Name A. D Al M Iii G- 15,1, /L 0 1/ .0
Signature /fu�'►1.r �l _ �f'"
Please indicate application attachments pertaining to your proposed project. R�CEiVED
BMW MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges ankTCulver�s
❑DCM MP -3 Upland Development
❑DCM MP-4 Structures Information
APP
DCM -MHD CrrY
252- 808 -2808 .. 1- 888- 4RCOAST .. www.nccoastaimanagement.net
Form DCM MP -2
EXCAVATION and FILL
((Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet
1. EXCAVATION ❑ This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards. SANDY SILT
C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards.
submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
IN ORDER TO MAINTAIN CANAL IN A NAVACABLE
CONDITION AND IN ORDER TO MAINTAIN BOAT LIFT AND
SUPS IN A USABLE CONDITION
2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
131 SALTY SHORES RD. 80 X 200'
SEE DISPOSAL AREA SPOTTED ON VICINITY MAP OF
PLANS
c. (i) Do you claim title to disposal area?
❑Yes ®No ❑NA
(ii) If no, attach a letter granting permission from the owner.
d. (i) Will a disposal area be available for future maintenance?
Wes ❑No ❑NA
(ii) If yes, where?
SAME AREA
e. (i) Does the disposal area include any coastal wetiandshnarsh f. (i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No ❑NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected. (ii) If yes, how much water Aed?
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of disposal in these areas:
SEE FOLLOWING PAGE FOR ANSWER:
APB; 2 3 2013
DCM - MAD CITIP
252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06
Access
Other
Channel
(NLW or
Canal
goat Basin
Boat Ramp
Rock Groin
Rock
Breakwater
(excluding
shoreline
NWL )
r
stabilization
Length
(000`
1150
0
0
0
Width
�i
53`
- c%
0
0
0
9 Existing
Depth
4.1'MSL
4.1'MSL�
2.8'MS L�
WA
NA
NA
..
�' ,
Final Project
Depth
5.7tASL
5 Q'MS�
4.8MSL�
N/A
NA
NA
1. EXCAVATION ❑ This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards. SANDY SILT
C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards.
submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
IN ORDER TO MAINTAIN CANAL IN A NAVACABLE
CONDITION AND IN ORDER TO MAINTAIN BOAT LIFT AND
SUPS IN A USABLE CONDITION
2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
131 SALTY SHORES RD. 80 X 200'
SEE DISPOSAL AREA SPOTTED ON VICINITY MAP OF
PLANS
c. (i) Do you claim title to disposal area?
❑Yes ®No ❑NA
(ii) If no, attach a letter granting permission from the owner.
d. (i) Will a disposal area be available for future maintenance?
Wes ❑No ❑NA
(ii) If yes, where?
SAME AREA
e. (i) Does the disposal area include any coastal wetiandshnarsh f. (i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No ❑NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected. (ii) If yes, how much water Aed?
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of disposal in these areas:
SEE FOLLOWING PAGE FOR ANSWER:
APB; 2 3 2013
DCM - MAD CITIP
252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06
Form DCM MP -2 (Excavation and Fill, Page 2 of 3)
TO PROVIDE AN AREA CLOSE TO PROJECT TO LOCATE
THE SPOIL AND FOR FILL MATERIAL AT THE DISPOAL
AREA.
3. SHORELINE STABILIZATION ®This section not applicable
(if development is a wood groin, use MP-4 — Structures)
a. Type of shoreline stabilization: b. Length:
❑Bulkhead ❑Riprap ❑Breakwater /Sill ❑Other. Width:
c. Average distance watenvard of NHW or NWL: d. Maximum distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap
Breakwater /Sill Other
i. Source of fill material.
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No ❑NA
(i) If yes, state amount of erosion and source of erosion amount
information
h. Type of fill material.
4. OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlandstmarsh (CW),
If yes submerged aquatic vegetation (SAV), shell bottom (SB), or
n Amount of material to be laced in the water other wetlands (WL)? If any boxes are checked, provide the
() p number of square feet affected.
(iii) Dimensions of fill area ❑CW ❑SAV ❑SB
(iv) Purpose of fill OWL ❑None
(ii) Describe the purpose of the fill in these areas:
CEIVEI➢
J � �
. • I - •r E.u1J
5. GENERAL Cffy
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
N/A HYDRAULIC DREDGE TO BARGE, BARGE TO DUMP TRUCK
AND HAUL OFF SITE TO DISPOSAL AREA
c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project
❑Yes ❑No ❑NA site? ❑Yes ❑No ❑NA
(ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
SALTY SHORES CANAL MAINTENANCE
Date Project Name
252 -808 -2808 :: 1. 888- 4RCOAST :: www.nccoastaimanaaement.net revised: 12/26/06
Form DCM MP -2 (Excavation and Fill, Page 3 of 3)
SALTY SHORES CANAL OWNERS ASSOCIATION
Applicant Name
Applicant Signature
RECEIVER
t, PR 2 3 ?C13
DCM M cny
252 -808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06
ATTACHMENT
3. Project location -Lot No. 9
Bobby A. Bell Lot
F & J Subdivision - Lots 3, 2 & 1
Salty Shores Section 2- Lots 10, 11, 12, 13, 14, 15, & 16
Salty B Section III- Lots 13,12 & 11
Salty B. Section IV -Lots 1,2,3,4,5,6,7,8,9 &10
Radford Estates -Lots 5,6,7,8,9,10 & 11
4. Site Description
c. size of individual lots
Bobby A. Bell
F & J Subdivision
Salty Shores Section II
Salty B Section III
Salty B Section IV
Radford Estates
2.0 ac.
Lot 3 0.49 ac.
Lot 2 0.51 ac.
Lot 1 0.44 ac.
Lot 10 0.43 ac.
Lot 11 0.43 ac.
Lot 12 0.44 ac.
Lot 13 0.44 ac.
Lot 14 0.45 ac.
Lot 15 0.45 ac.
Lot 16 0.39 ac
Lot 13 0.46 ac
Lot 12 0.46 ac
Lot 11 0.46 ac
Lot 1 0.50 ac
Lot 2 0.50 ac
Lot 3 0.50 ac
Lot 4 0.50 ac
Lot 5 0.50 ac
Lot 6 0.50 ac
Lot 7 0.50 ac
Lot 8 0.50 ac
Lot 9 0.50 ac
Lot 10 0.54 ac
Lot 5 0.38 ac
Lot 6 0.35 ac
RECEIVED
Lot 7 0.35 ac
Lot 8 0.35 ac
?0113
Lot 9 0.35 ac
Lot 10 0.36 ac
Lot 11 0.39 ac
0T�y
a
I, Bobby Bell, hereby grant permission for Salty Shores Canal Owners
Association to dispose of spoil from dredging of Salty Shores Canal onto my
property located at 131 Salty Shores Rd. for the term of the dredging permit
currently requested.
This 4A day of 20t3.
N10A* WA�i
OM
RECEIVED
APR Z :,�! i( ?j?
i?CN!* k'•� C ?TV
t� � GR1;��
6R
DAD
14 ja 2 �
�plSn�sA�- slr�
r
T
0
A
0
w�
y� v
0
sCOTTy .8 7-AKt4Y
LAW 8 Z"C E I J
20' Do,--x Acssss —�
r= A $ E M E N -; @
TA M E 5 L4-:,4 RY
LSAL.Tr B S �E C.
M'b' Is, P89 @
CL1 'r 7'0/V cN,=-A.L
LSE
tz
VIA
uE S�uND
VIC1N ry MAP
g ®A7' RA M P
M,4TGN 1.tN
�AJD
a1 �7 -
,o
/" z- .4 0'
4 TPrNY A WE61<5 PF-F f1 R Y ,=1.4.1 0 Y A F_ MM A LEF.�, 1308,6Y
o LU
\
L W J
SALT° I 5r`G, _T- i
MA 24-, P. P- 2.
o � � 0 8
LINDA 0 WARRON A Mc GAA
L/Fr op,
r,L I P 44t
AY. IL07-rO m
�FL/VATtotV
AV, WATER DF'Prk 0 -
NoRA "Ac L-ow TIDE
/
-2,3
A
4-
m
s
-3. Z
--
av
7
Z Ga.—
1.7
--- - --
� r
�5 NfGO�E
sv
_. I
17
7
8
'
- - - --
/ 5
- 4.0
--
2-10
` 3, 4t
-. -_
Z -- --
- -
- 29
/.q
- - -- 3/
-2.7
3-5
a 4
3Q-
- jr. 6
• i► i
LZ
•
X i T Cun0�: c /- Anrn ►
OAINEI� : 5A L TY SPORES CANAL
OWNEkS A SSOC t A T/O N
WH ITEoAl< TWP. CAR7Er\ ET CO. �or�,rH CPrr �IU�
MA PRrz PARED 8r ROfvN 1 5r, R0L/p FEBRVARY 28 2013
�N lz�
b �
M 1 Y.4 T F- 3 �
1, SALTY ,SHO,117,B CANA4. OWNT-AS P f<'oP,0 Se
114 CC.rla1A• 15: 14 toAI,'nE0 C-HA NNrL~
2. PROPOS46 499460C-11"G PER40, r° litCc.,VDE
,0PE -0 L�t "r., dit t*1Ft -1fVa 4L L30AT L_lFr.5
,S SL /P.S,
3, AL.L. El-J= )tATtoniS fC Yyp:TEtZ ARf
5As00 Oka McAh+ -5EALi<VF-1, P'4 7- vM
SEE CR0S.5 sCCr141?A.1J,
�-/
j�O G 5 r R Ci V Q
� NN (� •
to
K EV1 N W.
I B L,=SGIa
PoAT ►CAMP o
sg� eti�SEr ' ^,
�.iN,bA 5T/4UVD
D
D 1
SON 5,ANDPA
a
/o
,1410 ,� VDIiN
MORA
TAY" ® R Zf
c9al5 r/N TpY�oI
RADF'olRp Esr,►°r°Es N.O.
Assfleta�ICaiv
�-+ 00
r E F SSA G-A R /
PUIRCE LL
jj 6 -r- o 0 _
B �tpO MA�TcN t-��E
.A
X11 'VI
G L) So v N
5i4EE7- I OF
vi
A
m
av
�5 NfGO�E
sv
a
/o
,1410 ,� VDIiN
MORA
TAY" ® R Zf
c9al5 r/N TpY�oI
RADF'olRp Esr,►°r°Es N.O.
Assfleta�ICaiv
�-+ 00
r E F SSA G-A R /
PUIRCE LL
jj 6 -r- o 0 _
B �tpO MA�TcN t-��E
.A
X11 'VI
G L) So v N
5i4EE7- I OF
9
g!,
IRL-4WIMMM I Mrl V-]V-Vfm