Loading...
HomeMy WebLinkAbout20050732 Ver 27_Stormwater Info Phase 8_20130523vMq<I't&cREEv TO: NCDENR - DWQ 401 Unit 512 N Salisbury Street Archdale Building -9"h Floor Raleigh, NC 27604 ATTEI'MON: Ms. Annette Lucas WE ARE SENDING: ❑ Originals ❑ Specifications 2U05- 0132L u;Lj 'LETTER OF TRANSMITTAL DATE: May 21, 2013 PROJECT NO: 2735 -0092 TASK NO: EXP RE: Briar Chapel - Phase 8 TRANSMITTAL NO: 1 PAGE 1 OF 1 ® Prints ® Calculations ❑ Shop Drawings ❑ Samples ❑ Other - Quantity Drawing No. Rev. Description Status 2 Stormwater Design Plans G 2 Narrative & Supporting Calculations G 2 Wet Pond #13 O &M Agreement (1 Original,1 copy) G 2 Wet Pond #13 Design Supplements G Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks REMARKS: Annette, Please find the enclosed documents for your review. Please let us know if you have any questions or comments. Thank you. Cc: McKIM & CREED, INC. Signed a�- Gareth Avant, PE Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. GCA C3.3 -C3.4 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. GCA D4.1 -D4.3 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross- section, - Vegetation specification for planting shelf, and - Filter strip. GCA D4.1 -134.3 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. GCA N/A 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. GCA Calc Booklet 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. GCA C3.1 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. GCA Calc Booklet 7. The supporting calculations. GCA Included 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. GCA Included 9. A copy of the deed restrictions (if required). N/A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.8- 9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit No (to be provided by DWQ) Red triangles at the upper right hand corner indicate design comments Please complete the yellow shaded items ��A y�O� VVAT�9O� MEW > O t STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Y (Y or N) Project name Briar Chapel Development - Great Rdge Parkway Extension Contact person Gareth Avant, PE Phone number 919.233 8091 Date 17- May -2012 Drainage area number 1- Wet Pond #13 II. DESIGN INFORMATION 0.12 inlhr Site Characteristics Pre - development 1 -yr, 24fir peak flow Drainage area 843,368 f? Impervious area, post -development 420,658 f? % impervious 49.88% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 35,063 ft3 OK Volume provided 36,321 ft" OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume ft3 Pre - development 1 -yr, 24-hr runoff fl3 Post-development 1 -yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1 y 24hr storm peak flow required? Y (Y or N) 1 -yr, 24-hr rainfall depth 3.0 in Rational C, pre - development 0.40 (unitless) Rational C, post - development OR (unitless) Rainfall intensity: ) -yr, 24-hr stone 0.12 inlhr Insufficient. Check intensity calculation. Pre - development 1 -yr, 24fir peak flow 12.87 ft31sec Post - development 1 -yr, 24-hr peak flow 47.65 f3 /sec Pre/Post 1 -yr, 24 -hr peak flow control 34.78 g3 /sec Elevations Temporary pool elevation 418.00 fmsl Permanent pool elevation 414.50 fmsl SHWT elevation (approx. at the pens. pool elevation) fmsl Top of 1Oft vegetated shelf elevation 415.00 fmsl Bottom of 1Oft vegetated shelf elevation 414.00 fmsl Data not needed for calculation option #1, but OK if provided. Sediment cleanout, top elevation (bottom of pond) 409.00 fmsl Sediment cleanout, bottom elevation 408.00 fmsl Data not needed for calculation option #1, but OK if provided. Sediment storage provided 1.00 It Is there additional volume stored above the state - required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401 -Wet Detention Basin -Rev 8- 9/17/09 Parts 16 11 Design Summary, Page 1 of 2 Permit No 11. DESIGN INFORMATION Surface Areas Area, temporary pool 25,887 fe Area REQUIRED, permanent pool 21,084 If SAIDA ratio 2.50 (unitless) Area PROVIDED, permanent pool, Awm_pw 21,256 fe OK Area, bottom of 1Oft vegetated shelf, Ab,i do 17,980 fe Area, sediment deanout, top elevation (bottom of pond), At„_pw 8,498 ty Average depth used in SAIDA, d.„ (Round to nearest 0.51t) Volumes ft Volume, temporary pool 36,321 ft3 OK Volume, permanent pool, V,,y,d 82,398 ft3 Y Volume, forebay (sum of forebays if more than one forebay) 16,746 ft3 Diameter of orifice ('If circular) Forebay % of permanent pool volume 20.3% % OK SAIDA Table Data in Design TSS removal 90% Coastal SAIDA Table Used? N (Y or N) Driving head (H,) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2 50 (unitless) (Y or N) Average depth (used in SAIDA table): Weir type Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Coefficient of discharge (Q Volume, permanent pool, Vp,,,_pw 82,398 ft3 Area provided, permanent pool, Apm w 21,256 If ft Average depth calculated 3.88 ft OK Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) 4.0 It OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ap m_,d 21,256 fe 12.27 ft3 /sec Area, bottom of 1 Oft vegetated shelf, Aw ,w 17,980 fe Area, sediment deanout, top elevation (bottom of pond), A 8,498 f? (to be provided by DWQ) 'Depth' (distance b/w bottom of 1Oft shelf and top of sediment) 5.00 ft Average depth calculated ft Average depth used in SAIDA, d.„ (Round to nearest 0.51t) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice ('If circular) 2.50 In Area of orifice (if- non-circular) in Coefficient of discharge (Co) 0.60 (unitless) Driving head (H,) 0.50 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (Q (unitless) Length of weir (L) ft Driving head (H) ft Pre- development 1 -yr, 24-hr peak flow 12.87 fe/sec Post -development 1 -yr, 24-hr peak flow 12.27 ft3 /sec Storage volume discharge rate (through discharge orfifice or weir) 0.45 f?/sec Storage volume drawdown time 2.58 days OK, draws down in 2 -5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 1.5 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: 8' DIP with gate valve Form SW401 -Wet Detention Basin -Rev 8. 9/17/09 Parts I. & 11 Design Summary, Page 2 of 2 Permit Number: (to be provided by DJYQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and /or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401 -Wet Detention Basin O &M -Rev.4 Page 1 of 4 Permit Number: (to be provided by UWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401 -Wet Detention Basin O &M -Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problenr. How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919 -733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.50 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 409.00 j 1 FOREBAY BASIN DIAGRAM ill in the blanks) Lft Min. Sediment Storage Permanent Pool Elevation 414.50 Pool - Sediment Removal Elevation 40 .0 - - - - - -- Volume - - - -- -------- - - - - -- Bottom Elevation MAIN POND Form SW401 -Wet Detention Basin O &M -Rev.4 Page 3 of 4 1 -ft N%n. Sediment Storage Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Briar Chapel - Phase 8 BMP drainage area number:I - Wet Detention Pond #13 Print name:Kevin Graham Title:Vice President Operations Address: 16 Windy Knoll Circle, Chapel Hill. NC 27516 Signature: CL Date: S ���Z/ 3 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, G, Leo^ ywyrn o H , a Notary Public for the State of County of do hereby certify that `LG vi H 6;_A .-A 11 a w+ personally appeared before me this iit ti day of 8ry , 6V 13 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements . w SEAL My commission expires _1 l l uz I q Witness my hand and official Form SW401 -Wet Detention Basin O&M -Rev.4 Page 4 of 4 1 1 Ds- ID13a -Ua) 401 NARRATIVE & SUPPORTING CALCULATIONS Briar Chapel Development Phase 8 Chatham County, North Carolina May 21, 2013 Prepared for: BRIAR �IsKCHAPEO Newland ommumm NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 A Prepared By: 41$� MCIUM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M &C Project No. 02735 -0092 ```���H »�C ro 03M = 0512112013 PROJECT DESCRIPITON ' The purpose of the project is to construct water, sewer and roadway infrastructure to support 110 residential lots within the Briar Chapel development. This will be the second of several phases of construction in this proximity. Based on the conditions of the approved 401 Water Quality Certification, NCDENR -DWQ will require runoff from the roads to be captured and treated for 857o TSS removal before being discharged into existing stream buffers. To meet this requirement, the runoff from the northern portion of this phase of construction will be directed to Wet Detention Pond # 12 as approved under the Great Ridge Parkway Extension project (DWQ Project # 05 -0732v25). The runoff from the southern portion of this phase will be directed to a new BMP, Wet Detention Pond # 13. Calculations for this new facility are included in this package. Upon completion of the project's construction, the proposed public roads will be turned over to and maintained by NCDOT. SITE DESCRIPTION The project area is approximately 24.7 acres of disturbed area located within the BC South development area, adjacent to Great Ridge Parkway and near the Margaret B Pollard Middle School. This portion of the development generally takes place on the north side of a ridge that bisects the site from north to south. The slopes in the site range from 5-20% in localized areas. SOILS According to the Chatham County Generalized Soil Survey, the soils located on the site are classified as Wedowee sandy loam, 2% to 15% slopes (WeB, WeC, WeD) and Vance sandy loam, 276 to 6% slopes (VaB). The following soil descriptions are associated with the soils found on the site: We(X) - Wedowee sandy loam soils are often found in piedmont uplands, along ridges and side slopes. Permeability is moderate and the soils are well drained. Soils have a low shrink /swell potential. The seasonal high water is generally more than 6.0 feet below the surface. Va (X) - Vance sandy loam soils are often found in piedmont uplands along ridges, and side slopes. Permeability is slow and the soils are well drained. The seasonal high water is generally more than 6 feet below the surface. WET DETENTION DESIGN The wet detention pond on this site has been designed to remove 90% of the total suspended solids entering from the surrounding impervious drainage areas before discharging into the adjacent stream. The calculations provided with this package include all projected future drainage areas that might be captured by the pond. Treated runoff will be dissipated by a riprap outlet protection device before entering any stream buffers. IDesign parameters were taken from the BMP manual and from DWQ's design supplement forms. I MAINTENANCE CONSIDERATIONS ' The property owner shall be responsible for periodic inspection and maintenance of all temporary erosion control measures devices. Any measure that fails to function as intended shall be repaired immediately. 1 1 1 1 1 1 1 POINT PRECIPITATION`' FREQUENCY ESTIMATES ' FROM NOAA ATLAS 14 y CHAPEL HILL 2 W, NORTH CAROLINA (31 -1677) 35.9086 N 79.0794 W 462 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G M Bonnu, D Martin, B Lm, T Parzybok M Yelda, and D Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 _ E)dracted Wed Jan 20 2010 _ Confidence Limits Seasonality Location Maps Other Info. _GIS data Maps r Docs Re um to State Map -- -- - -- * These precipitation itequencyeshmates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAA Mas 14 Document for more information. NOT E Formatting forces estimates near zero to appear as zero 5 F_ * Upper bound of the 90% confidence interval Precipitation Intensity Estimates ( in/hr) (years) min min min min nun hr Fhr hr hr �48- day �Y 1-day _ day day day day ' 1 5.39 4.31 3.59 2.46 1.53 0.92 0.65 0.39 0.23 0.13 0.08 0.04 0.03 0.02 0.01 0.01 0.01 0.01 6.36 5.08 4.26 2.94 1.85 1.11 0.79 0.47 0.28 0.16 0.09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 ' I ' 7.31 5.86 4.94 3.51 2.25 1.37 0.97 0.58 0.34 0.20 0.12 0.06 0.04 0.03 0.02 0.02 0.01 0.01 10 8.06 6.44 5.43 3.94 2.56 1.57 1.12 0.68 0.40 0.23 0.13 0.07 0.05 0.04 0.02 0.02 0.02 0.01 'F2- 5 8.83 7.04 5.95 4.41 2.93 1.82 1.31 0.79 0.48 0.27 0.16 0.09 0.05 0.04 0.03 0.02 0.02 0.01 50 9.38 7.48 6.31 4.75 3.22 2.02 1.47 0.89 0.54 0_31 0:17 0.10 0.06 0.05 0.03 0.02 0.02 0.02 100 9.89 7.85 6.62 5.07 3.49 2.22 1.62 0.99 0.60 0.34 0.19 0.11 0.07 0.05 0.03 0.02 0.02 0.02 200 10.32 8.18 6.88 5.35 3.75 2.41 1.78 1.09 0.67 0.38 0.21 0.12 0.07 0.06 0.04 0.03 0.02 0.02 500 10.78 8.52 7.15 5.69 4:08 2.66 1.99 1.23 0.76 0.43 0.24 0.13 0.08 0.06 0.04 0.03 0.02 0.02 ' 1000 11.14 8.77 7.34 5.94 4.34 2.87 2.16 1.36 0.85 0.46 0.26 0.14 0.09 0.07 0.04 0.03 0.02 0.02 *The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequencyare greater than. -These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAAMas 14 Document for more information. NOTE. Formatting prevents estimates near zero to appear aszero. * Lower bound of the 90% confidence interval ' Precipitation Intensity Estimates ( in/hr) 24 48 4 [ZE" 5 F10 [ 1! [ 3? y n imn r r y aay hr day hr day day [d3O day (years) min mn mn min m hr Precipitation Intensity Estimates (in/hr) 5 mm F110 3 hr 66 6r 12 hr Fk 4 0 20 [4L_ r 4 day 7 day 1-0 45 F60 (y`rs) ' min �n 4.93 13.94 3.28 min 2.25 min 1.40 nun 0.84 0.60 0.36 0.21 0.12 0.07 0.04 0.03 0.02 001 0.01 In, 0.01 I ` 5.81 4.64 3.89 2.69 1.69 1.01 0.72 0.43 0.25 0.15 0.09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 �- 6.70 5.36 4.52 3.21 2.06 1.25 0.89 0.53 0.32 0.19 0.11 0.06 0.04 0.03 0.02 0.02 0.01 0.01 ' 10 7.38 5.90 4.98 3.61 2.35 1.43 1.03 0.62 0.37 0.22 0.12 0.07 0.04 0.03 0.02 0.02 0.01 0.01 25 8.11 6.46 5.46 4.04 2.69 1.66 1.20 0.73 0.44 0.25 0.15 0.08 0.05 0.04 0.03 0.02 0.02 0.01 ' 1 0 9 07 7.21 6.07 4.65 3.20 2.02 1.48 0.91 0.56 0.32 0.18 0.10 0.06 0.05 0.03 0.02 0.02 0.02 200 9.44 7.49 6.30 4.90 3.44 2.20 1.63 1.01 0.62 0.35 0.20 0.11 0.07 0.05 0.03 0.03 0.02 0.02 ' 500 9.85 7.79 6.54 5.21 3.73 2.43 1.82 1.14 0.71 0.40 0.22 0.12 0.08 0.06 0.04 0.03 0.02 0.02 1000 10.19 8.02 6.71 5.43 3.96 2.62 1.98 1.24 0.78 0.43 0.24 0.13 0.08 0.06 0.04 0.03 0.02 0.02 * These precipitation itequencyeshmates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAA Mas 14 Document for more information. NOT E Formatting forces estimates near zero to appear as zero 5 F_ * Upper bound of the 90% confidence interval Precipitation Intensity Estimates ( in/hr) (years) min min min min nun hr Fhr hr hr �48- day �Y 1-day _ day day day day ' 1 5.39 4.31 3.59 2.46 1.53 0.92 0.65 0.39 0.23 0.13 0.08 0.04 0.03 0.02 0.01 0.01 0.01 0.01 6.36 5.08 4.26 2.94 1.85 1.11 0.79 0.47 0.28 0.16 0.09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 ' I ' 7.31 5.86 4.94 3.51 2.25 1.37 0.97 0.58 0.34 0.20 0.12 0.06 0.04 0.03 0.02 0.02 0.01 0.01 10 8.06 6.44 5.43 3.94 2.56 1.57 1.12 0.68 0.40 0.23 0.13 0.07 0.05 0.04 0.02 0.02 0.02 0.01 'F2- 5 8.83 7.04 5.95 4.41 2.93 1.82 1.31 0.79 0.48 0.27 0.16 0.09 0.05 0.04 0.03 0.02 0.02 0.01 50 9.38 7.48 6.31 4.75 3.22 2.02 1.47 0.89 0.54 0_31 0:17 0.10 0.06 0.05 0.03 0.02 0.02 0.02 100 9.89 7.85 6.62 5.07 3.49 2.22 1.62 0.99 0.60 0.34 0.19 0.11 0.07 0.05 0.03 0.02 0.02 0.02 200 10.32 8.18 6.88 5.35 3.75 2.41 1.78 1.09 0.67 0.38 0.21 0.12 0.07 0.06 0.04 0.03 0.02 0.02 500 10.78 8.52 7.15 5.69 4:08 2.66 1.99 1.23 0.76 0.43 0.24 0.13 0.08 0.06 0.04 0.03 0.02 0.02 ' 1000 11.14 8.77 7.34 5.94 4.34 2.87 2.16 1.36 0.85 0.46 0.26 0.14 0.09 0.07 0.04 0.03 0.02 0.02 *The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequencyare greater than. -These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAAMas 14 Document for more information. NOTE. Formatting prevents estimates near zero to appear aszero. * Lower bound of the 90% confidence interval ' Precipitation Intensity Estimates ( in/hr) 24 48 4 [ZE" 5 F10 [ 1! [ 3? y n imn r r y aay hr day hr day day [d3O day (years) min mn mn min m hr POINT PRECIPITATION ' FREQUENCY ESTIMATES FROM NOAA ATLAS 14 CHAPEL HILL 2 W, NORTH CAROLINA (31 -1677) 35.9086 N 79.0794 W 462 feet ' from 'Precipitation- Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G M Bonnm, D Martin, B Lm, T Parzybok, M Yekta, and D. Riley NOAH, National Weather Service, Silver Spnrrg, Maryland, 2004 _ Extracted Tue Jan 19 2010 ' Confidence Limits Seasonality Location Maps I Other r I GIS data Maps Docs Return to State Map ' Precipitation Frequency Estimates (inches) T-T-T45 F60 (years) min min min min min min hr Fhr hr hr hr day [day day day day day day Precipitation Frequency Estimates (inches) ' [j 50 F10 F . - - - - -[145 160 inn 3 hr 6 hr �2 hr 24 hr 48 hr 4 day ' F 1 0.41 0.66 0.82 1.12 1.40 1.68 1.79 2.15 2.54 2.96 3.46 3.87 4.44 5.05 6.76 8.39 10.69 12.84 I ` 0.48 0.77 0.97 1.34 1.69 2.02 2.16 2.59 3.06 3.58 4.17 4.64 5.30 6.00 7.97 9.88 12.52 14.97 I ' 0.56 0.89 1.13 1.60 2.06 2.49 2.66 3.20 3.80 4.47 5.17 5.71 6.44 7.21 9.41 11.47 14.32 16.89 ' 10 0.61 0.98 1.25 1.80 2.35 2.87 3.08 3.71 4.44 5.17 5.95 6.54 7.34 8.15 10.56 12.72 15.72 18.37 25 0.68 1.08 1.36 2.02 2.69 3.33 3.61 4.37 5.28 6.11 6.99 7.68 8.57 9.42 12.11 14.36 17.55 20.28 ' 5 F 22 F[11 F 67 100 0.76 21 33 20 1.52 3.20 4.05 4.46 5.47 6.71 62 8.64 9.49 10 53 11.44 14.57 16.87 20.31 23.11 200 0.79 1.25 1.57 2.45 3.44 4.40 4.89 6.03 7.47 8.41 9.49 10.44 11.56 12.47 15.83 18.12 21.67 24.46 ' 500 0.82 1.30 1.64 2.60 3.73 4.86 5.46 6.80 8.53 9.50 10.66 11.73 12.96 13.87 17.55 19.80 23.46 26.21 1000 0.85 1.34 1.68 2.72 3.96 5.23 5.93 7.44 9.43 10.35 11.58 12.76 14.06 14.97 18.89 21.09 24.83 27.53 ' ' These precipitation frequencyesumates are based on a parbal duration senes. ARI is the Average Recurrence Interval. Please refer m NOAA Alas 14 Document for more information. NOTE. Formatting forces estimates near zero to appear as zero. ' * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) -F- 30 5 60 FT ' (years) min min min min min min hr hr hr hr day day day day [day �y �Y 1 0.45 0.72 0.90 1.23 _ 1.53 1.84 1.96 2.35 2.77 3.16 3.70 4.14 4.73 5.37 7.14 8.87 11.24 13.44 I ` 0.53 0.85 1.06 1.47 1.85 2.22 2.37 2.83 3.34 3.82 4.46 4.96 5.64 6.38 8.43 10.42 13.15 15.68 ' �5 0.61 0.98 1.23 1.75 2.25 2.73 2.92 3.50 4.15 F- 77 5.53 6.09 6.86 7.66 9.95 12.10 15.04 17.69 10 0.67 1.07 1.36 1.97 2.56 3.14 3.37 4.05 4.83 5.51 6.36 6.99 7.82 8.66 11.17F3 41 16.51 19.25 ' 25 0.74 1.17 1.49 2.20 2.93 3.64 3.94 4.76 5.73 6.54 7.47 8.22 9.14 10.02 12.82 15.15 18.44 21.26 50 0.78 1.25 1.58 2.38 3.22 4.04 4.41 5.35 6.47 7.34 8.35 9.19 10.19 11.11 14.14 16.50 19.92 22.80 100 0.82 1.31 1.66 2.53 3.49 4.43 4.87 5.94 7.25 8.17 9.27 10.19 11.26 12.21 15.48 17.85 21.39 24.28 ' 200 -F- .36 1.72 2.68 -F- 0.86 .75 4.82 5.34 -F-- .56 8.06 9.03 10.19 11.22 12.38 13.33 16.86 19.21 22.85 25.73 500 0.90 1.42 1.79 2.84 4.08 5.32 5.96 7.39 9_20 10.21 11.47 12.65 13.91 14.86 18.72 21.04 24.81 27.63 1000 0.93 1.46 1.83 2.97 4.34 5.74 6.50 8.11 10.19 11.15 12.49 13.79 15.14 16.07 20.20 22.46 26.31 29.07 *The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quanble values For a given frequencyare greater than. **These precipitation frequency estimates are based on a Qarbal duration series. ARI is the Average Recurrence Interval. ' Please refer to NOAAAdas 14 Document for more information. NOTE, Formatting prevents estimates near zero to appear as zero, * Lower bound of the 90% confidence interval ' Precipitation Frequency Estimates (inches) T-T-T45 F60 (years) min min min min min min hr Fhr hr hr hr day [day day day day day day MAPS 4 x- 00 A ,ri.r lop 2 i► Ma i 4 x- 00 A ,ri.r lop 2 1 1 1 WET DETENTION POND #13 DESIGN 1 1 1 1 1 1 1 1 1S Pre - Development Sub4 Reach on Link i Post- Dev elopme nt 3P BMP #13 Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type 11 24-hr 1 -year Rainfall = 2.96" Prepared by Microsoft Printed 5/15/2013 ' HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment IS: Pre - Development ' Runoff = 12.87 cfs @ 12.15 hrs, Volume= 1.117 af, Depth= 0.69" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs ' Type II 24 -hr 1 -year Rainfall= 2.96" Area (sf CN Description 843,368 70 Woods, Good, HSG C ' 843,368 100.00% Pervious Area ' Tc Length (min) (feet) Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, ' Subcatchment IS: Pre - Development Hydrograph t14- Runoff 12.87 cfs 13 Type 1 124 -h r ' 12 1 -year Rainfall= 2.96" „ 10 Runoff Area = 843,368 sf ' 9 Runoff Volume =1.117 of 6 Runoff Depth = 0.69" 7 LL Tc =20.0 min 6 57 CN =70 ' 4 3 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ' Time (hours) 1 1 1 1 1 1 1 1 1 Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type 11 24 -hr 1 -year Rainfall = 2.96" Prepared by Microsoft Printed 5/15/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: BMP #13 Inflow Area = 19.361 ac, 49.88% Impervious, Inflow Depth = 1.63" for 1 -year event Inflow = 47.65 cis @ 12.02 hrs, Volume= 2.627 of Outflow = 12.27 cis @ 12.23 hrs, Volume= 1.992 af, Atten= 74 %, Lag= 13.0 min Primary = 12.27 cis @ 12.23 hrs, Volume= 1.992 of Secondary = 0.00 cis @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Peak Elev= 416.63'@ 12.23 hrs Surf.Area= 27,057 sf Storage= 53,091 cf Plug -Flow detention time= 314.0 min calculated for 1.989 of (76% of inflow) Center -of -Mass det. time= 223.1 min (1,049.7 - 826.6 ) Volume Invert Avail.Storage Storage Description #1 414.50' 155,196 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 414.50 21,256 0 0 415.00 24,085 11,335 11,335 416.00 25,887 24,986 36,321 417.00 27,734 26,811 63,132 418.00 29,693 28,714 91,845 419.00 31,661 30,677 122,522 420.00 33,686 32,674 155,196 Device Routing Invert Outlet Devices #1 Primary 410.50' 24.0" Round Culvert L= 48.1' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 410.50'/410.00' S=0.01047 Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 414.50' 2.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 416.00' 36.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 416.33' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 418.35' 60.0' long x 16.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =12.16 cfs @ 12.23 hrs HW= 416.63' (Free Discharge) t = Culvert (Passes 12.16 cfs of 34.27 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0.23 cfs @ 6.86 fps) 3= Orifice /Grate (Orifice Controls 3.26 cfs @ 3.26 fps) = Orifice /Grate (Weir Controls 8.66 cfs @ 1.80 fps) econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 414.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type 11 24 -hr 1 -year Rainfall = 2.96" Prepared by Microsoft Printed 5/15/2013 HydroCADO 10.00 s/n 04927 C 2011 HydroCAD Software Solutions LLC Page 10 Pond 3P: BMP #13 Hydrograph 65 CfS ❑ Inflow 47. Outflow Inflow Area = 19.361 ac L Primary L Secondary 50 Peak Elev= 416.63' 45- Storage= 53,091 cf 40 35 4 30 p 25 LL 20 12.27 cfs 1 11 1 Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type 11 24 -hr 10 -year Rainfall =5.17" Prepared by Microsoft Printed 5/15/2013 ' HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment IS: Pre - Development IRunoff = 45.60 cfs @ 12.14 hrs, Volume= 3.490 af, Depth= 2.16" 1 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs ' Type II 24 -hr 10 -year Rainfall =5.17' Area (sf) CN Description 843,368 70 Woods, Good, HSG C ' 843,368 100.00% Pervious Area ' Tc Length (min) (feet) Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, ' Subcatchment IS: Pre - Development Hydrograph ' Runoff 48 45.60 cfs Type II 24 -hr ' 40 10 -year Rainfall = 5.17" Runoff Area = 843,368 sf 1 32 Runoff Volume =3.490 of 30 26 Runoff Depth= 2.16" 24 Tc =20.0 min 18 CN =70 ' 16 12 1 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1 ' Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type 1124 -hr 10 -year Rainfall = 5.17" Prepared by Microsoft Printed 5/15/2013 ' HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 14 Summary for Pond 3P: BMP #13 ' Inflow Area = 19.361 ac, 49.88% Impervious, Inflow Depth = 3.63" for 10 -year event Inflow 103.36 cfs @ 12.01 hrs, Volume= 5.850 of Outflow = 39.25 cfs @ 12.17 hrs, Volume= 5.204 af, Atten= 62 %, Lag= 9.5 min Primary = 39.25 cfs @ 12.17 hrs, Volume= 5.204 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of ' Routing by Stor -Ind method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Peak Elev= 418.23' @ 12.17 hrs Surf.Area= 30,152 sf Storage= 98,832 cf Plug -Flow detention time= 162.2 min calculated for 5.197 of (89% of inflow) ' Center -of -Mass det. time= 108.9 min ( 912.6 - 803.8 ) 1 1 1 1 1 Volume Invert Avail.Storage Storage Description #1 414.50' 155,196 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store _(feet) (sq -ft) (cubic -feet) (cubic -feet) 414.50 21,256 0 0 415.00 24,085 11,335 11,335 416.00 25,887 24,986 36,321 417.00 27,734 26,811 63,132 418.00 29,693 28,714 91,845 419.00 31,661 30,677 122,522 420.00 33,686 32,674 155,196 Device Routing Invert Outlet Devices #1 Primary 410.50' 24.0" Round Culvert L= 48.1' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 410.50'/410.00' S=0.0104? Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 414.50' 2.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 416.00' 36.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 416.33' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 418.35' 60.0' long x 16.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =39.21 cfs @ 12.17 hrs HW= 418.22' (Free Discharge) t = Culvert (Inlet Controls 39.21 cfs @ 12.48 fps) 2= Orifice /Grate (Passes < 0.31 cfs potential flow) 3= Orifice /Grate (Passes < 6.90 cfs potential flow) = Orifice /Grate (Passes < 105.89 cfs potential flow) econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 414.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type 1124 -hr 10 -year Rainfall = 5.17" Prepared by Microsoft Printed 5/15/2013 HydroCADO 10.00 s/n 04927 0 2011 HydroCAD Software Solutions LLC Page 15 Pond 3P: BMP #13 Hydrograph 103.36 cf s j �_ � ❑ inflow Outflow Inflow Area = 19.361 ac 0 Primary 115 Secondary 105 Peak Elev= 418.23' ' 95- 95 Storage= 98,832 cf 90 85 80 75 70 65 60 55 ,° 50- fq 39.25 cfs 1 ' Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type 1124 -hr 100 -year Rainfall= 7.62" Prepared by Microsoft Printed 5/15/2013 ' HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 1 S: Pre - Development ' Runoff = 88.58 cfs @ 12.13 hrs, Volume= 6.679 af, Depth= 4.14" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs ' Type II 24 -hr 100 -year Rainfall= 7.62" Area (sf CN Description ' 843,368 70 Woods, Good, HSG C 843,368 100.00% Pervious Area 1 1 1 1 1 Tc Length Slope Velocity Capacity Description 20.0 Direct Entry, Subcatchment IS: Pre - Development Hydrograph UO 188. 58 cfs 90 85 Type II 24 -hr 80 75 100 -year Rainfall= 7.62" 70 Runoff Area = 843,368 sf 65 Runoff Volume =6.679 of 60 50 Runoff Depth= 4.14" LL 45 Tc =20.0 min 35 CN =70 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ' Time (hours) 1 p Runoff 1 1 1 1 1 1 Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type// 24 -hr 100 -year Rainfall= 7.62" Prepared by Microsoft Printed 5/15/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: BMP #13 [82] Warning: Early inflow requires earlier time span Inflow Area = 19.361 ac, 49.88% Impervious, Inflow Depth > 5.95" for 100 -year event Inflow = 165.52 cfs @ 12.01 hrs, Volume= 9.605 of Outflow = 132.44 cfs @ 12.08 hrs, Volume= 8.953 af, Atten= 20 %, Lag= 4.3 min Primary = 41.52 cfs @ 12.08 hrs, Volume= 7.652 of Secondary = 90.92 cfs @ 12.08 hrs, Volume= 1.301 of Routing by Stor -Ind method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Peak Elev= 419.04' @ 12.08 hrs Surf.Area= 31,732 sf Storage= 123,634 cf Plug -Flow detention time= 116.4 min calculated for 8.953 of (93% of inflow) Center -of -Mass det. time= 78.6 min ( 869.3 - 790.7 ) Volume Invert Avail.Storage Storage Description #1 414.50' 155,196 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 414.50 21,256 0 0 415.00 24,085 11,335 11,335 416.00 25,887 24,986 36,321 417.00 27,734 26,811 63,132 418.00 29,693 28,714 91,845 419.00 31,661 30,677 122,522 420.00 33,686 32,674 155,196 Device Routing Invert Outlet Devices #1 Primary 410.50' 24.0" Round Culvert L= 48.1' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 410.50'/410.00' S= 0.0104 'P Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 414.50' 2.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 416.00' 36.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 416.33' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 418.35' 60.0' long x 16.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 ' Primary OutFlow Max =41.47 cfs @ 12.08 hrs HW= 419.02' (Free Discharge) L = Culvert (Inlet Controls 41.47 cfs @ 13.20 fps) 2= Orifice /Grate (Passes < 0.34 cfs potential flow) ' 3= Orifice /Grate (Passes < 8.13 cfs potential flow) = Orifice /Grate (Passes < 126.24 cfs potential flow) econdary OutFlow Max =87.24 cfs @ 12.08 hrs HW= 419.02' (Free Discharge) ' = Broad - Crested Rectangular Weir (Weir Controls 87.24 cfs @ 2.19 fps) 1 1 � I � I � I � I � I Briar Chapel - Phase 8 - BMP #13 2013.05.13.Pond #13- Revised Type// 24 -hr 100 -year Rainfall= 7.62 " Prepared by Microsoft Printed 5/15/2013 HydroCADO 10.00 s/n 04927 0 2011 HydroCAD Software Solutions LLC Page 20 N 3 O LL 1 � I � I I I ri � I � I � I I I Pond 3P: BMP #13 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 0 Inflow Outflow ❑ Primary I Secondary 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WATER QUALITY POND #13 CALCULATIONS Project Name Briar Chapel - BC South Pond #13 Project Number 02735 -0092 Date May 17, 2013 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 Date May 17, 2013 Total site area 843,368 square feet = 19.36 acres Impervious areas Draina a area to and Other Drainage Area Existing s Proposed s Change s Existing s Proposed s On -site buildings BUA 0 221,275 221,275 0 0 On -site streets 0 87,204 87,204 0 0 On -site alleys 0 19,513 19,513 0 0 On -site sidewalks 0 21,178 21,178 0 0 On -site future (open space) 0 10,202 10,202 0 0 Off -site streets 0 0 0 0 0 5% Contingency 0 17,969 17,969 0 0 Linear Park Impervious 0 43,317 43,317 0 0 Total Impervious 0 420,658 420,658 0 0 Non-impervious areas Draina a area to and Other Drainage Area Existing s Proposed s Change s Existing s Proposed [Sfl On -site grass/landscape 0 422,710 422,710 0 0 On -site woods 732,077 0 - 732,077 0 0 Other undeveloped 0 0 1 0 0 0 Total off -site non-impervious 0 0 0 0 0 Total non-impervious 732 077 422 710 -309,367 0 0 Total Drainage Area 843,368 843,368 0 3,167 850 3,167,850 Percent Impervious 0.0 49.9 49.9 1 0.0 0.0 Notes: 2013.05#13- Additional Area Added Don.xls Site Drainage Area Data Page 2 of 17 Printed 5/16/2013 7:12 AM Water Quality Pond Surface Area Calculations Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 ' Date May 17, 2013 Total on -site drainage area to pond 843,368 square feet Total impervious area in drainage area 420,658 square feet Average water depth of basin at normal pool 4.0 feet Location of site Chatham County ' Site region Piedmont % Impervious cover 49.9 percent ' If the site is in a coastal area, will a vegetative filter be used? n/a 1 1 1 1 1 1 1 1 1 1 Surface Area/Drainage Area Ratios: For a site in the Piedmont (85 %) 1.7 percent For a site in the Piedmont (90 %) 2.5 percent For a site in a Coastal County w/ Vegetative Filter 3.3 percent For a site in a Coastal County w/out Vegetative Filter 4.3 percent Required surface area of pond: For a site in the Piedmont (85 %) 14,560.0 square feet For a site in the Piedmont (90 %) 21,040.0 square feet For a site in a Coastal County w/ Vegetative Filter 27,760.0 square feet For a site in a Coastal County w /out Vegetative Filter 36,190.0 square feet Notes: 2013.05#13- Additional Area Added Don.xls Pond Surface Area Calcs Page 3 of 17 Printed 5/16/2013 7:12 AM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 Date May 17, 2013 Drainage area 843,368 square feet Impervious area 420,658 square feet Rainfall depth 1.00 inches Percent Impervious 49.9 percent R(v) =0.05 +0.009 *(Percent impervious) Runoff coefficient - R(v) 0.50 in /in Runoff volume = (Design rainfall) *(R(v)) *(Drainage area) Runoff volume 35,063.4 cubic feet Notes: 2013.05#13- Additional Area Added Don.xls Runoff Volume Calcs Page 4 of 17 Printed 5/16/2013 7:12 AM 1 1 1 1 1 Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Temporary Pool Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 Date May 17, 2013 Contour ID Stage Area . ft. Area acres Incremental Area ft Incremental Area acres Incremental volume cu ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 414.5 0 21,256.0 0.488 21,2560 05 00 0.0 00 00 415 05 24,084.9 0.553 2,8289 0 1 11 335.2 03 11,335.2 03 416 15 25,887.0 0 594 1,8021 0.0 24,9859 06 36,3212 08 417 2.5 27 734.0 0.637 18470 00 26,8105 0.6 63,1317 12 418 35 29,693.0 0 682 1,9590 0.0 28,7135 07 91,8452 1 3 419 45 31,661.0 0 727 1,9680 00 30 677.0 07 122,5222 1.4 420 55 336859 0 773 2,0249 0.0 32,6734 08 155 195.6 15 2013.05#13 - Additional Area Added Don As ' Stage Storage (Temp Pool) Page 5 of 17 Printed 5/16/2013 7 12 AM 1 1 1 Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Permanent Pool Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 Date May 17, 2013 Contour ID Stage Area ft Area acres Incremental Area ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft lume u ft :7j736 mulative Cumulative volume acre -ft 408 0 6,973.9 0 160 6,9739 02 00 00 00 0.0 409 1 8,4980 0 195 1,524.1 00 717360 0 2 0 0.2 410 2 10,1170 0 232 1,6190 0.0 9,307.5 0.2 17,0435 04 411 3 11,8880 0 273 1,7710 00 11 0025 03 28,046 0 05 412 4 13,789.0 0 317 19010 00 12,8385 03 40,8845 05 413 5 15,820.0 0.363 2,031.0 00 14,8045 03 55,6890 06 414 6 17,980.0 0 413 2,1600 0 0 16,9000 0.4 72,5890 07 414.5 6.5 212560 0 488 3 276 0 01 9,8090 0 2 82 398.0 0.6 2013.05#13 - Additional Area Added Don.xls Stage Storage (Perm Pool) Page 6 of 17 Printed 5/16/2013 7.12 AM 1 1 p 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Forebays Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 Date May 17, 2013 Contour ID Stage Area ft. Area acres Incremental Area . ft Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre -ft 408 0 8440 0019 8440 00 00 00 00 00 409 1 1,2490 0 029 405.0 00 1,0465 0 0 1,0465 0 0 410 2 1,7250 0 040 4760 00 1,4870 0 0 2,5335 0 1 411 3 2,2680 0 052 5430 00 1,9965 00 4,5300 01 412 4 2,880.0 0.066 6120 00 2 574 0 01 7,1040 0.1 413 5 3,557.0 0.082 6770 0.0 3,M.5 0.1 10,322.5 0.1 414 6 4,300.0 0 099 7430 0.0 3,9285 0 1 14 251.0 02 414.5 65 5,680.0 0 130 1,3800 0.0 2,4950 0.1 16,7460 0.1 2013 05#13 - Additional Area Added Don.xls ' Stage Storage (Forebays) Page 7 of 17 Printed 5/16/2013 7 12 AM 1 1 1 1 1 1 1 1 1 1 Water Quality Basin Dewatering Time Calculations Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 Date Mav 17. 2013 Maximum surface area of basin 25,887 square feet Maximum head of water above dewatering hole 0.50 feet Orifice coefficient 0.60 Diameter of each hole 2.5 inches Number of holes 1 Cross sectional area of each hole = 0.034 square feet Cross sectional area of each hole = 4.9 square inches Cross sectional area of dewatering hole(s) = 0.034 square feet Cross sectional area of dewatering hole(s) = 4.9 square inches Dewatering time for basin = 62.0 hours Dewatering time for basin = 2.58 days Notes: 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Summary Information Project Briar Chapel - BC South Pond #13 Project No. 02735 -0092 Date May 17, 2013 Drainage area to pond 843,368 square feet= 19.36 acres Impervious area in drainage area 420,658 square feet = 9.66 acres Bottom of pond elevation 408.00 feet Normal pool elevation 414.50 feet Pond volume at normal pool 82,398 cubic feet Required volume for design rainfall 35,063 cubic feet Required surface area for pond 21,040 square feet Volume provided for storage of design rainfall = 36,321 cubic feet at elevation Surface area provided at normal pool 21,256 square feet 2013.05#13- Additional Area Added Don.xls Summary Data Page 9 of 17 416 Printed 5/16/2013 7:12 AM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ,TE: 5/17/2013 D BY: rRVJGIi 1 IYMIYIG. Gila! %0[lapul - Midbu O rRVJCIr 1 IVV. Lo ManCu OT PROJECT LOCATION: Chatham County, NC 02735 -0092 GCA Storm Outlet Structure Structure= BMP #13 Out Quo / Qfull = 1.70 Size= 24 in VNfull = MAX Quo = 39.25 cfs V = #VALUE! fps Qfull = 23.03 cfs Vfull = 7.33 fps From Fig. 8.06.b.1: Zone = 6 D50 = 14 in DMAx = 21 in Riprap Class = 2 Apron Thickness = 36 in Apron Length = 20.0 ft Length Apron Width = 3 x Dia = 6.0 ft (PROJECT LOCATION: Chatham Countv. NC Pond Name= BMP #13 Riser Outer Width = 5 ft Riser Outer Length = 5 ft Riser Inner Width = 4 ft Riser Inner Length = 4 ft Riser Height = 6.33 ft Concrete Base Length = 7 ft Concrete Base Width = 7 ft Concrete Base Depth = 18 in DATE: 5/17/2013 02735 -0092 Riser Resisting Force = Base Resisting Force = Total Resisting Force = Riser Buoyant Force = Base Buoyant Force = Total Buoyant Force = Factor of Safety DESIGNED BY: GCA 8,546 lb 11,025 lb 19,571 lb 9,875 lb 4,586 lb 14,461 lb 1.35 Design Acceptable 10 mm ,-� an 4D 'M a J7 —L <7 A Rz ILI, �M, J 114A'1� 4 0 /In" § V. I 'wli ga" A if r •� NORTH 150' 0 150' 300' 1 0 SCALE 1"=150' (Horiz.) -v LL 44- -- — — — — — — — — — j, I LEGEND: 7 p MCE PROD. # DRAINAGE AREA FOR PERMANENT DEVICES DRAWN GCA DRAINAGE AREA FOR GCA CHECKED TEMPORARY DEVICES . ... . h CHS APPROVED DEVICES BMP #13 DEVICES PLANNED IN CURRENT PHASE BMP #15 DEVICES PLANNED FOR FUTURE CONSTRUCTION TEMPORARY DEVICES TO BE REMOVED NA ........................... ........... .......... on"V ...... ................. ........... ............ ... ....... ........ ... ................. ................. ... ................. Tim 1o;1 M.M ..... . .......................... MISS— lo;e ....... ......... ................ ............ I ...... .............. oe Imago, 1 " ............ ....... ,g X, o, ....................... ............................. ......................................... .......... I ........................ iI ....................................... ............................. I ....... .......... ........................... .............................. mmHg ................................... ................................ .............. ****'* .......... ............ ......... ....... .................. 41 . . ..... .................. .......... ........... .................. ................................... ............................ All V..................................... ............... I ..................... rk ........... ................... .............. ... ........ .... 6 .......... ............. ............. I .......... 3 ............... ..................... ........ ....... ............. I ....................... ..................................... .............. ............... .............................. 'b JI�A V-1 1010 ...... ............ ....... . .............. ............................. ....................... "a Q . .............................. L IN 1 .............................. "Afll .................................. ........................... 6 A 411 .......... .................. V MIA a 10 .......... ............. . ............................ 0 f ............. f ........... ....... -A "a .................................. 1M............................................ ............ p-alqg ............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......................... .......... so A SECTION 2 V U U ...... ------ ------ ------ ------ 19.4 A 14 - L Dbb 6 A 10- E2 BIVIP #13 w odl J r 3 q k � All,�� L 4/ C), b (t." E c IIIA 01 3 SUBMITTAL TO DWO 401 UNIT FOR PHASE 8 PROJECT 2013.05.21 2 SUBMITTAL TO DWQ 401 UNIT FOR PHASE 7 PROJECT 2013.01.24 1 SUBMITTAL 70 DWQ 401 UNIT FOR GREAT RIDGE PARKWAY EXTENSION PROJECT 2012.1219 REV.NO. DESCRIPTIONS DATE REVISIONS V qtr , �gclk Alft, 411 ROAD B PE ROAD A R, p=M 1—�� /-�Z, • - /t AC 9/ 7A A.., b A' L 6 ie, oil );i k Lgo A N" .. ..... . r rL) L J B, g"i L 5. Q u "J11 N", J, Lk 9 01 T. L M sa . . . . . . . . . . . . . . . . . . \N off F, JIZ Lj V J 9p T RE F" Vh X. pp SEAL v���&cxEID 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com `- TM HAPEL by Newland COMMUM-nES 7 BRIAR CHAPEL GREAT RIDGE PARKWAY EXTENSION CHATHAM COUNTY, NORTH CAROLINA DATE: DECEMBER 19, 2012 MCE PROD. # 02735-0080 DRAWN GCA DESIGNED GCA CHECKED CHS PROD. MGR. CHS SCALE HORIZONTAL: 1" = 150' VERTICAL: N/A MILCFILE NUMBER DA MAP 1 STATUS: REVISION FOR PERMIT ONLY 3 FUTURE DEVELOPMENT--,,, JP 'r ii 9 9 3 -3 3 4, '�9 3 3)'( 07 1( ( 6 90\ 110 h3 � I 1104 60 fO 02 9 4 8) 9 8 n �954 (,,96 4 )(99), _7 )_9 �4 / /--PHASE 7 X97 4 ;� , 4 ,�`` (950; DEVELOPMENT AREA 9 5 2) LEES) 9'7' )811 N"� COMMON SPACE 2, OA Z' 0 0 �74 967 INN 9 j y 969� 4 i, 99-1 9 7 0,'v- 9 2 X994 9 9 5k to ��99 6 9� 97 9 Q_ 8), 999./ 10 SEAL' CARO ......... ... 029419 Q C2 411 7 5, N 0 3/ 1064 026)-. V117 xor /0 1130 1129 1128 1127 F-1- 11181 1119 1 1117), 1 (911811811(9 11 8 11 PHASE 7_-_`--- DEVELOPMENT A r-% r- A ROAD B I 0 441 5 rl 1 1147) 1046�\� V \ 114 V A h 'JAY ts — 013D_ 1-2.-7 AIL N140m & CT= 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F -1222 www.mckimcreed.com U11 I FUTURE DEVELOPMENT till CHAPEL * m IF Newland eommumms BRIAR CHAPEL PHASE • CHATHAM COUNTY, NORTH CAROLINA DATE: MIN MAY 21, 2013 MCE PROS. # 02735-0092 DRAWN GCA DESIGNED GCA CHECKED CHS PROS. MGR. CHS SCALE M&C FILE NUMBER CR101 HORIZONTAL; DRAWING NUMBER 1" = 50, VERTICAL: C 1 • 0 N/A 7STATUS; REVISION 04 FINAL DRAWINGS FOR REVIEW PURPOSES ONLY ` Cl -8 -129 ' 3 ; SDMH -8 -127 REPLACE EX. DBL Cl WITH S HAH SELF INSPECTION NOTICE: GENERAL NOTES: NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL 1. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED TEMPORARY CONSTRUCRON SELF- INSPECTION PROGRAM: BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL N011FY _ ENTRANCE - - -�__ OWNER IF ANY DISCREPANCIES EXIST PRIOR TO CONSTRUCTION. NO ADDITIONAL t `^., - THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE FUTURE DEVELOPMENT `.� COMPENSATION WILL BE PAID TO CONTRACTOR FOR ANY WORK DONE DUE TO \ r '""� THAT PERSONS RESPONSIBLE FOR LAND - DISTURBING ACTIVITIES INSPECT A DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE NOTIFICATION HAS NOT BEEN GIVEN. APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. O �` i ` `� RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT 2. CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL AT 1- 800 - 632 -4949 ��o 1_8_113 OCTOBER 1, 2010. THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO QOQ�., `�` ® CI-8-114 \ �``�- ` \ `1 WEEKLY SELF - MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT ANY LOCAL O O \ C1_8_ ``-� \ �, '"- CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF - INSPECTION REPORT IS THE UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NORTH 4 0 INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL � .- CAROLINA ONE CALL ". MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL 3. OVERHEAD ELECTRIC LINES MAY EXIST ON THE SITE. CONTRACTOR SHALL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS _ CONTACT DUKE POWER AT (336) 634 -4633 PRIOR TO COMMENCING AIJ:Y 113A -54.1 AND 15A NCAC 48.0131. THE SELF INSPECTION REPORT FORM IS ACTIVITY WITHIN 200 -FT OF DUKE POWER RIGHT OF WAY. AVAILABLE AS AN EXCEL SPREADSHEET FROM ( HTTP: //W'WW.DLR.ENR. STATE. NC. US /PAGES/SEDIMENTATION_NEW.HTML. IF YOU HAVE R 00 4. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL ARRANGE AND ATTEND A \ ao �-�._ QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT A N OWNER AND ENGINEER. Cl -8 -128 C1 -8 -115 PRECONSTRUCTION CONFERENCE WITH CHATHAM COUNTY, . I /� �--- -. - -�-... i I (919} 791 -4200. PUBLIC STO M -- . , \ DRAINAGE EASEMENT \ -= i ' �� `+ 5. EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE GROUN D ,ARE BASED ON BEST AVAILABLE RECORD DRAWINGS. OESD- 8 -112A CI -8 -115 6. SOIL UNDER BUILDINGS, PAVED AREAS AND WITHIN SLOPES GREATER THAN 3:1 ® � f (H: V) SHALL BE APPROVED, PLACED AND COMPACTED AS RECOMMENDED BY THE ` GEOTECHNICAL ENGINEER. THESE SOILS SHALL BE COMPACTED TO THE STANDARD CJ -8 -112 ' �. SILT FENCE (TYP) 4' HOA EASEMENT .�. -� � ,� , PROCTOR MAXIMUM DRY DENSITY UNLESS OTHERWISE RECOMMENDED BY THE I (TYP.) \ GEOTECHNICAL ENGINEER. j C/_8_ 111 I �\ 7. ALL GRADED AREAS SHALL BE SLOPED SUCH THAT NO AREAS OF STANDING J � •.� � WATER OCCUR AND ALL AREAS POSITIVELY DRAIN TO DRAINAGE STRUCTURES, ( I / 4 PRIVATE UTILITY EASEMENT .�(TYP•) ` � \�\,� SWALES OR STORMWATER MANAGEMENT FACILITIES. 8. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS AND h ! CI -8 -107/ I 50 CHATHAM COUNTY SHALL REPLACE ALL MARKERS REMOVED IF DAMAGED DURING CONSTRUCTION. BLOCK AND GRAVEL INLET ,` / / l ��\'` / STREAM BUFFER PROTECTION (TYP) 1. /' ! \ CI -8 -104 - \ 9. CONTRACTOR IS RESPONSIBLE FOR ALL DEWATERING AS NECESSARY / �� ' 10' CHATHAM COUNTY, l THROUGHOUT CONSTRUCTION. !� NO -BUILD BUFFER TYP. , f �y 10. CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL PERMIT CONDITIONS, ! ��\ ` MONITORING AND REPORTING REQUIREMENTS. CI -8 -109 �� � ! , 11. REFER TO SHEET D -1 FOR PROPOSED ROAD CROSS SECTION DETAILS AND Cl -8_ 17 ,A \�` / R ® PAVEMENT SCHEDULE. 0-8 -10$ o° f r ?�"�!d' " 12. ALLEYS ARE LOCATED INSIDE 20' PRIVATE EASEMENTS. ALL OTHER STREETS FUTURE DEVELOPMENT `� WITHIN PHASE 6 SOUTH ARE INSIDE 40' PUBLIC RIGHT -OF -WAYS. EACH BIFURCATED PORTION OF BRIAR CHAPEL PARKWAY IS WITHIN A 41' PUBLIC RIGHT - OF - WAY. UNBIFURCATED PORTION OF BRI A R CH APEL PARKWAY 15 WITHIN A 50` PUBLIC RIGHT -OF -WAY. u - _ TREE PROTECTION FENCE •' ` 13. GRADING AT END OF ALLEYS SHALL TIE INTO EXISTING SLOPES AT NO STEEPER (Ty'.) „ � �\ ` THAN 2 :1 (H: V) UNTIL FINAL LOT GRADING. 14. STREAM A N O / �\ 20' PRIVATE WETLAND LOCATIONS ARE BASED ON DELINEATIONS PROVIDED BY I o \ \ D w /' DRAIN GE A EMENT �, \' - \t � SOIL AND ENVIRONMENTAL CONSULTANTS IN RALEIGH, NC CONTACT SEAN ^j / ` CLARK AT 919 - 846 -5900. z ( ' C -8-118C B -8 -1 8 CB- 8 -118A \ C1 -8 -103 �s� O - - - - - - - - 15. A PORTION OF THIS PROPERTY IS LOCATED IN SPECIAL FLOOD HAZARD AREA PHASE 8 PROJECT LIMITS t " ARY } I t AE AS SHOWN ON FEMA FIRM MA #3710976 �OOJ DATED FEBRU 2, 2007. (TYP) y _ 495 \ 50 - - - - INFRASTRUCTURE AS SHOWN MAY BE UNDER CONSTRUCTION AND SHALL o \ n,a 16. EXISTING INFRAST UG / PROTECT 8 SANITARY. o - 20' PUBLIC \ BE FIELD VERIFIED BY CONTRACTOR. REFER TO THE FOLLOWING JOHN R. _ / SEWER, FOR C MAIN D CNN - - .I � DRAINAGE EASEMENT 8 -118 \ MCADAMS BRIAR CHAPEL PLANS AND CONSTRUCTION BULLETINS FOR N I \ �� ADDITIONAL INFORMATION: Y o o I ---503 L501 -505--7 - RECLAMATION FACILITY EROSION CONTROL PLAN, SEALED JULY 29, 2005 -PHASE 1 CONSTRUCTION PLANS, SEALED OCT 21, 2005. -WEST EXTENSION GRADING PLAN (INTERIM), SEALED MAR 1, 2007. LEGEND. I 495 \ \ G, -PHASE 3 CONSTRUCTION PLANS, SEALED DEC 4, 2006. \� �\ -PHASE 4 CONSTRUCTION PLANS, SEALED JAN 15, 2007. TEMPORARY CONSTRUCTION I I u 505 503 500 498 -WATER QUALITY PONDS 5 AND 6 CONSTRUCTION PLANS, SEALED AUG 24, 2006. O ' ( ° ENTRANCE 490 / -PUMP STATION CONSTRUCTION PLANS, DATED APR 3, 2006. I CI-6 -125 \, ' -PHASE 4 - POD D CONSTRUCTION PLANS, SEALED SEP 17, 2007. i -PHASE 3 & 4 EROSION CONTROL PLANS, SEALED JULY 26, 2007. RIPRAP OUTLET PROTECTION ci -8- a I J t 4 .- , � J ✓ g \ r 17. BEFORE STARTING ANY CONSTRUCTION OF IMPROVEMENTS WITHIN ANY NCDOT ' \ . STREET OR HIGHWAY RIGHT -OF -WAY, CONTACT NCDOT DISTRICT OFFICE AND _SF SILT FENCE - - CJ -8 -102 OBTAIN ALL PERMITS AND ENCROACHMENTS AND KEEP COPIES ON CONSTRUCTION IL u� o 1� + SITE AT ALL TIMES. ALSO CONTACT NCDOT DISTRICT OFFCE 24 HOURS IN TPF TREE PROTECTION FENCE cs RoA -s_­, S CTIO 2 - \ ADVANCE BEFORE PLACING CURB AND GUTTER AT (336) 629 -1423. EXISTING CONTOUR ;. {2T B, 40� Llc Rtw _ �3� I 11 1 - �-. - _ STORM DRAINAGE NOTES: 1\ r - - - - - - - - - - ' Cl 8 120 \ \ N 535 PROPOSED CONTOUR - - -, -_.� C!- -1 1 C1 1. STORM DRAINAGE PIPES SHALL BE: PROJECT LIMITS P RIGHT-OF-WAY OR v � � RCP /CLASS III FOR STORM DRAINAGE INSIDE PUBLIC . ,j HARDWARD CLOTH & GRAVEL Z.. EX. C! -19b" �.; 485 \ CONNECTING INTO STRUCTURE INSIDE PUBLIC RIGHT -OF -WAY IN ACCORDANCE INLET PROTECTION I \ „w �' \ ��� NTH NCDOT STANDARDS. a. 505 502 499 4-?6 A -2000 PVC FOR PRIVATE STORM LINES WITHIN PRIVATE ALLEYS. ALL STORM DRAINAGE CONSTRUCTION FOR A -2000 PVC SHALL BE IN ACCORDANCE WITH I i U, r PIPE MANUFACTURER'S SPECIFICATIONS. PIPE JOINTS SHALL BE WATERTIGHT PER a cp -CJ -8 -101 Nr z _ � ASTM D3212. PIPE AND FITTINGS SHALL BE INSTALLED PER AASHTO SECTION 30 ° 20' PRIVATE ° \ \ AND AASHTO SECTION 12. I Q > W ( DRAINAGE EASE NT ° \ 2. ALL CONCRETE SHALL MEET A MINIMUM 3,000 PSI COMPRESSIVE STRENGTH. s cB -8 -1268 = CB -8 -1260 497 4� ----- 8 -126A ;, \ WALL. 3, ALL PIPE IN STORM DRAIN STRUCTURES SHALL BE STRUCK EVEN WITH INSIDE l -- - - -- - -- - -- o f /�� 03 x- i 3 w v, to 5 - ,r � °; ..•' ` 1 ° ,1' 'o 4• THE INTERIOR SURFACES OF ALL STORM DRAINAGE STRUCTURES SHALL BE 0. - - - - - - _ - - - - - - - - - - - ¢' 480 POINTED UP AND SMOOTHED TO AN ACCEPTABLE STANDARD USING MORTAR 1 � °- r. - , 490 , . , 456 4� MIXED TO MANUFACTURER'S SPECIFICATIONS. - A R R \ , 5. ALL BACKFILL SHALL BE NON PLASTIC IN NATURE, FREE M ROOTS FROM c„ 1 1 C! 8 - V EGETATIO N MA TTE R , WASTE CONSTRUCTION MATE R I A L O R OTHE R OBJ E,10NABLE 29 PUBLIC MATERIAL. UTILIZED MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY I� o DRAINAGE SEMENT c `'' °° MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A 1 PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. � 1 1 6. MATERIALS DEEMED AS UNSUITABLE FOR BACKFILL PURPOSES BY THE OWNER'S lJ 502 498 414 491 487 tl v+ � � REPRESENTATIVE SHALL BE REMOVED AND REPLACED W�iIH SUITABLE MATERIAL. ,,, o � - ca �• _ � .._ 7. BACKFlLLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER P,PE IS v w LAID. THE FILL AROUND THE PIPE SHALL BE THOROUGHLY COMPACTED TO 95% Cl- 14 t OF THE MAXIMUM DRY DENSITY OBTAINABLE WITH THE STANDARD PROCTOR TEST. i _.. e >� - _ R _ - - PAC TO 100% STANDARD PROCTOR. •. THE TOP EIGHT 8 INCHES SHALL BE COMPACTED , t '� ® 8. UNDER NO CIRCUMSTANCES SHALL WATER BE ALLOWED TO RISE IN .�•, �_ �--/ v UNBACKFlLLED TRENCHES AFTER PIPE HAS BEEN PLACED. ROAD R EX. CI-118--, - 9, ALL FLARED END SECTIONS DISCHARGING INTO WATER QUALITY PONDS WILL HAVE (27'8-B, 40' PUBLIC Rita) A CONCRETE PAD POURED UNDERNEATH THE FLARED END SECTION IN LttRCLVEQVVIjtj PHASE 7 CONSTRUCTION PLANS ACCORDANCE WITH PROVIDED CONSTRUCTION DETAILS. 10. RIM ELEVATIONS OF STORM DRAIN STRUCTURES SHALL BE FIELD VERIFIED. 1 11, RIM ELEVATIONS FOR GRATE INLETS WITHIN ALLEYS SHALL MATCH INITIAL LIFT OF BINDER COURSE. AT 11ME OF FINAL SURFACE LIFT OF ASPHALT, CONTRACTOR p - SHALL RAISE GRATE INLET TOPS TO MATCH FLUSH WITH FINAL SURFACE PAVEMENT ELEVATION. � o 12. STORM DRAINAGE WITHIN PRIVATE EASEMENTS TO BE OWNED, OPERATED AND t Ir MAINTAINED BY HOME OWNER'S ASSOCIATION OR AGENT THEREOF. 13. LENGTHS SHOWN FOR STORM DRAINAGE PIPES ARE MEASURED FROM CENTER OF O STORM STRUCTURES AND TO ENDS OF FLARED END SECTIONS. SLOPES CALCULATED ARE BASED ON THIS LENGTH. r 1 14. CB DENOTES CATCH BASINS TO BE INSTALLED IN THE CENTERS OF PAVED ALLEYS AND NON -PAVED AREAS. REFER TO NCDOT DETAILS 840.19 FIND 840.22 I ON SHEET D -3, t l 15. Cl DENOTES CURB INLETS TO BE INSTALLED IN THE CURB LINES OF ROADWAYS. I v REFER TO NCDOT DETAILS 840.02 AND 840.03 ON SHEET D -3. I 4 , SCALE: 1"=50' (Horiz.) SEAL 1 1ST SUBMITTAL TO REVIEW AGENCIES 1 2013.05.2'_ REVAO, I DESCRIPTIONS I DA i E 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233 -8091, Fax: (919)233 -8031 F -1222 www.mckimcreed.com l ,I moil, 71 TM s' A NF CHAPEL i E Newland commumms CONSTRUCTION SEQUENCE: 1. THE INTENT OF THE CONSTRUCTION SEQUENCE IS TO PROVIDE THE CONTRACTOR WITH A GENERAL GUIDE FOR CONSTRUCTION PURPOSES. THIS SEQUENCE IS NOT INTENDED TO OUTLINE ALL CONSTRUCTION ACTIVITIES ON THIS PROJECT. 1 ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. 3. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER RAINFALL EVENTS. NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. 4. IF IT IS DETERMINED DURING CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE, DESPITE PROPER IMPLEMENTATION AND MAINTENANCE, THE CONTRACTOR IS OBLIGATED TO TAKE ADDITIONAL CORRECTIVE ACTION. CONTACT OWNER'S REPRESENTATIVE AND ENGINEER WITH ANY ADDITIONAL MEASURES NEEDED. 5. CONTRACTOR SHALL ESTABLISH GROUNDCOVER ON DISTURBED AREAS WITHIN THE NUMBER OF CALENDAR DAYS AFTER COMPLETION OF GRADING PER THE SCHEDULE BELOW: GRADUAL SLOPES: (14) CALENDAR DAYS MODERATE SLOPES: (10) CALENDAR DAYS STEEP SLOPES: (7) CALENDAR DAYS 6. SLOPES ARE AS DEFINED IN THE CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. 7. CONTRACTOR SHALL ARRANGE PRE - CONSTRUCTION MEETING WITH THE OWNER'S REPRESENTATIVE, ENGINEER AND CHATHAM COUNTY. 8. OBTAIN LETTER OF PLAN APPROVAL FOR SEDIMENTATION AND EROSION CONTROL FROM CHATHAM COUNTY SOIL EROSION & SEDIMENTATION CONTROL, 9. CONTRACTOR TO POST EROSION CONTROL PERMIT PROMINENTLY ON SITE AT ALL TIMES. 10. CONTRACTOR TO VERIFY LOCATION AND DEPTH OF EXISTING UTILITIES TO AVOID CONFLICT DURING INSTALLATION OF EROSION CONTROL MEASURES AND STORM DRAINAGE. CONTRACTOR IS TO CALL 1- 800 - 632 -4949 FOR "NC ONE CALL" TO HAVE UTILITIES LOCATED, 11. CONTRACTOR TO HAVE A PROFESSIONAL LAND SURVEYOR FLAG PROPERTY LINES, EASEMENTS, LANDSCAPE BUFFERS, STREAM BUFFERS, TREE PROTECTION AREAS AND LIMITS OF DISTURBANCE. 12, INSTALL TEMPORARY CONSTRUC71ON ENTRANCE, 13. INSTALL TREE PROTECTION AND SILT FENCING AS SHOWN AND DETAILED ON PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. 14. INSTALL INLET PROTECTION DEVICES AS DETAILED IN THESE PLANS ON EXISTING STRUCTURES ALONG BRIAR CHAPEL PARKWAY. 15. CONSTRUCT TEMPORARY SKIMMER SEDIMENT BASINS TO THE REQUIRED DIMENSIONS AND ELEVATIONS AS DETAILED IN THESE PLANS. CLEAR ONLY AS NECESSARY TO INSTALL THE BASINS, INSTALL BAFFLES PER PLAN, SEED AND MULCH SIDE SLOPES OF SEDIMENT BASINS UPON COMPLETION. INSTALL BIODEGRADABLE MATTING ON SIDE SLOPES OF BASINS IF NECESSARY TO ESTABLISH COVER. 16. CONSTRUCT TEMPORARY DIVERSION DITCHES AS SHOWN AND DETAILED IN THESE PLANS. SEED, MULCH AND INSTALL REQUIRED LINERS IN THESE DITCHES. INSTALL CHECK DAMS IN DITCHES AS SHOWN AND DETAILED ON PLANS. CLEAR ONLY AS NECESSARY TO INSTALL THESE EROSION CONTROL MEASURES. 17. CONTACT CHATHAM COUNTY SOIL EROSION & SEDIMENTATION AT 919- 545 -8339 AND ENGINEER UPON COMPLETION OF INITIAL EROSION CONTROL MEASURES. 18. ONCE CHATHAM COUNTY HAS APPROVED THESE MEASURES, THE CONTRACTOR SHALL BEGIN CLEARING AND GRUBBING WITHIN THE LIMITS OF DISTURBANCE FOR SECTION 1. 19. THE CONTRACTOR SHALL REMOVE ALL FOOT MATTER AND ORGANICS FROM WITHIN THE CLEARING LIMITS. 20, THE CONTRACTOR SHALL BEGIN STRIPPING TOPSOIL. STOCKPILE TOPSOIL AT LOCATION DIRECTED BY OWNER. 21. BEGIN GRADING OPERATIONS. 22. MAINTAIN AND PROTECT ALL EXISTING UTILITIES AT ALL TIMES. 23. CONTRACTOR IS TO MAINTAIN ALL THE DIVERSION DITCHES, BASINS, SILT FENCE AND OTHER EROSION CONTROL MEASURES UNTIL THEY ARE APPROVED TO BE REMOVED. 24.INSTALL STORM SEWER PIPE AND SANITARY SEWER PIPE AS SHOWN ON PLANS WITH EROSION CONTROL MEASURES TO ELIMINATE SILT FROM ENTERING STORM PIPE SYSTEM. 25. AS FINAL GRADES AND SLOPES ARE ESTABLISHED, THE CONTRACTOR SHALL SEED, MULCH AND INSTALL ROLLED EROSION CONTROL PRODUCTS ON SLOPES GREATER THAN 10 FEET IN HEIGHT. 26.IF STANDING WATER OCCURS AND IS NOT ABLE TO BE DRAINED TO ESTABLISHED EROSION CONTROL MEASURES, CONTRACTOR SHALL PUMP WATER TO DIRECT TO NEAREST EROSION CONTROL MEASURE. 27. CONTINUE WITH GRADING OPERATIONS FOR STREETS AND RESIDENTIAL LOTS, 28, AFTER SECTION 1 IS STABILIZED, GRADING OPERATIONS CAN OCCUR WITHIN SECTION 2. AND AFTER SECTION 2 IS STABILIZED, GRADING OPERATIONS CAN OCCUR WITHIN SECTION 3. 29.INSTALL ANY REMAINING STORM SEWER PIPE AND UNDERGROUND UTILITIES, 30.ONCE STORM DRAIN SYSTEM IS OPERATIONAL TO CONVEY RUNOFF TO TEMPORARY SKIMMER SEDIMENT BASIN #6 AND CONTRIBUTING AREA HAS ESTABLISHED GROUNDCOVER, WITH APPROVAL FROM CHATHAM COUNTY, REMOVE BAFFLES, SKIMMER AND MUCK OUT SEDIMENT AND CONVERT TO FINAL BMP #9. 31. COMPLETE CONSTRUCTION OF ROAD BEDS AND SHOULDERS. INSTALL ABC STONE IN ROAD BEDS AND CURB AND GUTTER. 32ANSTALL INITIAL PAVING AS SHOWN ON PLANS. 33. CARRY OUT FINAL GRADING. RESPREAD TOPSOIL IN ACCORDANCE WITH PROJECT SPECIFICATIONS. 34. PERFORM SEEDING AND MULCHING AS REQUIRED IN ACCORDANCE WITH THE PLANS. 35.ONCE GROUNDCOVER HAS BEEN ESTABLISHED AND OTHER CONSTRUCTION IS COMPLETE, CONTACT CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION AND ENGINEER FOR SITE INSPECTION BEFORE REMOVING ANY TEMPORARY EROSION CONTROL MEASURES. 36. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AS NEEDED TO INSTALL FINAL PAVING. 37, INSTALL FINAL PAVING AS SHOWN ON THE PLANS. 38. AFTER PROJECT AREA IS COMPLETELY STABILIZED, REMOVE ALL TEMPORARY MEASURES AND INSTALL PERMANENT VEGETATION AS REQUIRED AND ON ANY RESULTING BARE AREAS, LIMITS OF DISTURBANCE NOTES: 1, LIMITS OF DISTURBANCE LINES ARE CLEARING LIMIT LINES WHICH WILL BE FLAGGED FOR A MINIMUM OF ONE PER 50 -FT OR CLOSER DEPENDING ON VISIBILITY. 2, SILT FENCE AND TREE PROTECTION FENCE LINES ALSO DELINEATE THE LIMITS OF DISTURBANCE. ALL SILT FENCING OR TREE PROTECTION FENCING SHALL BE INSTALLED INSIDE LIMITS OF DISTURBANCE. 3. TOTAL DISTURBED AREA: 24.7 ACRES i SDI*] Mal DATE: MAY 21, 2013 MCE PRO]. # 02735 -0092 DRAWN GCA DESIGNED GCA CHECKED CHS PRO], MGR, CHS SCALE M &C FILE NUMBER CR103 HORIZONTAL: DRAINING NUMBER 1 " =50' VERTICAL: C3.2 N/A STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY LEGEND: c) 0 Q 0 Q 0 Q 0Qq TEMPORARY CONSTRUCTION ENTRANCE RIPRAP OUTLET PROTECTION SF SILT FENCE i TREE PROTECTION FENCE 5 3-51 EXISTING ` ■ PROPOSED PROJECT ;. HARD WARD CLOTH ♦ GRAVEL ' INLET PROTECTION f �\X 1 F� I ", SEAL SEAL ``�'1111tIFP /B��1yy/0 v YY�- 7 an a L 0 µ �.9 zra �•�,-0 6 b Bffi��cuacL'a�es ®� A 4ig NFICM&CTEED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233 -8091, Fax: (919)233 -8031 F -1222 www.mckimcreed.com 9 11 .♦ Old .A , "! o, 0i K4 o ROJ t. 'STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY M &c FILE NUMBER il -E CR103 HORIZONTAL; DRAWING NUMBER 1" = 50' VERTICAL; C3.3 N/A 'STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY � 100' RIPARIAN BUFFER 'WFTLANDS,*/ N_ 10' NO—BUILD BUFFER' 48 LF 24" CONCRETE PRESSURE PIPE END Wk L PER NCDOT NORMAL POOL EL. 414.5' BO OF POND EL. 408.0", DETAIL 838.80 FOR 24 " PIPE OVERALL BRIAR CHAPEL N PROPERTY BOUNDARY Cl —167 A INSTALLED TO DIMENSIONS SHOWN. PRINCIPLE SPILLWAY SEE DETAILS SHEET SEDIMENT FOREBA 80 TTOM El ON TRA C TOR SHALL NOT DISTURB AREAS _XX BEYOND 100' PROPERTY A BO ARY BUFFER 425 ERGENCY SPILL WA Y 410 SEE DETAIL outflet 0 SHEET D4.2 41,5 CHA THAM COUNTY 420, 100' RIPARIAN BUFFER PROTEC770N. SEE, 10' NO—BUILD BUFFER DETAIL SHEET D1.2 m 0' PROPER TY UNDAR BUFFER � WET SCALE = 1^ = 40' 10.0, 27.3' GALVANIZED 4`x4'x " TRASH RACK PRECAST CONCRETE BOX EACH] Lo 4 24" CONCRETE PRESSURE PIPE INV.= 410.50' SEc*rION VIEW RIBBER GASY'vET-- PLACE CEMENT MORTAR /�/�K|/�[}[T-[ [�[)[[.��UO[ CONCRETE �� [- [\[-~]��LJ[\[- PIPE JO|kT L[T+|L 7.7` � (C ` | | | | | / / | / / | | TOF' BANK � OF 8A | | / . EL_ . / � 420.0' 3 100—YR. 24—HR STORM B— 419.04` 70—YR, 24—HR STORM EL. 418.23 ' / NORMAL POOL EL. 414.50' S7 BOTTOM OF POND NTS �z _ HAND CRANK FOR GATE VALVE TOP EL.=416.33' 3.0. WIDE X 0.33. TALL RISER OPENING ONE SIDE ONLY BOTTOM EL 416.00 6,0" K}VV FLOW ORIFICE EL. 414.50' WITH TURNED—DOWN PVC ELBOW TO HAVE 2.5" HOLE DRILLED IN CAP 8" D| GATE VALVE �~ 8' PVC TO POND BANK -) FlLL WITH GROUT BOTTOM EL.=410.00' ANGLE IRONS: 4" X u° " X 4' LONG TYPICAL EACH SIDE FASTENERS: 1^ 0 EXPANSION ANCHORS @ 8" [).C. 3y4"I.AP \ 1" 0 EXPANSION ANCHORS TYPICAL EACH SIDE ck" m (-_4TF vu|vF AND CRANK PRINCIPLE SPILLWAY r-[\||���|[-L_L_ SCALE = 1~ = 2' PLACE CEMENT MORTAR IN JOINT SPACE SECTION H EMERGENCY SPILLWAY EL. 418.35' PROPOS MAINTAIN MIN. 1' OF COVER OVER PIPE MAINTAIN MIN. 1' OF FILTER DIAPHRAGM CONCRETE ENDWALL COVER OVER PIPE SEE DETAIL SHEET D-4.2 PER NCDOT STANDARD 838.80 48 LINEAR FEE71 — 24" CONCRETE PRESSURE PIPE ____ 8 ° PVC TO BANK --� CONCRETE CRADLE TO RUN EL. 410.50' LENGTH OF PIPE SEE DETAIL THIS SHEET NOTE: SEE DAM EMBANKMENT PRINCIPLE SPILLWAY DETAIL /SHEET D-4.2\ SEE DETAIL THIS SHEET �[��T|��N �T PRINCIPLE SPILLWAY ��L-L/| |\J|� �-\| F-[\||���|r-L-L- SCALE = 1^ = 4' SeAL 46;; ZZOP;*20� MWW & CMED 173O Varsity Drive, Suite 50O Raleigh, North Carolina 27600 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 6" PVC TO DAYLIGHT TM CHAPEL by Newland commumms 12° 15�O^ 12" /K4|N\ CONCRETE CRADLE /k4|N 2000 PSI CONCRETE) R|PRAP OUTLET PROTECTION. SEE DETAIL THIS SHEET PLAN VIEW ANGLE IRON 4"X4"X5/8"X J' LONG TYPICAL EACH SIDE 24—|N RCP PRESSURE PIPE SELECT FlU_ PLACED AND COMPACTED AT 95% STANDARD PROCTOR MAX DRY DENSITY AT PLUS 2%-3Y3{)F / OPTIMUM MOISTURE CONTENT TO TOP OF PIPE ` SELECT FILL PLACED AND COMPACTED AT 95% STANDARD PROCTOR MAX DRY DENSITY AT OP7lWUk4 TO PLUS 3% OF OPTIMUM MOISTURE CONTENT TO MIDPOINT OF PIPE PRIOR TO TRENCH EXCAVATION PLAN VIEW CONCRETE ENDWALL FOR 24" PIPE PER NCDOT DETAIL 838.80 rel BRIAR CHAPEL PHASE 8 CHATHAM COUNTY, NORTH CAROLINA NTS DATE: MAY 21, 2013 DRAWN GCA DESIGNED GCA CHECKED CHS SCALE AS NOTED w&CcILE NUMBER �� ��_,.^^ �� DRAWING NUMBER ��� ��"�" 1 rSTATUS: RE-VISION FINAL DRAWINGS kk FOR REVIEW PURPOSES ONLY TOP OF DAM W1.4xW1.4 6X6 W.W.M. OR APPROVED EQUAL (MIN 2" COVER) TOP OF CONCRETE 3.0 EL. 418.35' 1 _ 100 -YR STORM EL. 419.04' 6" THICK CONCRETE 3000 psi @ 28 DAYS 414.50 r-7 60' SECTION A -A 11.5' 22' 1 11- W1.4xW1.4 6X6 W.W.M. OR APPROVE- EQUAL 7 (MIN 2 °' COVER) SECTION B -B I NIJ JHtf= 1 6" THICK CONCRETE 3000 psi @ 28 DAYS ey � i TOP OF SPILLWAY EL. 418.35' i VI 1.0' (MIN.) EMERGENCY SPILLWAY DETAIL NTS EXPANSION /CONTRACTION JOINTS PER AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS FOR SLABS ON GRADE. `lae�a�aeaa��s�a SEAL .� 28411.9 10 TOP OF DAM EL. 420.00' LIMITS OF CONCRETE CRADLE 2. 8' KEY TRENCH DAM EMBANKMENT DETAIL NTS 2' #57 WASHED STONE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPENEND. -1 -FrT771 24" CONCRETE �W PRESSURE PIPE - - - - - - 2.75' LIMITS OF CONCRETE CRADLE 6" PERFORATED PVC COLLECTOR PIPE llfl 3 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPENEND. COLLECTOR PIPE TO BE CAPPED ON BOTH ENDS PLAN VIEW 2' MIN. #57 WASHED STONE -•-- -. 2' FLOW 6.0' 24" CONCRETE PRESSURE PIPE MIRAFI 14ON GEOSYNTHETIC FABRIC NTH 18 -INCH OVERLAP AT ALL SEAMS (TYP) SECTION VIEW Al j6zPoNF1<1M&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233 -8091, Fax: (919)233 -8031 F -1222 www.mckimcreed.com PROPOSED GRADE ON DOWNSTREAM SIDE OF DAM 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. DAM EMBANKMENT NOTES: 1) TOPSOIL BENEATH THE EMBANKMENT SHALL BE REMOVED AND STOCKPILED. THE FOUNDATION WILL BE PROOF ROLLED AND ANY SOFT OR ORGANIC MATERIALS WILL BE REMOVED. 2) ALL MATERIAL SHALL BE COMPACTED IN 6 -8 INCH LIFTS TO 95% OF MAXIMUM STANDARD PROCTOR DRY DENSITY OR HIGHER (ASTM D -698). THE CLAY CORE ZONE WILL HAVE A MOISTURE CONTENT OF OPTIMUM TO 4 PERCENT ABOVE OPTIMUM MOISTURE CONTENT. THE SHELL ZONE FILL WILL HAVE A MOISTURE CONTENT FROM 2 PERCENT BELOW OPTIMUM MOISTURE CONTENT TO 4 PERCENT ABOVE OPTIMUM. 3) EMBANKMENT FILL: SHELL ZONE: SOILS WITH LESS THAN 30% PASSING THE NO. 200 SIEVE OR A PI OF LESS THAN 10 WHEN THE PERCENTAGE OF MATERIAL PASSING THE NO. 200 SIEVE IS GREATER THAN 30 PERCENT. SOILS WHICH ARE CLASSIFIED AS CLAYS (CH OR CL) SHOULD NOT BE USED AT THE FACE OF THE SHELL ZONES. CLAY CORE ZONE: CH, CL OR SC MATERIAL WITH A PI RANGING BETWEEN 15 AND 60 4) NO FILL SHALL CONTAIN ROCKS OR GRAVEL LARGER THAN 4 INCHES IN DIAMETER. 5) A PROFESSIONAL GEOTECHNICAL ENGINEER SHALL APPROVE ALL MATERIALS USED FOR THE EMBANKMENT AND SUPERVISE CONSTRUCTION. 6) ALL DISTURBED AREAS ABOVE PERMANENT POOL SHALL BE SEEDED USING THE FOLLOWING GRASS SEED MIX MANUFACTURED BY ERNST SEED COMPANY: Carolina FACW Meadow Mix ERNMX -182 0 Q m N � CD a a r- n -1 CD mo _-I = -nDnm rn 0; o C7Z =Z • ny> -1 Ch a0a Z7 in z m r Z n G) > to m _ n m -4QZ C v = 0 Ni m ­4 _ M m z Z Z °y0 m r W1 FT. ELEVATION 8" 0.C.(TYP.) REFER TO CHART FOR BAR SIZE by Newland commumms PLAN r� D 6" 1' -0" f o I CLAY LINER NOTES: EXISTING GROUND IN ORDER TO HELP SUSTAIN THE PERMANENT POOL AND TO PREVENT WATER FROM INFILTRATING TOO QUICKLY INTO THE UNDERLYING SOIL, THE CONTRACTOR SHALT_ INSTALL A 6" THICK CLAY LINER ON THE BOTTOM OF THE WET DETENTION POND AREA UP TO ELEVATION 454.50. THE LINER CAN BE ACCOMPLISHED BY BLENDING EXISTING SITE SOILS WITH CLAY TO ACHIEVE A LOW PERMEABILITY MIXTURE OR BY INSTALLING A GEOSYNTHETIC LINER MADE OF A BENTOMAT CL. IF THE CONTRACTOR CHOOSES TO BLEND THE EXISTING SITE SOILS WITH CLAY, THE ONSITE GEOTECHNICAL ENGINEER SHALL DETERMINE THE AMOUNT OF CLAY TO ADD, THE DEGREE OF COMPACTION, AND WILL OVERSEE THE INSTALLATION OF THE CLAY LINER. THE MAXIMUM PERMEABILITY RATE FOR THE LINER SHALL BE 0.72 CM /DAY. THE PROPOSED MATERIAL FOR THIS LINER SHALL BE TESTED BY THE ONSITE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. THE RESULTS OF THIS TESTING SHALL BE SUBMITTED TO THE DESIGN ENGINEER FOR REVIEW PRIOR TO PLACEMENT. UPON COMPLETION OF LINER INSTALLATION, A LAYER OF TOPSOIL MAY BE ADDED OVER THE LINER TO PROVIDE A HEALTHY MEDIA FOR VEGETATION GROWTH. H2 H1 I co ::iE�: I 6,. 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE SIDE ENDWALL DIMENSIONS FT. MINIMUM O C MIN. /MAX. E--o 1- NOTES: MIN. /MAX. PIPE DIA. a h X * THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING CC �t.7 STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.33, LL.-! 4 "z 838.39, 838.51, 838.57, 838.63 AND 838.69. O o cn = er '', * INSTALL PRECAST ENDWALLS WITH WINGS AND PAY W Q LL i FAR IN ACCORDANCE WITH SPECIFICATION SECTION 838. Cr * USE 4000 PSI CONCRETE. 2 W * PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615E- Cfj W O J FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING O 0 t~ < TO ASTM A185 WITH 2" MIN. CLEARANCE. Z H * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH 1.50 I" OSHA STANDARD 1926.704. 3.00/4.25 W * PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY 6.5016.75 CS CONTRACTOR 1.50/2.50 4.00/4.75 * ALL ELEMENTS PRECAST TO MEET ASTM 0913. 4.00/4.25 * WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR 2.5 A$ LONG AS THE SAME AREA OF STEEL IS PROVIDED. 2.50/3:.50 * CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 10. 2.00/3.00 4.5015.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 W 2.75/3.50 MINIkQJM BAR TION 11.50/11.75 3.5 1 #5 @ 8" AOT8: 0 6.00/6.75 J 6.0016.75 TO INCREASE THIS BAR SIZE AS NEEDED. 4.0 LL �, o ENDWALL DIMENSIONS FT. MINIMUM MIN. /MAX. MIN. /MAX. MIN. /MAX. MIN. /MAX. MIN. /MAX. PIPE DIA. BAR SIZE H1 (FT,) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.2511.75 3.00/3.75 515016.00 1.25 #5 @ 8" 1.25/2.00 3.0013.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ 8" 1.25/2..00 3.00/4.25 1.50/2.50 3.50/3.75 6.5016.75 2.0 #5 @ 8" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3:.50 4.00/6.00 2.00/3.00 4.5015.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 5.00/6,00 2.75/3.50 ' 5.25/5.75 11.50/11.75 3.5 1 #5 @ 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.0016.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00113.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50/15.75 5.0 #5 @ 8" 4.5015,00 7.0018.50 3.25/4.00 7.2519.25 13.75/15.75 5.5 1 #5 @ 8" 4.50/5,.00 7.50/8.50 3.25/4.00 1 7.25/9.25 14.00/15.75 6.0 1 #5 @ 8" 1 4.50/5.00 7.50/8.50 3.25/4.00 1 7.75/9.25 1 14.75/16.75 Milk DATE: MAY 21, 2013 MCE PR07. # 02735 °0092 DRAWN GCA DESIGNED GCA CHECKED CHS PROD. MGR. CHS $ Cb 2C L" a. n W aL a LU LU N Qh a U Cr Q Q F- N = H CO en W 0 z z W " co W 9= CL o Ue i SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M &C FILE NUMBER D4. X DRAWING/�NUMBER D4.Z iTATUS: REVISION FINAL DRAWINGS FOR REVIEW PURP(35ES t�NLY 25 S ....................... lip __.. NORTH A/,, - WET DETENTION POND #13 PLANTING PLAN SCALE = 1 " = 30' w ``�`(tO'ytry`tt ^ttts���' SEAL A RP 8i9o. ° °q�9e''.�A.a.71,`�G.�[�e° .ry moo` s ° °�era,esett ° °' A NTIM4&CITEDII � r 4w 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F -1222 www.mckimcreed.com IL PLANTING SCHEDULE MAY 21, 2013 CE PRO3. # 02735 -0092 DRAWN GCA DESIGNED CONTAINER SIZE AT SYM. ABB. COMMON NAME BOTANICAL NAME QUANTITY SPACING PLANTING SHALLOW WATER PLANTINGS SF SWEETFLAG Acorus subcordatum 152 24 " -30" O.C. 1 QT. PW PICKERELWEED Pontederia cordata 129 24 " -30" O.C. 1 QT. °- BFI BLUE FLAG IRIS Iris virginica 135 24 " -30" O.C. 1 QT. * + + + + + ++ SR SOFT RUSH Juncus effusus var. 128 „ 24 —30 O.C. 1 QT. pylael or solutus vv v TSB THREE SQUARE BULRUSH Schoenoplectus 130 24 " -30" O.C. 1 QT. v v v americanus SHALLOW LAND PLANTINGS -LL LL SM SWAMP MILKWEED Asclepias incarnate 138 24 " -30" O.C. 1 QT. LLLL CF CARDINAL FLOWER Lobelia cordinalis 145 24 " -30" Q.C. 1 QT. SRM SCARLET ROSE MALLOW Hibiscus coccineus 124 24 " -30" O.C. 1 QT. JpW DWARF JOE PYE WEED Eupatoriadelphus dubius 141 24 " -30" O.C. 1 QT. ST SPOTTED TRUMPETWEED Eupatoriadeiphus 139 T 24 " -30" O.C. 1 QT. maculatuS INSTALL PLANTS 'WHERF CROWN IS FLUSH IM-1H aC L a,URFACE GUT" & RENO ANY CO%ERI G AIR.OUND ROOT5 AMEE40EU TOPSOIL MM 12 IN DEPTH .� �� 11 1����. ■.._n U- 111 t�E1��.����:���II�IIC��l1(. =_. GENERAL PLANTING DETAIL NTS GENERAL PLANTING NOTES: 1. AVOID COMPACTING TOPSOIL TO PROMOTE HEALTHY ENVIRONMENTAL CONDITIONS FOR THE PLANTS. 2. ALL PLANTS SHOULD BE PLANTED IN THE INDICATED RANGE TO ENSURE SURVIVAL. 3. SHALLOW WATER AND SHALLOW LAND AREAS TO BE PLANTED WITH BARE ROOT, PLUGS, OR CONTAINER LIVE PLANTINGS AS SPECIFIED. 4. EXCAVATE A HOLE TWICE THE DIAMETER OF ROOT BALL AND EQUAL TO THE ROOT DEPTH OF THE INDIVIDUAL PLANT. PLACE PLANT IN HOLE WITH CROWN FLUSH WITH SOIL SURFACE. BACKFILL WITH TOPSOIL AND LIGHTLY PLANT. 5. BEGIN PLANTING DURING LOCAL GROWING SEASON IN ORDER TO ENSURE THAT PLANTS HAVE ADEQUATE TIME TO ESTABLISH BEFORE WINTER MONTHS. 6. OBTAIN PLANTS FROM: COASTAL PLAIN CONSERVATION NURSERY (252 --- 482 - ®5707), MELLOW MARSH FARMS (919 -742 - 1200), CURE NURSERY (919 -542 -6186) OR ENGINEER APPROVED SUBSTITUTE. 7. REFER TO EROSION CONTROL DETAIL SHEET D -2 FOR SEEDBED PREPARATION AND SEEDING SCHEDULES FOR AREAS NOT SPECIFIED IN THIS PLAN. SHALLOW WATER PLANTING NOTES: 1. 70% OF PICKERELWEED SHOULD BE PLANTED WITHIN 5 -6 INCHES BELOW NORMAL POOL. 2. 70% OF SWEETFLAG AND 70% OF SOUTHERN BLUE FLAG IRIS SHOULD BE PLANTED IN THE 2 -3 INCHES BELOW NORMAL POOL. 3. 70% OF SOFT RUSH SHOULD BE PLANTED AT THE NORMAL POOL ELEVATION. SHALLOW LAND PLANTING NOTES: 1. PLANTS IN THIS GROUP SHOULD NOT BE PLANTED IN AREAS THAT ARE INUNDATED FOR EXTENDED PERIODS. by Newland co>w>Kmms BRIAR CHAPEL PHASE a CHATHAM COUNTY, NORTH DATE: MAY 21, 2013 CE PRO3. # 02735 -0092 DRAWN GCA DESIGNED GCA CHECKED CHS PROS. h1GR. CHS E&j HORIZONTAL, AS NOTED VERTICAL: N/A M&C FILE NUMBER D4 . X DRAIVING NUMBER D4.3 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY