HomeMy WebLinkAbout820677_Inspection_20210626 (2)Division of Water Resources
O'Divisiion of Soil and Water Cons
0 Other Agency"
Type of Visit: .0-Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit:outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit:
Arrival Time:
Farm Name: 004,411 f 2�
-
Owner Name:
0:4)e)fin
Mailing Address:
Physical Address:
Facility Contact:
Departure Time:
))Lp,Iounty:
Region: f//76
7
9 _ /'/ Owner Email:
Phone:
aze0.4)-(...,Title: Phone:
Onsite Representative: Integrator:Az-4-6-- �� `-,1
a�'� k Es y
Certified Operator: �7�G`-�" Certification Number: / $' .3 .7 0
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current
Capacity Pop.
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Design Current
Capacity Pop.
❑ Yes ®"No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes .[a''10 ❑ NA ❑ NE
❑ Yes Ej.No ❑ NA ❑ NE
Page 1 of 3
2/4/2015 Continued
Facility Number: K2 - 77
7
Date of Inspection: Z,41/4/
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
a. If yes, is waste level into the structural freeboard?
Structure 1 Structure 2 Structure 3 Structure 4
Identifier: l
Spillway?:
Designed Freeboard (in): / c/
Observed Freeboard (in):
❑ Yes 17rNo ❑ NA ❑ NE
❑ Yes J'No 0 NA ❑ NE
Structure 5 Structure 6
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
8. Do any of the structures lack adequate markers as required by the permit?
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ NA El NE
❑ Yes No ❑ NA ❑ NE
❑ Yes ,,e'No ❑ NA ❑ NE
❑ Yes E'No ❑ NA ❑ NE
❑ Yes ®-'No ❑ NA 0 NE
❑ Yes 'N° ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s)://l;e,-n-u•t
13. Soil Type(s): CA..)/00V-6,--at"aur
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
���[ �(/�ii�s/ -fr�'o /�9" vJ����� fr'�Yf� ��'V(/(.���/ "✓ / /�/ L� eii" g/
❑ YesEt-No
❑ Yes /Er No
❑ Yes ..tallo
❑ Yes .2No
❑ Yes ,,121'No
❑ Yes allo
❑ Yes ®'\To
❑ Other:
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑NE
❑ NA ❑ NE
❑NA ❑NE
21. Does record keeping need improvement? If yes, check the appropriate box below. 0 Yes _12 No ❑ NA ❑ NE
❑ Waste Application 0 Weekly Freeboard 0 Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall 0 Stocking 0 Crop Yield ❑ 120 Minute Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
Page 2 of 3
❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
❑ Yes ,2'No ❑ NA 0 NE
❑ Yes jNo ❑ NA 0 NE
2/4/2015 Continued
Facility Number: - -�
Date of Inspection: a v(v"�/r
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
the appropriate box(es) below.
❑ Failure to complete annual sludge survey
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
❑ Yes D-No ❑ NA ❑ NE
0 Yes 12."No 0 NA ❑ NE
❑ Failure to develop a POA for sludge levels
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? 0 Yes
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑ Yes
O Yes
2i-Ko
.®"No
Jo
❑NA ❑NE
• NA ❑NE
❑ NA ❑ NE
❑ NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations
Use drawings of facility to better explain situations (use additional pages as necessary).
or any other comments.
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
c1if
rem v r Phone:
Date:
617
66/bi
Page 3 of 3 2/4/2015
FACILITY #: `��:�' ���, r` FARM NAME:
FREEBOARD
ACTUAL LAGOON LEVEL
- DUE EVERY 5 YEARS
- EXPERIATION DATE
PERMIT (#19)
NUMBER OF ANIMALS
- ACTUAL NUMBER OF ANIMAL
- OIC CARD YES oR NO
SOIL TYPES
WASTE UTILIZATION PLAN (WUP) (#20)
CROP TYPES
- THE UTLIZATION PLAN SHOULD HAVE A (-) NEGATIVE NUMBER
- ODOR CONTROL CHECK LIST YES'OR NO
- Irrigation Plan Maps ----
WASTE REPORT (#21)
-GOOD FOR 60 DAYS BEFORE OR AFTER
DATE ;-'
�'NITROGEN LEVEL
SOIL REPORT (#21)
EVERY 3 YEARS: DATE
P-I (NO MORE THEN 400)
PH (Note if 4 or less)
- Cu/ZN (NO MORE THEN 3000) CU
(IF PEANUTS NO MORE THEN 300)
MENTAL CHECK OF CROP AND FIELD NUMBERS
ZN
IRR2 (#21)
ZONE ACRES PAN CROP TYPE
FLOW RATES NITROGEN (N)
120 Min inspection initialed Weather Codes
Commercial Fertilizer Chicken Litter
CALBRIATION (#24)
RAIN BREAKER FORM
- EACH REEL SHOULD BE CALIBRATED
- DATE DUE EVERY TWO YEARS��
- FLOW RATES
RAIN FALL (#21)
-INITIAL AFTER 1" RAIN EVENT
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED
-LOOK FOR BIG NUMBER DIFFERENCES SEE THAT THEY MATCH THE IRR2
FORM
SLUDGE (#21 & 25)
-DUE EVERY YEAR: DATE
0: P:. ` % RATIO OF SLUDGE
OTHER FORMS (#22 AND #21)
CROP YEILDS MORTALITY
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON
SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO
BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) ALIVE CROP HARVESTED
FIELDS GOOD HEALTHY CORPS CORRECT
CROPS NO PONDING REELS FEED
BINS LAGOON GARBAGE