Loading...
HomeMy WebLinkAboutNC0068888_Correspondence_20210628Mayor Rick Coleman Aldermen Jerry Cearley Allen Huggins Darlene Morrow Hoyle Withers Town Manager Maria Struope Town Clerk Shannon Whittle Town Attorney Thomas Hunn Public Works Bill Trudnak Electrical J. Doug Huffman Police Chief Robert Walls Planning David Kahler Fire Chief Earl Withers Recreation Brandon Whitener Town of Dallas 210 N. Holland St. Dallas, NC 28034 Phone: 704-922-3176 Fax: 704-922-4701 Web Page: www.dallasnc.ne Public ." �. 4 Ihe C'ro3srca s o 6aston Cou June 22, 2021 Ori Tuvia Mooresville Regional Office 610 East Center Ave. Mooresville, N.C. 28115 Received: NOTICE OF VIOLATION Tracking Number: NOV-2021-LV-0449 Permit No. NC0068888 Dallas WWTP Gaston County RECEIVEDINCDEQIDWR JUN 2 8 WORDS MOORESVILLE REGIONAL OFFICE Sir, On February 13th, 2021, through February 15th the Dallas Waste Water Treatment Plant experienced a total of 3 3/4 inches of rain. The heaviest of which was on February 15th, a total of 2 3/4 inches within an hour. It led to these limit violations. SAMPLE LOCATION Date LIMIT SAMPLE VAULE VIOLATION 001 Effluent BOD 001 Effluent TSS 001 Effluent TSS 2/20/21 2/20/21 2/28/21 39 68.37 Weekly Average Exceeded 45 86.98 Weekly Average Exceeded 30 30.05 Monthly Average Exceeded During the rain event I made the effort to try and hold the WW'1'P within permit limits and prevent it from hydraulic overloading by turning RAS fully open on East Basin and West Basin and had waste valves open at same time. Filling both digesters up during rain event. Which would give proper time for treatment by taking some of the high flow. I Also shut blower one off to help keep solids down during high flow The flow rate just exceeded the system's designed flow rate. Effectively causing these violations of our permit. We regret going non -compliant that corresponding week and for the month. We thrive to stay within permit limits and meet all guidelines. New measures are currently under construction to take some of the flow off the plant. There is an interconnect being constructed to take 150,000 gallons a day and reroute it to Gastonia's Long Creek WWTP. Which will give our plant a much needed break until we can upgrade. The interconnect is under construction now and scheduled to be complete December 2021. Any questions concerning this non -compliant event are welcome. Thank You, Michael Stafford/ORC (980)-745-4694