HomeMy WebLinkAbout20120596 Ver 1_Emails_20130513 (2)Scheller, Roberto
From:
David Moose [dmoose @geo- marine.com]
Sent:
Monday, May 13, 2013 2:03 PM
To:
Scheller, Roberto
Subject:
Area D Streams and Ordinance
Roberto
As per our conversation last week, I am finishing up the verification packet for area D and should be able to get it to you
ASAP. Also I wanted to let you know that the survey group has started to pick up flags in the Ordinance Area and we wil
get that packet to you when they finish. Hope all is well and if you have any questions please feel free to contact me.
Thank vou.
David Moose I Environmental Scientist "
r-I
x
Celebrating 40 Years
www.geo- marine.com
Cell: (919) 223 -0905
1
' it
Scheller, Roberto
From: Laura Lloyd [Illoyd @geo- marine.com]
Sent: Tuesday, September 04, 2012 11:47 AM
To: Scheller, Roberto
Subject: Update on Area A
Hey Roberto,
It was so good to hear from you this morningM Apologies for being off kilter today. I am a bit out of sorts but I was
hoping no one would notice. You did though!
The latest shapefiles for Area A came in this morning and Moose just finished reviewing them. It seems that we are still
missing three stream calls in that project area (IQ -02, IQ -03, and GG -01a). We're going to notify them of the missing
stream calls (and wetland flags) and hopefully they can get us the final surveyed points file soon. Our new surveyors just
started picking up our flags in,Project Area D in the past week or so, but we're hoping they'll be able to move along a
little faster and get that Area surveyed in a few months time.
I also wanted to tell you that I have been assigned to work in the Gulf for the next two months. I was actually supposed
to fly out today but I have been put on hold due to the aftermath of Hurricane Isaac (roads out, widespread flooding,
power outages, etc.). I hope to be able to see Areas A and D through to completion but you will likely be working with
Moose or Jason on the final submittal for those areas. Either way, we'll keep you posted as we get a better idea of when
we can get Areas A and D to you as well as our start dates for the MCAS -CP Ordinance area.
Thanks and have a good one!
Janine Lloyd
Geo- Marine, Inc.
1911 -D Lejeune Blvd
Jacksonville, NC 28546
Phone: (910) 355 -9920
Fax: (910) 355- 9921
Cell: (910) 471 -1435
This e-mail and any files transmitted with it are the property of Geo- Marine, Inc. The information transmitted via this e-mail is intended for the person or entity to which it is
addressed and may contain proprietary and /or privileged material. Any review, retransmission, dissemination or other use of or taking of any action in reliance upon this
information, by persons or entities other than the intended recipient is strictly prohibited. If you receive this e-mail in error, please contact the sender and delete the material
from your computer.
Scheller, Roberto
From:
Laura Lloyd [Illoyd @geo- marine.com]
Sent:
Thursday, June 28, 2012 4:23 PM
To:
Scheller, Roberto
Subject:
verified streams to date at MCAS Cherry Point
Good Afternoon Roberto,
Your numbers for field verification of stream origins at MCAS Cherry Point follow...
Project Area C (Verified February 7th Stn 28th and 29th 2012)
GMI Calls:
INT Stream - 21
PER Stream - 23
PER RPW - 6
SNL RPW —15
NCDWQ:
Total streams visited in C = 65 (18 INT and 17 PER streams verified)
Proiect Area B (Verified March 21 "d, 22nd and 28th, 2012)
GMI Calls:
INT Stream —14
PER Stream —15
PER RPW —1
SNL RPW — 5
Non -RPW —1
NCDWQ:
Total streams visited in B = 36 (11 INT and 3 PER streams verified)
Project Area A (Verified April 9th, and 191h, 2012)
GMI Calls:
INT Stream — 5
PER Stream —12
PER RPW —11
SNL RPW — 3
Non -RPW — 3
NCDWQ:
Total streams visited in A = 34 (7 INT and 9 PER Streams to date. Still need to check 2 origins)
Project Area D (Verified May 29th and June 27. Next field visit scheduled July 6th, 2012)
GMI Calls:
INT Stream — 6
PER Stream — 8
SNL RPW —12
1
s
PER RPW —16
Non -RPW =1
Potential stream origins — 7
NCDWQ:
Total streams visited in D = 32
Total stream verifications at MCAS Cherry Point from Feb., 7th to June 27th = 167
Please give me a quick call when you get this. I have a question about the call made at one of the origins (GW -01a)
yesterday.
Thanks,
Janine Lloyd
Geo- Marine, Inc.
1911 -D Lejeune Blvd
Jacksonville, NC 28546
Phone: (910) 355 -9920
Fax: (910) 355- 9921
This e-mail and any files transmitted with it are the property of Geo- Marine, Inc. The information transmitted via this e-mail is intended for the person or entity to which it is
addressed and may contain proprietary and /or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon this
information, by persons or entities other than the intended recipient is strictly prohibited. If you receive this e-mail in error, please contact the sender and delete the material
from your computer.
I
27 June 2012
Mr. Roberto L. Scheller
North Carolina Division of Water Quality
Washington Regional Office
943 Washington Square Mall
Washington, North Carolina 27889
Re: Request for Stream Origin Determination Field Visit (Project Area D): MCAS Cherry
Point, Havelock, NC.
Dear Roberto:
Geo- Marine, Inc. (GMI) is pleased to submit this Stream Origin Determination Field Visit packet
for MCAS Cherry Point project area D for your review. Included in this packet are the following
items:
1) Project description for MCAS Cherry Point Project Area D.
2) Stream Origin Determination Methodology.
3) Figures including: Vicinity Map and Stream Origin and RPW Locations Map.
4) Appendix A - NCDWQ stream forms and photos of streams and RPW origins.
5) Appendix B - Supplemental imagery including Soil Survey Maps and USGS Topo Maps.
We appreciate the opportunity to work with you and the other Washington Regional Office
DWQ personnel. Please contact us if you have any questions regarding the information we have
provided.
Sincerely,
Jason C. Hales
Project Manager /Wetland Scientist
Geo- Marine, Inc.
1911 Lejeune Blvd., Suite D
Jacksonville, NC 28546
757- 692 -8562
29 May 2012
Mr. Roberto L. Scheller
North Carolina Division of Water Quality
Washington Regional Office
943 Washington Square Mall
Washington, North Carolina 27889
Re: Stream Origin Determination (Project Area D): MCAS Cherry Point, Havelock, NC.
Dear Roberto:
Geo- Marine, Inc. (GMI) is pleased to submit this Stream Origin Determination packet for MCAS
Cherry Point project area D for your review. Included in this packet are the following items:
1) Project description for MCAS Cherry Point Project Area D.
2) Stream Origin Determination Methodology.
3) Figures including: Subject stream origins and non - subject WoUS origins over USGS
topographic maps and USDA soil survey maps.
4) NCPLS Origins Table
We appreciate the opportunity to work with you and the other Washington Regional Office
DWQ personnel. Please contact us if you have any questions regarding the information we have
provided.
Sincerely,
David Moose
Environmental Scientist
Geo - Marine, Inc.
2713 Magruder Blvd. Suite D
Hampton VA, 23666
919- 223 -0905