Division of Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 1,2021 Ver4.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6' Yes
✓ No
Is this project a public transportation project?*
R Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20210864 1
Is a payment required for this project?*
(7 No payment required
✓ Fee received Reviewing Office*
✓ Fee needed-send electronic notification Washington Regional Office-(252)946-6481
Select Project Reviewer*
Garcy Ward:eads\gpward
Information for Initial Review
la.Name of project:
SR 1122 Hydeland Road Shoulder Repair and Bank Stabilization
1a.Who is the Primary Contact?*
Steve trowel!
lb.Primary Contact Email:* 1c.Primary Contact Phone:*
sjtrowell@ncdot.gov (252)402-4015
Date Submitted
6/28/2021
Nearest Body of Water
Hydeland Canal
Basin
Tar-Pamlico
Water Classification
SC
Site Coordinates
Latitude: Longitude:
35.42004 -76.20930
A. Processing Information L)
County(or Counties)where the project is located:
Hyde
Is this a NCDMS Project
✓ Yes ( No
Is this project a public transportation project?*
( Yes r No
Is this a NCDOT Project?*
( Yes r No
(NCDOT only)T.I.P.or state project number:
WBS#(?)
1.1048111
Pre-Filing Meeting Information
Is this a courtesy copy notification?*
✓ Yes G No
ID# Version
Pre-fling Meeting or Request Date
6/25/2021
Attach documentation of Pre-Filing Meeting Request here:
Click the upbad button or drag and drop files here to attach docurrent
RE_Preapplication Meeting for Shoulder Repair and Bank Stabilization SR 1122 Hydeland Road.pdf 149.74KB
Fie type mast be FCF
1a.Type(s)of approval sought from the Corps:
(7 Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
✓ No
lb.What type(s)of permit(s)do you wish to seek authorization?
r Nationwide Permit(NWP)
f7 Regional General Permit(RGP)
r Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
G Yes r No
Regional General Permit(RGP)Number: 197800080-Bulkheads and Riprap
RGP Numbers(for multiple RGPS):
Id.Type(s)of approval sought from the DWR:
17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
r Individual 401 Water Quality Certification
le.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: r Yes 6' No
For the record only for Corps Permit: r Yes 6 No
If.Is this an after-the-fact permit application?*
✓ Yes f No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes ( No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
lh.Is the project located in any of NC's twenty coastal counties?
6 Yes rNo
1i.Is the project located within a NC DCM Area of Environmental Concern(AEC)?
6 Yes r No r Unknown
1j.Is the project located in a designated trout watershed?
✓ Yes 6. No
B. Applicant Information
Id.Who is applying for the permit?
17 Owner r Applicant(other than owner)
le.Is there an Agent/Consultant for this project?*
✓ Yes 6. No
2.Owner Information
2a.Name(s)on recorded deed:
Northy Carolina Department of Transportation
2b.Deed book and page no.:
2c.Contact Person:
Steve Trowel)
2d.Address
Street Address
113 Airport Drive Suite 100
Address Line 2
atY State/Province/legion
Edenton NC
Postal/ZZp Code Country
27932 USA
2e.Telephone Number: 2f.Fax Number:
(252)482-1876
2g.Email Address:*
sjtrowell@ncdot.gov
C. Project Information and Prior Project History U
1. Project Information
1b.Subdivision name:
OF appropriate)
N/A
1c.Nearest municipality/town:
Swan Quarter
2. Project Identification
2a.Property Identification Number: 2b.Property size:
2c.Project Address
Street Address
Address Line 2
(Sty State/Rovince/Region
Postal/Zip Code Country
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
Hydeland Canal
3b.Water Resources Classification of nearest receiving water:*
SC
3c. What river basin(s)is your project located in?*
Tar-Pamlico
3d.Please provide the 12-digit HUC in which the project is located.
030201050105
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
SR 1122 Hydeland road is a gravel secondary road that parallels a man made canal.Situated at the head of the canal is a Boating Access Site maintained by the NC WRC.Boat wakes
from traffic utilizing the boat ramp are causing the shoulder to collapse and the erosion is reaching the gravel travel lanes.
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
r Yes r No t: Unknown
4f.List the total estimated acreage of all existing wetlands on the property:
2 acres
4g.List the total estimated linear feet of all existing streams on the property:
5,000
4h.Explain the purpose of the proposed project:*
The purpose of this project is to restore the eroded shoulder to a consistent width and armor the shoulder with a sloping riprap revetment constructed using class B granite.This project
is only addressing areas that have an immediate need for stabilization.
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
This is a shoulder repair and bank stabilization project.Dump trucks will deliver fill dirt and rock to the site.An excavator will operate from the gravel road to shape the shoulder and
place the riprap.A woven geotextile fabric will be keyed in place once the shoulder has been shaped.Class B granite riprap will then be placed on a 2'to 1'slope to protect the
shoulder.A total of 250 linear feet will be completed addressing only areas that are in need of stabilization to prevent encroachment of the escarpement into the gravel travel lane.
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
s Yes r No C Unknown
Comments:
USACE Project manager Kyle Barnes delineated the wetlands during a June 25 2021 pre-
application site meeting
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
r Preliminary C Approved 6 Not Verified r Unknown C N/A
Corps AID Number:
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known): Kyle Barnes
Agency/Consultant Company: USAGE
Other:
6. Future Project Plans
6a.Is this a phased project?*
6 Yes O No
6b.If yes,explain.
A Major CAMA/Dredge and Fill permit,RGP 291 and corresponding DWR 401 Certification will be sought to repair and stabile the remaining 2700 linear feet of bank.
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a.Where are the impacts associated with your project?(check all that apply):
n Wetlands r Streams-tributaries 1 Buffers
I7 Open Waters r Pond Construction
4.Open Water Impacts
4a. Site# 4a1.Impact Reason 4b.Impact type 4c.Name of waterbody 4d.Activity type 4e.Waterbody type 4f.Impact area
1 Shoreline Stabilization P Hydeland Canal Stabilization Ditch 1,500.00
4g.Total temporary open water Impacts: 4g.Total permanent open water impacts:
0.00 1,500.00
4g.Total open water impacts:
1,500.00
4h.Comments:
E. Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
A 2':1'slope was chosen to reduce the revetment footprint while maintaining a stable slope.
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
A geotextile cloth will be utilized to prevent seepage of backfill material as well as prevent settling of the riprap.The riprap will be handled in a manner
to prevent accumulations of sediment or gravel from being placed on the revetment.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
✓ Yes ( No
2b.If this project DOES NOT require Compensatory Mitigation,explain why:
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
( Yes rNo
What type of SCM are you providing?
r Level Spreader
fJ Vegetated Conveyance(lower SHWT)
r Wetland Swale(higher SHWT)
r Other SCM that removes minimum 30%nitrogen
r Proposed project will not create concentrated stormwater flow through the buffer
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
( Yes r No
Comments:
A consistent shoulder width will be constructed and vegetated with grasses to match existing conditions.The project will maintain existing conditions within the buffer and no stormwater
runoff flow will be concentrated and diffuse flow Will be maintained.
G. Supplementary Information
1. Environmental Documentation
la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
( Yes rNo
lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPA/SEPA)?*
✓ Yes ( No
Comments:*
Impacts do not reach thresholds requiring NEPA or SEPA review.
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)?*
✓ Yes ( No
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
✓ Yes ( No
3b.If you answered"no,"provide a short narrative description.
Project will maintain existing conditions at the site.
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
✓ Yes r No ( N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
✓ Yes ( No
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
✓ Yes ( No
5d.Is another Federal agency involved?*
✓ Yes ( No r Unknown
5e.Is this a DOT project located within Division's 1-8?
( Yes r No
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
IPAC USFWS Website
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
✓ Yes ( No
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS Website
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
✓ Yes ( No
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
Cultural Resources Programmatic Agreement Screening Checklist for Sec 106
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-year floodplain?*
( Yes rNo
8b.If yes,explain how project meets FEMA requirements:
8c.What source(s)did you use to make the floodplain determination?*
Website FEMA Flood Zone Map
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one
file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach docurrent
SR1122HydeCo Shore Stab_drawings.pdf 220.63KB
Fle mist be FCF or FAME
Comments
Signature
*
rJ By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Steve J.Trowell
Signature
4 5r
Date
6/28/2021