HomeMy WebLinkAbout20211007 Ver 1_Meeting Request Review Doc Attachment_20210617(Version 2.08; Released April 2018)38571.1.1TIP No.:17BP.7.R.139County(ies):Rockingham Page 1 of 2TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future: Year:2040Existing: Year:Aquatic T&E Species?NoComments:Yes NoNoNoDeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.Scalesville Road (SR 1002): open shoulder section 2 paved lanes (total 20' wide).1500jdalton@sungatedesign.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Water Supply V (WS-V) NCDWR Surface Water Classification for Water BodyJordan LakeBuffer Rules in Effect:None1340Scalesville Road (SR 1002): 2 paved lanes (total 22' wide), 4' shoulder on each side (7' with guardrail). First 2' of shoulder is paved. Varying cut/fill slopes. See project typical sections for detail.Waterbody Information2018NCDWR Stream Index No.:38571.1.1Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The North Carolina Department of Transportation (NCDOT) has proposed to replace Rockingham County Bridge #780018 on Scalesville Road (SR 1002) in Rockingham County over Haw River. The project is located between east of Witty Road (SR 2305) and Church Street Extension (SR 1001). The existing structure is a 3 span bridge (1@17', 1@40', 1@17') and is a steel I-Beam bridge supported by a timber deck with timber vertical abutments. The existing structure will be removed and replaced with a single span (1@100') 39" Box Beam with 4' end bent caps. Excavation beneath the bridge was kept to a minimum to produce as little impact as possible. Geotextile and rip-rap were utilized in an attempt to reduce stream bank erosion along the banks of the channel underneath the bridge. To avoid direct discharge of bridge storm water into Haw River, deck drains are not required for the proposed bridge. The run off from the bridge deck will be collected by inlets and discharged outside of buffer zone 2 into a preformed scour hole. Any stormwater discharge entering into the buffer will be at non-erosive velocities. Sungate Design Group, P.A.North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:NCDOT Hydraulics UnitAddress:General Project Information17BP.7.R.139WBS Element:Bridge ReplacementWBS Element:Joshua G. Dalton, PE, CPESCNCDOT Contact:919-707-6711905 Jones Franklin RoadRaleigh, NC 27606Contractor / Designer:919-859-2243gcail@ncdot.govRaleigh, NC, 27699-1590Address:4/1/2021RockinghamSummerfieldGalen Cail, PE1590 Mail ServiceRiver Basin(s): City/Town:0.5Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoWoods, Agriculture, UndevelopedHaw River16-(1)0.30.11Project DescriptionProposed ProjectCape FearNoneSupplemental Classification: Nutrient Sensitive Waters (NSW)Wetlands within Project Limits?
(Version 2.08; Released April 2018)TIP No.:17BP.7.R.139County(ies):Rockingham Page 2 of2Sheet No.Station & Coordinates (Road and Non Road Projects)Surface Water Body Riprap TypeDrainage Area(ac)Conveyance Structure19+25 -L- RT36.25206, -79.80825Preformed Scour Holes and Energy Dissipators0.8WBS Element:(1)Haw River4Highway Stormwater ProgramAdditional CommentsNorth Carolina Department of TransportationV10(fps)Energy Dissipator TypePSHSTORMWATER MANAGEMENT PLANFOR NCDOT PROJECTSBMP Associated w/ Buffer Rules?Pipe0.1Class 'B'Q10(cfs)Pipe/Structure Dimensions(in)0.5 Yes15* Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET 1 OF 6
PERMIT DRAWING
DATE: 04-09-2021
DHV
D
T
V
=
=
=
=
=
=
1300
1500
14
55
7
55
%
%
ADT
ADT
2013
2030
% *
DUAL = 4%* TTST =3%
FUNC CLASS = LOCAL
SUBREGIONAL TIER
BRIDGE NO. 18 OVER THE HAW RIVER ON
SR 1002 (SCALESVILLE ROAD)
P.EBRZ-1002(24)
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
DIVISION OF HIGHWAYS LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$CONTRACT:TIP PROJECT:VICINITY MAP
ROCKINGHAM COUNTY
COUNTY
GUILFORD
COUNTY
ROCKINGHAM
V =40MPHDET
MPH
GRADING, DRAINAGE, PAVING, AND STRUCTURE17BP.7.R.13917BP.7.R.139
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NALETTING DATE:
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
NCDOT CONTACT:
DIVISION 7
SIGNATURE:
P.E.
SIGNATURE:
P.E.
PROJECT ENGINEER
HYDRAULICS ENGINEER
PROGRAM MANAGER
DIVISION BRIDGE
TIM POWERS, PE
HYDRAULICS ENGINEER
ROADWAY DESIGN ENGINEER PLANS PREPARED BY:
2018 STANDARD SPECIFICATIONS
JOSH G. DALTON, PE
DAVID SIMPSON, PE
=
=
=
LENGTH ROADWAY TIP PROJECT
LENGTH STRUCTURE TIP PROJECT
TOTAL LENGTH OF TIP PROJECT 0.114 MILES
0.019 MILES
0.095 MILES
-L- POC Sta. 17+00.00
BEGIN PROJECT 17BP.7.R.139
-L- POT Sta. 23+00.00
END PROJECT 17BP.7.R.139
-L- Sta. 19+38.70
BEGIN BRIDGE
-L- Sta. 20+41.30
END BRIDGE
-L- Sta. 19+28.00
BEGIN APPROACH SLAB
-L- Sta. 20+52.00
END APPROACH SLAB
SR 1002 (SCALESVILLE ROAD)
-L-
H
A
W
RI
VE
R
-DRV1-
VERTICAL SSD*DESIGN EXCEPTION: SAG VERTICAL CURVE K
LIMITS
PROJECT
17BP.7.R.139
TO US 158
US 220 / NC 150TO
DETOUR ROUTE
-DRV1- POT Sta. 10+25.00
BEGIN CONSTRUCTION
38572.1.1 (B-4802)
38572.2.1 (B-4802)BRZ-1002(24)R/W & UTL.
CONST.17BP.7.R.139
THIS PROJECT WAS FORMERLY KNOWN AS B-4802
LICENSE NO. C-890
SUNGATE DESIGN GROUP, P.A.
905 JONES FRANKLIN ROAD
RALEIGH, NORTH CAROLINA 27606
TEL (919) 859-2243
ENG FIRM LICENSE NO. C-890
Prepared in the Office of Simpson Engineers & Associates for
GATE
84" CMP
Scalesville
2305
1001
23082309
2310
2307
2305
2455
2454
1002
2305
2390
2390
2306
1002
4951
4950
4953
4952
4954
4955
%
2925
2930
2934
2933
1002
2351
1001
2399
2479
2480
24812442
2946
2946
2948
2947
2957
2958
2962
2962
2960
2961
2959
2959
H AW
M
idw
ay
Wittys Crossroads
158
Scalesville1001
2351
IMPSON
NGINEERS
&SSOCIATESAES
www.simpsonengr.com
(919) 852-0598 (Fax)
(919) 852-0468
Cary, NC 27518
Suite 200
5640 Dillard Drive
LICENSE NO. C-2521
NAD 83/ NA 2011
0 50'25'50'
SCALE: 1"=100'
100'
DATE: 04-09-2021
SHEET 2 OF 6
PERMIT DRAWING
4
SKETCH SHOWING RELATIONSHIP OF BRIDGE TO PAVEMENT
-L- Sta. 19+38.70
BEGIN BRIDGE
-L- Sta. 19+28.00
BEGIN APPROACH SLAB
-L- Sta. 20+41.30
END BRIDGE
-L- Sta. 20+52.00
END APPROACH SLAB
FOR STRUCTURE PLANS SEE SHEETS S-1 THRU S-167/2/99SHEET NO.$$DATE$$HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJECT REFERENCE
Office of:
Prepared in the
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
17BP.7.R.139 - ROCKINGHAM 18
LICENSE NO. C-890
SUNGATE DESIGN GROUP, P.A.
SUNGATE DESIGN GROUP, P.A.
905 JONES FRANKLIN ROAD
RALEIGH, NORTH CAROLINA 27606
TEL (919) 859-2243
ENG FIRM LICENSE NO. C-890
S S SURFACE WATER
DENOTES IMPACTS IN
TO SR 2305 (WITTY RD)
EIP
SPIKE
RR
EXISTING R/W
EXISTING R/W60.00'WOODS
WOODS
18"
R
C
PEXISTING R/W
EXISTING R/W
6
0.0
0'
WOODS
WOODS13' GRAVELHAW RI
VERGATE
WOODS
WOODS
WOODS
SR 1002 (SCALESVILLE RD) 21' PAVED
(CHURCH STREET EXT)
TO SR 1001
CEASAR CONE III
WOODS
CEASAR CONE III
CEASAR CONE IIIJAMES TROVATO
FRANK MILLER
CEASAR CONE III
WOODS
WOODS
EIP
EIPEIP
84" CMP
PI Sta 15+62.56
L = 691.39'
T = 362.55'
R = 930.00'
-L-
-L-
-L- PC Sta. 12+00.00
-L- PT Sta. 18+91.40
-L- POT Sta. 25+18.30
-DRV1-25+0020+0015+00PI Sta 10+66.80
L = 72.17'
T = 36.80'
R = 150.00'
PI Sta 12+06.66
L = 58.23'
T = 30.47'
R = 80.00'
-DRV1- POT Sta. 10+00.00
-DRV1- PC Sta. 10+30.00
-DRV1- PT Sta. 11+02.17
-DRV1- PC Sta. 11+76.19
-DRV1- PT Sta. 12+34.41
-L- POT Sta. 22+00.00
-DRV1- POT Sta. 12+70.69
-L- POC Sta. 17+00.00
BEGIN PROJECT 17BP.7.R.139
-L- POT Sta. 23+00.00
END PROJECT 17BP.7.R.139
-L- POT Sta. 10+00.00
-L- POC Sta. 18+00.00
END OVERLAY/BEGIN GRADE
-L- POT Sta. 21+90.00
END GRADE/BEGIN OVERLAY
-DRV1- POT Sta. 10+25.00
BEGIN CONSTRUCTION
REMOVE
PSH
18"
TB
2GI
TB
2GI 2:12:1
D
( Not to Scale)
STANDARD 'V' DITCH
-L- STA. 20+60 TO 21+00 LT
Min. D=1 Ft.
DETAIL A
Ground
Natural
Ground
Natural
+04 RT
BEGIN SBG
(STRUCTURE PAY ITEM)
TO SHOULDER POINT (TYP.)
CLASS II RIP RAP
2 ELBOWS
15" W/
EST. 35 CY DDE
EST. 80 SY GEOTEXTILE
EST. 45 TONS RIP RAP
SEE DETAIL B
BANK STABILIZATION
EST. 30 CY DDE
EST. 60 SY GEOTEXTILE
EST. 35 TONS RIP RAP
SEE DETAIL B
BANK STABILIZATION
+04 LT
BEGIN SBG
LIMITS
EXCAVATION
( Not to Scale)
RIP RAP BANK STABILIZATION
-L- STA. 19+98 TO 20+21
-L- STA. 19+56 TO 19+77
DETAIL B
Grade
Ditch
2.0'
GEOTEXTILE
Type of Liner= CL II Rip-Rap
10'min.
1.0'min.RCP-IV 15"18"
EST 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
PIPE OR DITCH
OUTLET
(MINUS TUCK)
STND. ROLL WIDTH
AA
PLAN VIEW
SECTION A-A
NATURAL
GROUNDFILL SLOPEPSRM
2:1
2:1INFLOW
MIN. 1' TUCK
STATION 19+10 -L- RT
WITH GEOTEXTILE
LINER: CLASS B RIPRAP
D
B
DETAIL C
PREFORMED SCOUR HOLE
(MINUS TUCK)
STND. ROLL WIDTH
FOR CLARITY)
BASIN NOT SHOWN
(RIP RAP IN
SCOUR HOLE (PSH)
SQUARE PREFORMED
WITH NATURAL GROUND.
INSTALL LEVEL AND FLUSH
MATTING (PSRM)
PERMANENT SOIL REINFORCEMENT
D=1.5 Ft.
B=4.0 Ft.
EST. 55 CY DDE
SEE DETAIL A
STANDARD V DITCH
SEE SHEET 4 OF 6
ENHANCEMENT VIEW
NAD 83 NA 2011
F
F
F
F
F F
F
F
F
F
F
F
F
0 50'25'50'
SCALE: 1"=100'
100'
DATE: 04-09-2021
SHEET 3 OF 6
PERMIT DRAWING
4
SKETCH SHOWING RELATIONSHIP OF BRIDGE TO PAVEMENT
-L- Sta. 19+38.70
BEGIN BRIDGE
-L- Sta. 19+28.00
BEGIN APPROACH SLAB
-L- Sta. 20+41.30
END BRIDGE
-L- Sta. 20+52.00
END APPROACH SLAB
FOR STRUCTURE PLANS SEE SHEETS S-1 THRU S-167/2/99SHEET NO.$$DATE$$HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJECT REFERENCE
Office of:
Prepared in the
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
17BP.7.R.139 - ROCKINGHAM 18
LICENSE NO. C-890
SUNGATE DESIGN GROUP, P.A.
SUNGATE DESIGN GROUP, P.A.
905 JONES FRANKLIN ROAD
RALEIGH, NORTH CAROLINA 27606
TEL (919) 859-2243
ENG FIRM LICENSE NO. C-890
S S SURFACE WATER
DENOTES IMPACTS IN
705705705
705
706
706
706 706
7
0
6
706706706706706706
706
706
7
0
7
707707707707
707
7
0
7
7077077077077077077
0
8
708708 70870 8
708
708
7
0
8
7087087087087087087097097097097097097
0
9
709709 709709
7097
0
9
709
7
0
9709
709 709709709709709709
709
709
7
0
9
709
709709 709709709
710
710710710710710710710
710710710
710710
710
710710710710710710710710
710710 7107
1
0
710
7
10
7
10
710710710710710710
710
710710
710710710710
710
710710
710710710710
710
710
710710
710
711
711
711
711 711711711711711711
711711711711 711 7117117117117
1
1
711
711
711711
7117117117117
11711711
711711
711 711
711
711711
711
711
7
11
711711
711711711
711
712
712 712712712712712712712712712 712712712 712
7127127127
12
712712712712
712712712712712
712
713
713 713713713713713713713713713713 713713713
713
713713713
7137
1
3 713713713713713713713
714
714 714 714714714714714714714
714714
714714714714
714714
714714714714714 714714
714714
714714714714714
715
715 715 715715715715715715
715715
715715715715715
715715715
715715
715
715715715 715715
715
715
715716716
716
716
716
716 716716716716716716716
716716716 716
716716
716
716
716
717
717
717
717
717 717717717717717717717717717717
717
717
717717
717717
717
717 717718718718
718718 718718718
718
718718
718718
718 718718719 719719719719719719
719 720720
7
2
0
721
721721 722TO SR 2305 (WITTY RD)
EIP
SPIKE
RR
EXISTING R/W
EXISTING R/W60.00'WOODS
WOODS
18"
R
C
PEXISTING R/W
EXISTING R/W
6
0.0
0'
WOODS
WOODS13' GRAVELHAW RI
VERGATE
WOODS
WOODS
WOODS
SR 1002 (SCALESVILLE RD) 21' PAVED
(CHURCH STREET EXT)
TO SR 1001
CEASAR CONE III
WOODS
CEASAR CONE III
CEASAR CONE IIIJAMES TROVATO
FRANK MILLER
CEASAR CONE III
WOODS
WOODS
EIP
EIPEIP
84" CMP
PI Sta 15+62.56
L = 691.39'
T = 362.55'
R = 930.00'
-L-
-L-
-L- PC Sta. 12+00.00
-L- PT Sta. 18+91.40
-L- POT Sta. 25+18.30
-DRV1-25+0020+0015+00PI Sta 10+66.80
L = 72.17'
T = 36.80'
R = 150.00'
PI Sta 12+06.66
L = 58.23'
T = 30.47'
R = 80.00'
-DRV1- POT Sta. 10+00.00
-DRV1- PC Sta. 10+30.00
-DRV1- PT Sta. 11+02.17
-DRV1- PC Sta. 11+76.19
-DRV1- PT Sta. 12+34.41
-L- POT Sta. 22+00.00
-DRV1- POT Sta. 12+70.69
-L- POC Sta. 17+00.00
BEGIN PROJECT 17BP.7.R.139
-L- POT Sta. 23+00.00
END PROJECT 17BP.7.R.139
-L- POT Sta. 10+00.00
-L- POC Sta. 18+00.00
END OVERLAY/BEGIN GRADE
-L- POT Sta. 21+90.00
END GRADE/BEGIN OVERLAY
-DRV1- POT Sta. 10+25.00
BEGIN CONSTRUCTION
REMOVE
PSH
18"
TB
2GI
TB
2GI 2:12:1
D
( Not to Scale)
STANDARD 'V' DITCH
-L- STA. 20+60 TO 21+00 LT
Min. D=1 Ft.
DETAIL A
Ground
Natural
Ground
Natural
+04 RT
BEGIN SBG
(STRUCTURE PAY ITEM)
TO SHOULDER POINT (TYP.)
CLASS II RIP RAP
2 ELBOWS
15" W/
EST. 35 CY DDE
EST. 80 SY GEOTEXTILE
EST. 45 TONS RIP RAP
SEE DETAIL B
BANK STABILIZATION
EST. 30 CY DDE
EST. 60 SY GEOTEXTILE
EST. 35 TONS RIP RAP
SEE DETAIL B
BANK STABILIZATION
+04 LT
BEGIN SBG
LIMITS
EXCAVATION
( Not to Scale)
RIP RAP BANK STABILIZATION
-L- STA. 19+98 TO 20+21
-L- STA. 19+56 TO 19+77
DETAIL B
Grade
Ditch
2.0'
GEOTEXTILE
Type of Liner= CL II Rip-Rap
10'min.
1.0'min.RCP-IV 15"18"
EST 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
PIPE OR DITCH
OUTLET
(MINUS TUCK)
STND. ROLL WIDTH
AA
PLAN VIEW
SECTION A-A
NATURAL
GROUNDFILL SLOPEPSRM
2:1
2:1INFLOW
MIN. 1' TUCK
STATION 19+10 -L- RT
WITH GEOTEXTILE
LINER: CLASS B RIPRAP
D
B
DETAIL C
PREFORMED SCOUR HOLE
(MINUS TUCK)
STND. ROLL WIDTH
FOR CLARITY)
BASIN NOT SHOWN
(RIP RAP IN
SCOUR HOLE (PSH)
SQUARE PREFORMED
WITH NATURAL GROUND.
INSTALL LEVEL AND FLUSH
MATTING (PSRM)
PERMANENT SOIL REINFORCEMENT
D=1.5 Ft.
B=4.0 Ft.
EST. 55 CY DDE
SEE DETAIL A
STANDARD V DITCH
SEE SHEET 4 OF 6
ENHANCEMENT VIEW
NAD 83 NA 2011
F
F
F
F
F F
F
F
F
F
F
F
F
NAD 83
20+00 -L-19+00 -L--L-
S S SURFACE WATER
DENOTES IMPACTS IN
0 10'5' 10'
SCALE: 1"=20'
20'
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP.7.R.139-ROCKINGHAM 18 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DATE: 04-09-2021
SHEET 4 OF 6
PERMIT DRAWING
SPIKE
RR
WOODS
18" RCP13' GRAVELWOODS
WOODS
REMOVE
PSH
TB
2GI
TB
2GI
$$$$USERNAME$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$$$SYSTIME$$$$$$$DATE$$SHEET NO.PROJECT REFERENCE
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
Office of:
Prepared in the
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
PO Box 700
Fuquay-Varina, NC 27526
www.mottmac.com
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
17BP.7.R.139 - ROCKINGHAM 18
LICENSE NO. C-890
SUNGATE DESIGN GROUP, P.A.
SUNGATE DESIGN GROUP, P.A.
905 JONES FRANKLIN ROAD
RALEIGH, NORTH CAROLINA 27606
TEL (919) 859-2243
ENG FIRM LICENSE NO. C-8907/2/99710
720
730
740
750
10 11 12
700
710
720
PI = 12+00.00
EL = 716.78'
(+)0.6629%
VC = 100'
K = 76
(+)1.9769%
690
680
15 16 17 18 19 20 21 22 23 24 25
680
690
700
710
720
730
740
750
680
690
700
710
720
(+)0.3000%
EL = 709.70'
-L- STA. 20+60.00 LT
EL = 710.10'
-L- STA. 21+00.00 LT
(+)1.0000%
680
690
700
EL = 715.62'
BEGIN GRADE
STA. 10+25.00
EL = 717.96'
STA. 12+59.69
END GRADE
-DRV1-
STA. 18+00.00
EL = 717.17'
BEGIN OVERLAY
STA. 17+00.00
EL = 717.13'
BEGIN GRADE
END OVERLAY
-L-
STA. 21+90.00
EL = 718.34'
BEGIN OVERLAY
END GRADE
STA. 23+00.00
EL = 719.20'
END OVERLAY
L
END PROJECTBEGIN PROJECT
(STRUCTURE PAY ITEM)
EXCAVATION = 190 CY
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 4700
= 25
= 717.70
= 6500
= 100
= 718.70
= 4700
= 25
= 717.40
= 4-5-17
= 707.40
ELEV = 711'
EXCAVATION
(STRUCTURE PAY ITEM)
(NORMAL TO CAP) (TYP.)
SLOPE 2:1 (2 FT. THICK)
CLASS II RIP RAP
DATE: 7-1-2016
ELEV.=707.40'
NORMAL WS
BRIDGE
EXISTING
REMOVE
MIN. (TYP.)
3.5' KEY DEPTH
GP ELEV. = 717.74'
1 @ 100'; SKEW 60
W/4' DEEP CAPS
SINGLE SPAN 39" BOX BEAM
BRIDGE C STA. 19+90.0 -L-
SHEET 5 OF 6
PERMIT DRAWING
DATE: 04-09-2021
Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 19+56 to 19+86 -L- BANK STABILIZATION < 0.01 56 19+90 to 20+19-L- BANK STABILIZATION < 0.01 TOTALS*: 0.01 56 0 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 6OF 6 WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSROCKINGHAM COUNTY17BP.7.R.13938572.1.1NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS4-9-21