Loading...
HomeMy WebLinkAbout20080511 Ver 2_Monitoring Report Denial_20130406Merritt, Katie From: Merritt, Katie Sent: Wednesday, April 03, 2013 1:02 PM To: 'David Knowles' Subject: RE: RE: GES respones to DWQ comments Sounds good David. Thanl< You and have a great day, Katie From: David Knowles [mailto:juncusl yahoo.comi Sent: Wednesday, April 03, 2013 7:12 AM To: Merritt, Katie Subject: Re: RE: GES respones to DWQ comments Katie- My field notes for lagrange must be incomplete. I'm sure that we planted some containerized seedlings last spring but I can't find a record of it. So, what we are going to do is plant 300 cypress and 50 containerized river birch tomorrow. Both of these species are quite durable and should do well even with late planting. I will reestablish Plot 2 to within the 50 ft buffer. We will then submit the first annual report in December and an as built shortly. Thanks, David Knowles Sent from Yahoo! Mail on Android From: Merritt, Katie <I<atie.merritt @ncdenr.gov >; To: David Knowles <iuncusl @vahoo.com >; Cc: jrbecker <irbecl<er @bellsouth.net >; Subject: RE: GES respones to DWQ comments Sent: Thu, Mar 28, 2013 9:10:59 PM Hi David, Thank you for providing the cornrnents. I will take a look at there in detail next week when I get back to the office. However, I was able to take a quick glance over the comments and saw one thing I wanted to address. For the La Grange site, you state the following: To clarify, the entire Site has been planted fof an entire groi ring Season. 1 Should have been luore Specdf c 1rhen I used the term "Winter 2012 " as the planting date. More Specifically Siippleuiental plantings were last planted during January 28, 2012 thus one f ill growing season had been completed before the annual survey eras conducted These included planting river birch, cypress and black gum along the stream bank. Grazing pressure by deer, rabbits and beavers is intense at the LaGrange Site; (;E,S will continue to monitor the effect of grazing and remediate as needed. A BPDP for the LaGrange site was first provided to DWQ in February 2012 and approved on July 13, 2012. When we met with you on the LaGrange site last March 2012 it was our first visit since you had begun planting in 2010. You had stated that you had performed supplemental plantings in the Winter of 2011 due to browsing and drought conditions. It was noted during our site visit in March, that there were additional areas that would need more trees, especially within the very sandy portions of the site. Additionally, we stated that GES must plant additional trees closer to the stream bank if they wished to include this as a buffer bank. We identified areas within the first 10 -15 feet of Zone I of the Riparian Buffer as substantially lacking in trees. Due to the substantial amount of supplemental planting needed, DWQ did not consider the LaGrange site to be "planted" when we visited in March 2012. If GES performed the supplemental plantings requested by the DWQ, there should have been another supplemental planting period following our site visit in March 2012. Until DWQ receives the As Built Report citing the details of this remedial planting, DWQ cannot approve of the monitoring report that was submitted. Upon receipt of the As Built Report, I would like to make a visit out to the site. This is typical protocol for when I receive AsBuilt reports for mitigation banks. Sincerely, Katie From: David Knowles fmailtoauncusl!dvahoo.coml Sent: Thursday-, March 28, 2013 1:05 PM To: Merritt, Katie: Becker email Subject: GES respones to DWQ comments Katie- Here is a response to your comments. I have to teach class this afternoon and assume that you are not working Friday (Easter). So, I guess we can discuss via phone on Monday. Thanks, and have a safe and enjoyable Easter. David Knowles