HomeMy WebLinkAbout20210545 Ver 1_DCM Permit_20210622Permit Class Permit Number
NEW 79-21
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to CADD Properties, LLC., 6004 Percheron, Summerfield, NC 27358
Authorizing development in Brunswick County, adj. to Canal #1, at 105 Swordfish Dr., in
Holden Beach , as requested in the permittee’s application dated 3/11/21, including
attached workplan drawings (3), Pages 1-3 of 3 all dated 3/11/21.
This permit, issued on June 22, 2021 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2024
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bulkhead Removal and Replacement
1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan
drawings.
2) No backfill material shall be placed within 30 feet of the normal high water line, except that which will
be used to backfill the area behind the permitted bulkhead.
3) The temporary placement or double handling of fill materials within waters or vegetated wetlands is
not authorized.
4) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the
approved bulkhead alignment.
(See attached sheets for Additional Conditions)
CADD Properties, LLC. Permit No. 79-21
Page 2 of 3
ADDITIONAL CONDITIONS
5) All fill material to be placed below normal high-water level shall be confined behind the permitted
bulkhead.
6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure.
7) The bulkhead shall be constructed prior to any backfilling activities.
8) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or
other suitable materials approved by Division personnel.
9) All backfill material shall be clean and free of any pollutants except in trace quantities.
10) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start of
construction.
Sedimentation and Erosion Control
11) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
12) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed
immediately landward of the bulkhead cap immediately following completion of backfilling activities.
USACE Conditions
13) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish & Wildlife Service’s Guidelines, and strictly adhere to all requirements therein.
The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines2017.pdf.
General
14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
16) All debris associated with the removal or construction of the permitted development shall be contained
within the authorized project area and removed to an appropriate upland location.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
CADD Properties, LLC. Permit No. 79-21
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: Future development of the permittee’s property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Resources has authorized the proposed project under General Water
Quality Certification No. 4175 (DWR Project No. 2021-0545).
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2021-00650).
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.