Loading...
HomeMy WebLinkAbout260016_Compliance Inspection Routine_20210623Facility Number Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Certified Operator: Cj Ik- Heatii Back-up Operator: Location of Farm: Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: S Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: co-aal Arrival Time: Farm NamF-it? ftP Owner Name: fie&e INC Mailing Address: Physical Address: Facility Contact: cL v I7ttc Departure Time: j:50 Owner Email: Phone: County: Region: RP Title: Phone: Onsite Representative: ( Integrator: fltqijc2v Certification Number: (00 g607 Certification Number: Latitude: Longitude: oct irog7ute4 19i RobeYt Swine Design Current Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Wet Poultry Capacity Pop. Layer Non -Layer Dry Poultry Design Current Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle Design Current Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes NI No 0 NA ❑ NE El Yes It No ❑ NA ❑ NE ❑ Yes J No ❑ NA ❑ NE ❑ Yes] No ❑ NA ❑ NE ❑ Yes tcl No ❑ NA ❑ NE ❑ Yes I No ❑ NA ❑ NE Page 1 of 3 5/12/2020 Continued Facility Number: C.p - Date of Inspection: (p a% • og Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 1 IL" A Structure 2 Structure 3 Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes IV No ❑ NA ❑ NE ❑ Yes ] No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes c No ❑ NA ❑ NE ❑ Yes rV No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes h No ❑ NA ❑ NE 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ YesN:1No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) D PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): CDQ1tU e*ThT)Lzj(v. GC70 13. Soil Type(s):ak*t9v 114 j Cct,ncjof,. q(l/d °�zt'�' { �o)tr)rh 0-7 ta 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements 21. Does record keeping need improvement? If yes, check the appropriate box belo 4.bj� ❑ Waste Application El Weekly Freeboard ❑ Waste Analysis ❑ Soil alysis ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes No No • No • No No No pEl No ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE ❑ Other: ❑ Yes IX] No ❑ NA ❑ NE ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes rdeNI)r er Page 2 of 3 ®No El NA ❑NE yNo ❑NA ❑NE 2/4/2015 Continued Facility Number: 24. Did the facility fail to calibrate waste application equipment as required by the permit? 10r1/ 17 ❑ Yes 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate box(es) below. ce.g ❑ F cur to complete annual sludge survey ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ Yes ❑ Failure to develop a POA for sludge levels No 11 No ❑ NA ❑ NA ❑ NE ❑ NE 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ Yes ❑ Yes lyNo ❑NA ❑NE No ❑NA ❑NE IN No ❑ NA ❑ NE NI No ❑NA ❑NE NI No ❑NA ❑NE NINo ❑NA ❑NE �No No No ❑ NA ❑ NA ❑ NA O NE ❑ NE ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other co Use drawings of facility to better explain situations (use additional pages as necessary). records revi-ew2ct off git-e NO2:t-farm uSe,s Robb 3 Galt set. Note-. 5.ai-al pump-ed field �A Note:. caiibraubloN due bj al —field LoOt<s goo4 f41m h q fry ge4 bore ore N I 99oaNS COV4 ()Jilt or Ntri/ man. VJOTK IooKs Reviewer/Inspector Name: ;VW Reviewer/Inspector Signature: Page 3 of 3 Phone: Date: 111.np-(171r.7 m a3 al 2/4/2015