Loading...
HomeMy WebLinkAboutNCG170301_Emails RE Rescission Info_20210629Georgoulias, Bethany From: Georgoulias, Bethany Sent: Tuesday, June 29, 2021 11:33 AM To: Ward, Jonathan Cc: Meloy, Michael Subject: RE: [External] FW: Auria Troy Closure NPDES Stormwater Permit No. NCG170301 Attachments: NPDES- Rescission- Form-20210429-DEMLR-SW.PDF Hi, Jonathan, Thank you for letting us know. Please see the last section on this website below called "Rescind an Existing Industrial Permit". You'll need to fill out the attached form and send it to our office. If you have any questions about this process, please contact Michael Meloy, cc'd above. https://deg.nc.gov/about/divisions/energy-mineral-land-resources/nodes-industrial-stormwater Best regards, Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater D, E� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Ward, Jonathan [mailto:jonathan.ward@auriasolutions.com] Sent: Tuesday, June 29, 2021 9:37 AM To: laserfiche@ncdenr.gov; Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Subject: [External] FW: Auria Troy Closure NPDES Stormwater Permit No. NCG170301 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning, The Auria Troy plant will be closing permanently with a target date of July 315Y, 2021. Please advise what steps we need to take to close out our permit once we exit the building. There will be a new company moving into the building at some point with no affiliation to Auria. Thankyou Jonathan Ward Manufacturing Engineering Manager .UFO. Auria Troy Plant 163 Glen Rd Troy, NC 27371 Phone: +1 (910) 572-6103 nathan.ward(@AuriaSolutions.com Auria Albemarle 313 Bethany Road, PO Box 580 Albemarle, NC 28001 Office 704-983-8339 Fax 704-983-8492 www.auriasoIutions.com From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Tuesday, October 8, 2019 9:06 AM To: Ward, Jonathan <jonathan.ward@auriasolutions.com> Subject: Renewal COC for NPDES Stormwater Permit No. NCG170301 This email originated outside Auria: Do not open attachments or links unless you know the content is safe, forward suspicious emails as an attachment to infosec@auriasolutions.com Dear Permittee: Please see the attached new Certificate of Coverage No. NCG170301 for renewed coverage under Stormwater General Permit NCG170000 for this facility. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.) You must print a copy of the new NCG170000 General Permit from our Stormwater General Permits web page. In addition to the full permit, the most recent print package on the website includes revised Discharge Monitoring Report (DMR) forms and Qualitative Monitoring Report Forms. The General Permit authorizes discharges of stormwater, and it specifies your obligations with respect to discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all changes in the reissued permit. Your facility has six (6) months from receipt of the permit to update your Stormwater Pollution Prevention Plan (SPPP) to reflect any new permit requirements. When does electronic DMR (eDMR) reporting start, and does it affect this permit? If activities at this facility ever require analytical monitoring, eDMR will affect you. We are setting up our database with the outfalls that permittees submitted on-line and permit parameters. Permittees will receive notification when our eDMR system is ready for permit -holders to register and begin reporting monitoring data electronically. If you have any questions about the status, please contact Bethany Georgoulias at (919) 707- 3641 _ Your coverage under the General Permit is transferable only through the specific action of DEMLR. This permit does not affect the legal requirements to obtain other permits which may be required by the N.C. Department of Environmental Quality (DEQ), nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit please contact The Stormwater Program at (919) 707-9220. Sincerely, The NC DEQ Stormwater Program This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. LEGAL DISCLAIMER This Email message and any attachments may contain legally privileged, confidential or proprietary information. If you are not the intended recipient(s), or the employee or agent responsible for delivery of this message to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this E-mail message is strictly prohibited. If you have received this message in error, please immediately notify the sender and delete this E-mail message from your computer.