HomeMy WebLinkAbout20211041 Ver 1_Meeting Request Review_20210625 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20211041 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 6/25/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* NCDOT Kevin Hining
Contact Email Address* kjhining@ncdot.gov
Project Name* Replace Ashe Bridge 273 B-4016
Project Owner* NCDOT
Project County* Ashe
Owner Address: Street Address
801 Statesville Hwy
Address Line 2
City State/Rovince/Region
North Wilkesboro NC
Fbstal/Zip Code Country
28659 USA
Is this a transportation project?* (' Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below and include location information.*
Replace bridge 273 with another bridge. No site visit needed unless
requested by Dave.
Located at 36.496559,-81.509089, on Teaberry Rd, SR 1347, in
Lansing,Ashe County
Please attach the documentation you would like to have the meeting about.
Aerial photo of study area Ashe 273 B-
722.51 KB
4016.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature )/
CA( ` `YG I•fty
Submittal Date 6/25/2021
Reviewer Meeting Request Decision
Is a meeting required or is there more info needed?*
r Yes ( No
If rrore information is needed,please add comrrents for the errail notification below.