Loading...
HomeMy WebLinkAbout20211041 Ver 1_Meeting Request Review_20210625 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20211041 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 6/25/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* NCDOT Kevin Hining Contact Email Address* kjhining@ncdot.gov Project Name* Replace Ashe Bridge 273 B-4016 Project Owner* NCDOT Project County* Ashe Owner Address: Street Address 801 Statesville Hwy Address Line 2 City State/Rovince/Region North Wilkesboro NC Fbstal/Zip Code Country 28659 USA Is this a transportation project?* (' Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below and include location information.* Replace bridge 273 with another bridge. No site visit needed unless requested by Dave. Located at 36.496559,-81.509089, on Teaberry Rd, SR 1347, in Lansing,Ashe County Please attach the documentation you would like to have the meeting about. Aerial photo of study area Ashe 273 B- 722.51 KB 4016.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature )/ CA( ` `YG I•fty Submittal Date 6/25/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes ( No If rrore information is needed,please add comrrents for the errail notification below.