CONSTRUCTION SCHEDULE
1. Obtain all necessary permits and plan approvals. Erosion and Sediment Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land disturbing activities
occur. A copy of the E&SC permit, the COC and a hard copy of the plan must be kept on site, preferably in a permits box, and accessible during inspection.
2. Install gravel construction entrances first, then silt fences, reinforced silt fence outlets and wattles.
3. Finish clearing and grubbing any necessary areas on the lots as they are started.
4. Begin lot grading and excavation activities
5. Begin or continue with house construction activities.
6. Finish all rough grading and house construction.
7. Install driveways, walks and patios.
8. Begin fine grading of lot areas
9. Final grassing, mulching and stabilizing of lot. In most cases this will involve the installation of sod on the lot. The silt fence will remain in place until the lot is sodded or grassing is
stabilized and takes hold.
10. The contractor shall conduct self -inspections of the erosion and sedimentation control measures and complete the following combined self -inspection form found on the DEMLR website
https:Hfiles.ne. gov/nedeg/Energya/o2oMinerala/o20anda/o2OLanda/o2OResourees/Stormwater/NPDESa/o2OGeneral%2OPermits/DEMLR-C SW-Monitoring-Forms-Rev-August-8-2019.pdf.
Twelve months of complete inspection forms shall be kept on site and available for inspection at all times. It is recommended a copy be kept in a permits box. (GS 113A-54.1 (e), 15A
NCAC 04B.0131, NCGO1 Part III Sections A and B)
11. Self -inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch.
Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge
shall be installed at the project site for monitoring.
12. Inspection and final acceptance letters. When the project is complete, the permittees shall contact DEMLR to close out the E&SC Plan. After DEMLR informs the permittee of the project
close out, via inspection report, the permittee shall visit "deq.nc.gov/NCG01" to submit an electronic Notice of termination (e-NOT). A $100 annual general permit fee will be charged until
the e-NOT has been filled out.
VICINITY MAP (N.T.S.)
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION
Gravel Construction Entrance - The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site. This may require periodic
topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable
materials spilled, washed, or tracked onto public roadways.
Silt Fence - Sediment fences should be inspected at least once a week and after each rainfall event. Any repairs should be made immediately. Damaged or decomposed
fabric should be replaced promptly. Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed
sediment does not wash back against the fence. Adequate storage volume should be provided for behind the fence at tall times. Take care to not undermine the
fence during cleanout operations.
Sodding - The sod should be properly maintained to insure that the grass take holds in the areas being secured. The sod should be watered as necessary to maintain
adequate moisture in the root zone and prevent dormancy of the sod. The sod should not be mowed to close, since this could inhibit adequate growth and
stabilization of the root bed. The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
Grassing and Mulching - The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the
grassing has been placed, the area should be maintained as needed to insure that all areas are germinating properly. Any bare areas should be repaired, and
reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass, then a temporary grassing should be used until the
growing season permits the use of a permanent grass.
Wattles - Wattles shall be inspected after significant rainfall events. Rills or gullies upslope of the wattle and any undercutting is to be repaired. Sediment deposits that
impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height. Removed sediment shall
be deposited within the project in such a way that the sediment is not subject to erosion by wind or water.
Reinforced Silt Fence Outlet - Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet. Take
care to avoid undermining the fence during cleanout. Remove and replace stone as necessary as it becomes clogged with sediment. Remove all fencing materials
and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized.
General - All measures will be inspected and corrections made after runoff producing rainfalls, or at least once per week minimum. The builder will insure that the
construction activities on any particular lot do not adversely affect any of the installed erosion control measures. If lot construction dictates, measures will be
relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be
maintained as suggested in the erosion control manual. Sodding, seeding and mulching will be maintained to insure proper ground stabilizing cover.
Steel Post
Wire ties
8' Max. Standard Strength fabric with wire fence
6' Max. Extra strength fabric without wire fence Wire Fence
Steel Post
18-24"
L 24"
8" down & 4" forward along the tr inch
Filter Fabric
Backfill trench
and Compact
thoroughly
.:. Upslope
4
8" Min.
1
• Filter Fabric
Construction: CROSS SECTION VIEW
1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics.
2. Ensure that the height of the sediment fenced not exceed 24 inches above the round. (Higher fences may impound volumes of water
9 9 19 Y P
sufficient to cause failure of the structure)
Maintenance:
3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the
filter cloth only at a support post with 4 feet minimum overiap to the next post. 1. Inspect sediment fences at least once a week and after each 1 inch or greater
rainfall. Make an required repairs immediately.
4. Support standard strength filter fabric ei wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the Y q P Y
bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have a 2. Should the fabric a is sediment fence collapse, tear, decompose, or become
minimum 50 pound tensile strength. ineffective, replace tt promptly.
3. Remove sediment deposits p sure a to rove. a e care
o a a volume
5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Supports should be driven securely into the ground a P necessary P q �
minimum of 24 inches. for the next rain and reduce pressure on the fence. Take care to avoid
underminin
6. Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the filter fabric directly to posts. 4. Remove allg the fence during and unstable t
Wire or plastic zip ties should have a minimum of 50 pound tensile strength. the
materials and unsble sediment deposits and bring the
7. Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope from the barrier. area to grade and stabilize it after the contributing drainage area has been
8. Place 12 inches of fabric along the bottom and side of the trench. properly stabilized.
9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance.
10. Do not attach filter fabric to existing trees.
\NC -En vironm ental.jpeg
SILT FENCE
DATE: I I PAGE:
TOP OF SILT FENCE
MUST BE AT LEAST
ABOVE THE TOP OF
THE WASHED STOII�
STEEL FENCE P ST
WIRE FEN
HARDWARE CLQTH
FILTER OF
WASHED.
BURY WIRE FENCE AND
..\NC-Environmental.jpeg
CLOTH
4' N11N.
.T FENCE
FRONT VIEW
BURY WIRE FENCE,
FILTER FABRIC,
AND HARDWARE
STEEL FENCE POPT CLOTH IN TRENCH
SET MAX 2' APAR
MIN. 18" INTO SOLID
T FILTER FABRIC
GROUND
ON GROUND NOTES:
1.
Hardware cloth and gravel should overlay the sift fence at least 12 inches.
2.
Stone outlets should be placed on low elevation areas of silt fence and
based on field conditions.
MAINTENANCE:
1.
Per NCG-01, inspect outlet at lest once a week and after each 1 inch
or greater rainfall event. Complete any required repairs immediately.
BURY 6" OF UPPER EDGE O 5.
Freshen stone when sediment accumulation exceeds 6 inches.
FILTER FABRIC IN TRENCH
3.
Keep mesh free of debris to provide adequate flow.
4.
Remove sediment when haft of stone outlet is covered.
5.
Replace stone as needed to facilitate de -watering.
SECTION VIEW
SILT FENCE OUTLET
A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS
REQUIRED BY NCGS 113A-54.1 "IS AVAILABLE FOR USE. IT CAN BE
COMPLETED BY HAND OR COMPLETED AS AN EXCEL
SPREADSHEET.
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE
APPROVED EROSION AND
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT
SITE. RULE 15A NCAC 04B. 0131 STATES THAT DOCUMENTATION
SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH
MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH
MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN."
/
General Erosion Control Notes
1. Only the areas shown shall be disturbed.
2. All disturbed areas shall be grassed and mulched as soon as
possible and maintained until permanent cover is established.
Pursuant to G.S.113A(3), provisions for permanent ground cover
sufficient to restrain erosion must be accomplished for all
disturbed areas within 14 working days or 90 calendar days
(whichever is shorter) following completion of construction.
7e
III `■■�
�■�I
�■■Iii�
���
���
�■��
i-■�I
�■
i�:i�r_vtraiali�
t�rvmriw�i■
t�r_vnur_v��:an_vm�_��`�
t�r_vmm_wi�
t�r_vmm_w��
t�r_vmm_willr
t�r_vmm_w
LEGEND
FLOW DIRECTION
SILT FENCE
SILT FENCE OUTLET
CONSTRUCTION ENTRANCE
CURB INLET
\N C-Environ m ental.jpeg
OPE
Notes:
1. If needed, Tree Protection fencing should be installed along the buffer zone, wetland boundary and/or around
protected trees, providing a radius of at least 1.25 feet for each inch of trunk diameter.
2. Install Silt Fence on the low elevation sides of each lot. Install Silt Fence outlets shown on schematic/diagram and
field adjusted, if necessary, for placement at low points. If lots are contiguous and have different land owners or
builders, each lot should have individual Sift Fences.
3. Install required Silt Fence within 10 feet of property line to ensure there is no conflict with septic system. It is the
responsibility of the builder to ensure the installation of sediment control measures does not impact the septic
system and repair area(s).
4. At least one Construction Entrance/Exit is to be installed per lot.
5. Waste bins and other areas dedicated for managing building material waste shall be at least 50 feet away from
storm drain inlets or drainage ditches unless it can be shown that no other alternative exists. If this separation
cannot be achieved, these areas must be contained behind Sift Fence.
6. Inlets downstream of disturbances should be protected, streets should be swept when sediment from the
construction activity is present.
7. Details for Sift Fence, Silt Fence Outlets, Construction Entrances and other measures are provided on additional
sheets. Erosion and sediment control details are not drawn to scale.
TYPICAL LOT LAYOUT WITH CURB AND GUTTER
SODDING
LAY SOD IN A STAGGERED
PATTERN. THESTRI
TIGHTLY AGAINST EACH OTHER
DO NOT LEAVE SPACES AND DO
NOTIW r •V.N MASON'S
ITAPTROWEL
ASHA HANED
MASON'S TROWEL IS A HAN DV
TOOL FOR TUCKING THE
PIEG
ENDS AND TRIMMING PIECES.
�r
BUTTING -ANGLED ENDS
CAUSESBV
INCORRECT MATIC SOD CUTTERUTTER O-
MUST BE
MM MATCHED CORRECTLY.
CORRECT
L .rlr,4�I
ROLL SOD IMMEDIATELY TO WATER TO A BE PTH OF 4" MOWWHEN THE SOD IS
ACHIEVE FIRM CONTACT AS NEEDED. WATERWELL ESTABLISHED -IN-
WITHTHE SOIL AS SOON AS THE SOD IS WEEKS. SETTHEMOWER
LAID. HIGH (2'-3" ).
APPEARANCE OF GOOD SOD
SHOOTS - OR GRASS BLADES.
GRASS SHOULD BE GREEN AND
HEALTHY, M OWED AT A 2'I'
CUTTING HEIGHT.
THATCH - GRASS CLIPPINGS AND DEAD
LEAVES, UPTO-THICK.
ROOT ZONE- SOIL AND ROOTS SHOULD BE
1 YY'- .-THICK, WITH DENSE ROOT MAT
FOR STRENGTH.
Z 1 \ \� � ` _ _ i \ / \
t = 1 \ / \ \ \/ \\ \
' l W ?8 1 SILT FENCE OPEN SPX�tCE /\
_ \ (TYP.)
Z 224 os \
o A-__274
a'228 24200 C6 1 CONST CTION
-LIMIT Z(i�227 240 ?�41 WATTLE5 m9� \ \ \ GROUND STABILIZATION
2' \ � - - SITE AREA STABILIZATION EXCEPTIONS
\ Py I \ DESCRIPTION TIME FRAME
\29c \ \ REI SILT
ENCEE
OUTLET \ PERIMETER DIKES, 7 DAYS NONE
226 \ / \ I I \ SWA&ESLOPESHES
\
s
HIGH QUALITY 7 DAYS NONE
WATER ZONES
\ - - - PEN SPACE / /J \ (HQW)
1 SLOPES STEEPER 7 DAYS IF SLOPES ARE
THAN 3:1 10' OR LESS IN
LENGTH AND ARE
NOT STEEPER
/ THAN 2:1, 14
UNDISTURBED 50, BUFFER OFFSITE SEPTIC EASEMENT \ L - \ I DAYS ARE
29 ' FOR LOT 227 I( \ t� - - - / I ALLOWED
\ \ 1 SLOPES 3:1 OR 14 DAYS 7 DAYS FOR
\ FLATTER SLOPES GREATER
UNDISTURBED 50' BUF ER \ THAN 5IN
\ \ � LENGTTHAN H
ALL OTHER
AREAS 14 DAYS NONE(EXCEPT
WITH SLOPES FORPERIMETERS
FLATTER THAN 4:1 AND HOW ZONES)
Construction:
Maintenance:
1. Clear the entrance and exit area of all vegetation, roots, and other objectionable
1. Per NCG-01 inspect at least once a week and after each 1 inch or greater rainfall,
material and properly grade it.
make any required repairs immediately.
2. Place the gravel to the specific grade and dimensions shown on the plans, and
2. Maintain the gravel pad in a condition to prevent mud or sediment from leaving the
smooth it.
construction site. This may require periodic topdressing with 2 inch stone.
3. Provide drainage to carry water to a sediment trap or other suitable outlet.
3. Immediately remove all objectionable materials spilled, washed or tracked onto public
4. Use geotextile fabrics in order to improve stability of the foundation in locations
roadways.
subject to seepage or high water table.
CONSTRUCTION ENTRANCE / EXIT
Silt Sock/ Wattle Silt Sock/ Wattle NOTE:
FLOW�� 3Area to be FLOW 3�� Area to be 1. Other materials providing equivalent protection
Protected Protected against erosive velocities may be substituted for
use in silt socks or wattles.
12" Min. 2. Fill silt sock/wattle netting uniformly with compost
2" x 2" 12" Min. �� 2" x 2" to the desired length such that logs do not deform.
Stakes Stakes 3. Silt sock/Wattle(s) should be installed parallel to
and a minimum of 10 feet be and the toe of a
To 1/2 height of log
UNTRENCHED INSTALLATION
ISOMETRIC VIEW
Mulch or COmpost�
for Untrenched Socks
Sheet Flow -
Work Area
SECTION y
_ graded slope. Sift Sock/Wattle(s) located below
flat areas should be located at the edge of the
land disturbance. The ends of the silt
sock/wattle(s) should be turned slightly upslope to
<Trenchin
prevent runoff from going around the end of the
silt sock/wattle(s).
4. Oak or other durable hardwood stakes with a 2
inch x 2 inch cross section should be driven
vertically plumb, through the center of the silt
sock/wattle. Stakes should be placed at a
maximuminterval of 4 feet or a maximum interval
of 8 feet d the sift sock/wattle is placed in a 4 inch
. trench.
5. In the event staking is not possible (ie. when
sockstwattles are used on pavement) heavy
ENTRENCHED INSTALLATION*
-THISAPPLIGATION MAY NOT BE USED WITH COMPOST SOCKSSMALLERTHAN 12". concrete blocks Shall be used behind the silt
sock/wattle to hold it in place during runoff events.
MAINTENANCE:
1. Inspect silt sock/wattle at least weekly and after
h 1 i h t ina f II R
Area To Be Pr
- Silt Sock
Wattle
..\NC-Environmental.jpeg
eac nc or grea er ra. emove
accumulated sediment and any debris as
needed to allow for adequate flow.
2. Silt sock/Wattle must be replaced if clogged or
torn.
3. If ponding becomes excessive, the sift
sock/wattle may need to be replaced with a
larger diameter or a different measure.
4. Reinstall if damaged or dislodged.
5. Silt sockstwattles shall be inspected until land
disturbance is compete and the area above the
measure has been permanently stabilized.
ILT SOCK / WATTLE FOR PERIMETER AND INLET PROTECTION
COMPOST SOCK INITIAL FLOW RATES
tedl@Blpost Sock
8 Inch
(200
12 Inch
18 Inch
24 Inch
32 Inch
(750
Design Diameter
nm)
(300 nm)
(450 nm)
(600 nm)
nm)
Maximum Slope
600 Feet
750 Feet
1,000
1,300
1,650
Length (t27)
(183 m)
(229 m)
Feet
Feet
Feet
(305 m)
(396 m)
(500 m)
Hydraulic Flow
7.5
11.3
15.0
22.5
30.0
Through Rate
gpm/ft
gpm/ft
gpm/ft
gpm/ft
gpm/ft
(94
(141
(188
(281
(374
I/m/m)
I/m/m)
I/m/m)
I/m/m)
I/m/m)
PAGE 1 of 2
TOTAL DISTURBED ACREAGE: 2.01 ACRES
LOT EROSION CONTROL PLAN
FOR LOTS 216, 217, 222 & 242
IN
SINCLAIR SUBDIVISION
PHASE 5
FOR
H & H CONSTRUCTORS, INC.
LITTLE RIVER TWP. MOORE CO., N.C.
SCALE: 1"= 100' MAY 2021
GRAPHIC SCALE
-100 0 50 100 200 400
( IN FEET )
MOORMAN, I<IZER & REITZEL, INC. 115 BROADFOOTAVE. FAYETTEVILLE, N.C. 28305
PHONE (910) 484-5191 FAX (910) 484-0388 LICENSE #: F-0106
LAST SAVED:511012021 3:2I PM LAST PLOTTED:511012021 3:42 PM PLOTTED BY. Dennis Gilbert FILENAME: G�\CURRENT JOBS\T1 & T/ CONSTRUCTORS\13-1567-11 SINCLAIR - EC\PLANS\EC SINCLAIR PH 5-LOTS 216, 217, 222 & 242DWG