HomeMy WebLinkAboutNC0004952_correspondence_20090422Certified Mail 7005 1160 0004 9234 7685
Return Receipt to PEM Carter
April 22, 2009
PEMC09:16j
iicona
RECEIVED
APR 2 7 2009
2525 Blacksburg Road
Grover, NC 28073-9641
Carolina Star Worksite
ISO 9001, I5O/rS 16949,
DENR + WATER QU 1�nd15014001
POINT SOURCE BRANCH
NC Department of Environmental and Natural Resources
Division of Water Quality
1617 Mail Service Ctr.
Raleigh, NC 27699-1617
Dear Mr. Sledge:
Subject: Stormwater NPDES- NCS 000064 and WasteWater NPDES NC0004952
CNA Holdings Inc,; Ticona Polymers, Shelby Plant
2525 Blacksburg Road, Grover, NC 28073
This is to inform you that the following communications pertaining to the above EPA Permit
should be directed as follows:
Facility/Technical
PEM Carter, Env. Eng.
704-480-4900
pem. carter(cr�ticona. com
Authorized / Invoice
Lanny Duvall, Site Director
704-480-4980
lanny.duvall@celanese.com
Please correct your records, and communicate to others in need of this information. We request
the removal of all previous contacts for they are no longer employed at this facility. Thank you for
prompt attention to this request and if you should have any further questions, please feel free to
contact me at (704) 480-4900, or via email at pem.carter[a7ticona.com
Since7ely,
,aye &ILL
PEM Carter
Sr. Environmental Engineer
Ticona
Celanese
Ticona
A business of Celanese