HomeMy WebLinkAbout20140762 Ver 5_R-2915 E waterline installation_20210628
Wanucha, Dave
From:Hining, Kevin J
Sent:Saturday, June 26, 2021 12:07 PM
To:Wanucha, Dave
Subject:R-2915 E waterline installation
Attachments:R-2915 E waterline installation.pdf
Hey Dave,
Sorry for the delay ā Iām finally emailing you the plan sheet showing our proposed waterline installation on R-2915 E.
This is the site I spoke to you and Lori about 3 or so weeks back, where we plan to install a new waterline under the
creek. The banks on both sides are already rip rapped from years past, so we will move the rip rap to the side, and
excavate a trench down both banks. In the stream we will dewater a 10-15 ā reach, move the stream material to the
side, bury the water line in the stream and the banks. Then we will place the stream material back on top of the
waterline in the creek, and place the existing rip rap back onto the waterline on both banks. We will then turn the
water on. We will be sure and mat and seed any new ground disturbance. All told, we should have about 15ā of
temporary impacts from dewatering, and the project should be complete in just a couple of hours.
The attached plansheet shows the location of the new waterline on page 1 (R-2915 E, Station 820+50 right). The second
sheet shows a cross section of the waterline relocation.
Let me know if you need any additional information.
Thanks!
Kevin
Kevin Hining
Division 11 Environmental Supervisor
North Carolina Department of Transportation
828-386-7202 cell
kjhining@ncdot.gov
801 Statesville Rd.
PO Box 250
North Wilkesboro, NC 28659
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
_____________________________________________________________
1
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2