Loading...
HomeMy WebLinkAbout20140762 Ver 5_RE_ R-2915 E waterline installation_20210628 Wanucha, Dave From:Wanucha, Dave Sent:Monday, June 28, 2021 10:58 AM To:Hining, Kevin J Subject:RE: R-2915 E waterline installation_DWR Got it. 15’ of temporary impacts for water line installation and restoration. I’ll place the information in the project file for future reference. Thanks. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Hining, Kevin J <kjhining@ncdot.gov> Sent: Saturday, June 26, 2021 12:07 PM To: Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: R-2915 E waterline installation Hey Dave, Sorry for the delay – I’m finally emailing you the plan sheet showing our proposed waterline installation on R-2915 E. This is the site I spoke to you and Lori about 3 or so weeks back, where we plan to install a new waterline under the creek. The banks on both sides are already rip rapped from years past, so we will move the rip rap to the side, and excavate a trench down both banks. In the stream we will dewater a 10-15 ‘ reach, move the stream material to the side, bury the water line in the stream and the banks. Then we will place the stream material back on top of the waterline in the creek, and place the existing rip rap back onto the waterline on both banks. We will then turn the water on. We will be sure and mat and seed any new ground disturbance. All told, we should have about 15’ of temporary impacts from dewatering, and the project should be complete in just a couple of hours. 1 The attached plansheet shows the location of the new waterline on page 1 (R-2915 E, Station 820+50 right). The second sheet shows a cross section of the waterline relocation. Let me know if you need any additional information. Thanks! Kevin Kevin Hining Division 11 Environmental Supervisor North Carolina Department of Transportation 828-386-7202 cell kjhining@ncdot.gov 801 Statesville Rd. PO Box 250 North Wilkesboro, NC 28659 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2