HomeMy WebLinkAbout820090_Plan of Action_20181018cn cc cn LL CI L co Cf V 0) 0 LI— a) i V •L L N a) O z n_ ce Repair on the lagoon dike was started at approximately 11:00 am by Bland Grading & Hauling and technical assistance from Curtis Barwick of Barwicks Ag Services by putting sakrete around drain pipe and packing with clay. The inside berm was extended on into the lagoon to add reinforcement to the damaged area and sakrete applied to lower interior wall of repair. Repair was completed at 5:45 pm on 9/17/18. Notes Checked both lagoons prior to the storm. Levels were at 39" at that time. Spoke to Curtis Barwick and he notified DWQ of levels and that we were starting to pump out of #1 Lagoon in field #1 by opening hydrants F&G for fear of it failing. Pumping began at 7:45 pm. Breach was stopped temporarily with a door and stobs. Spoke to Kenneth Bland to come and repair the lagoon at 9:15 am. Notified Curtis Barwick and Brian Kennedy of the failure. DWQ was notified by Barwick. It is estimated by Barwicks Ag Services that #2 Lagoon lost between 500,000 - 600,000 gallons of effluent. Rain Received .9 inches 5.0 inches 15.0 inches a) o C O O a) U = + O = .,— 73 CU sin 0 m E H 3:30 PM 5:30 PM 6:30 PM Q ,— rn 10:30 AM O F— O N _IT CZ J co C(-) ACV _ O co 0 ca CVO d C 0 — m O a) O _j p7 cv J co ,— co Date 9/11/2018 9/14/20181 9/15/2018 O N CD N OD 9/18/2018 9/19/2018