Loading...
HomeMy WebLinkAbout20201815_17BP9R57_Hyd_DRN_PERMIT (06-24-2021)_20210625 1 ligilw ajill North Carolina Department of Transportation Sion Highway Stormwater Program .i. ':-T47-°. STORMWATER MANAGEMENT PLAN "'' (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: SF-280063 TIP No.: 17.BP.9.R.57 County(ies): Davidson Page 1 of 1 General Project Information WBS Element: SF-280063 TIP Number: 17.BP.9.R.57 MrProject Type: Bridge Replacement Date: 2/26/2021 NCDOT Contact: Daniel Dagenhart Contractor/Designer: Wood Environment&Infrastructure Address: NCDOT Highway Division 9 Address:2801 Yorkmont Road 375 Silas Creek Parkway Suite 100 Winston-Salem,NC 27127 Charlotte,NC 28208 Phone: 336-747-7800 Phone: 704-357-5599 Email:drdagenhart@ncdot.gov Email: richard.hiner@woodDlc.com City/Town: Lexin, ton County(ies): Davidson River Basin(s): Yadkin Peedee I� CAMA County? No Wetlands within Project Limits? Project Description Project Length(lin.miles or feet): 350 ft. I Surrounding Land Use: Forest&rural farmland j 1.1. Proposed Project MI Existing Site Project Built-Upon Area(ac.) 0.2 ac. ac. Typical Cross Section Description: (Approach)2-11'lanes with 6'shoulders (Approach)18'paved width(2-9'lanes)with 6'unpaved sloped shoulders (Bridge)2-12'lanes with 7'11"shoulders (Bridge)2-11'lanes(27.833 Ft curb-to-curb)with 2.9 ft shoulders Annual Avg Daily Traffic(veh/hr/day): Design/Future: 7480 Year:2041 Existing: 3080 Year: 2021 General Project Narrative: The existing single-span 40'7"bridge is being replaced with a proposed 55'single-span(21"cored-slab)structure. The bridge will be normal crown with 2%cross slopes,with (Description of Minimization of Water 11'travel lanes and 2'11"shoulders,27'10"clear width and 30'OTO width. Existing drainage patterns are being maintained. Runoff is being discharged as far from the stream Quality Impacts) as practicable. No deck drains are used and,since the roadway has a vertical curve that peaks in the middle of the bridge,a bridge approach drop inlet is provided at each corner of the proposed bridge. The two inlets on the west end of the bridge discharge to the north into a proposed v-ditch. The two inlets on the east end of the bridge discharge onto a riprap pad on the overbank and then into an existing stream. Bank protection is also provided along both sides of the stream. Waterbody Information Surface Water Body(1): Reedy Creek NCDWR Stream Index No.: 11-32-4 NCDWR Surface Water Classification for Water Body Primary Classification: Class C None Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) F See Sheet A.A For Index of Sheets F (OF STATE STATE PROJECT REFERENCE NO. NO. SHEETS / 1ST SHEET TOTOTALd • 1111-1� A_ ii•� ill A SeoD I I (S O I .i I—iI (I I' I-i \\7 .�\ )I " � Erit erpY� � /3'23'3 T S STATE ]PROJ.NO. F.A.PROJ.NO. DESCRIIFTION 3/ • 17BP.9.R.57 P.E. r, � 1� 17BP.9.R.57 R'W • ,,,,,L5� 17BP.9.R.57 CONST. oUz .,..0.,,, DAVIDSON COUNTY 1� = 0 ,SCam. I � tiutreYn CP\ A....5..9.:: - 0.tc,,,, vvt. .�� ey, 5p3 psz 1tov. : �,$r • 1636 • .101 LOCATION: BRIDGE 63 OVER REEDY CREEK 1 re, '�$<'- 1-CI:1 ,.._ 1,i� ON SR 1472 (WELCOME-ARCADIA ROAD) 1,,g1 v Q. 3i P • 419 :. TYPE OF WORK: GRADING, DRAINAGE, PAVING & STRUCTURE ` 3232 III ' �� 1 P\cK:t 1 rn ', 4,$ 1, Y WETLAND AND SURFACE WATER PERMIT IMPACTS cii) C(eeK / G' 1� .. mme ... l� CO 3.:...47:3 Q ci -0 r•tJ PROJECTS E l 1=C l 1� a� 1 3 6 ;;;! \ LOVATION 14 6p9 II / Certez V5 etb° S� 1%C Uzec` , age' 1g211 5 C4o% 11 ____ 4,-16 1Q�5 �eloo oIl / . ... 1� F - 64 10 —DR1-A-POT Sto. 10+94.73,, .l END CONST .1� C VICINITY NIAP BEGIN PROJECT 17BP . 9 . R . 57 �/ ° - L- Sta . 11 +00 . 00 OFF SITE DETOUR ROUTE \,.7, Z N . T . S . -DRl_A- in PT�s Sto. 10+59.74 rn ti o -DRl_A- PC Sto. /0+33.92 0 N ol. !( 1, o R N J 1 I I I I Q - L - SR 1472 I ' I I 'I , 1 (WELCOME -ARCADIA RDI ) ' _ T I L % 0V/ 4 I, ° TO OLD US 52 h. __ _ -- )-4 7 _c_ , TO NC 150 II : iI , - 1 , 1w ' E D PROJECT 17BP . 9 . R . 57'� 1 / BEGIN BRIDGE w - L - POT Sta . 12+42 . 88 i / V _ ;L -, Sta . 14+50 . 00 ti -DR/_A- POT Sta 10+00.00 = II I L -L- POT Sta./3+52.88 i '/ cc END BRIDGE - L - POT Sta . 13+00 . 13 /1 -DRl_A- DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PLANS PREPARED BY: PLANS PREPARED FOR: HYDRAULICS ENGINEER c.,) GRAPHIC SCALES DESIGN DATA PROJECT LENGTH DIVISION OF HIGHWAYS WOOv. DIVISION 9 ADT 2021 = 3,080 4021 STIRRUP CREEK DRIVE 50 25 0 50 100 - DURHAM, NC 27703 375 SILAS CREEK PARKWAY NO(n3?% ADT 2041 = 7,480 LENGTH ROADWAY PROJECT 17BP . 9 . R . 57 = 0 . 055 mi NC ENG F-1253 WINSTON SALEM, NC 27127 �� C� itilliplib\- 1111 _ ' ° 2018 STANDARD SPECIFICATIONS �Q� ��° PLANS K o° LENGTH STRUCTURE PROJECT 17BP . 9 . R . 57 = 0 . 011 mi P.E. % Q� } Eitel D = �0 SIGNATURE: 50 25 0 50 100 = * ; � {�} T % TOTAL LENGTH OF PROJECT 17BP . 9 . R . 57 = 0 . 066 mi RIGHT OF WAY DATE: CHRISTOPHER H. LEE, PE �A PROJECT ENGINEER ROADWAY DESIGN V -- 50 MPH NOVEMBER 26, 2019 ENGINEER ..e. • ' ''' ''© iiQ PROFILE (HORIZONTAL) o0 z * TTST = DUAL �� o p��Q 0 5 2.5 0 5 10 FUNC CLASS = LETTING DATE: DANIEL R. DAGENHART -64-69Z cm) T - - 11111 LOCAL APRIL 20, 2021 DIV 9 BRIDGEOPROGRAMTMANAGER PROFILE (VERTICAL) SUB-REGIONAL TIER - -64-(A �� J SIGNATURE: J� J f 0- PROJECT REFERENCE NO. SHEET NO. 0- Lc RAW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER WETLAND AND SURFACE WATER PERMIT IMPACTS F F PER W L IN TLANDS * * MECHANIZED CLEARING \N * * * * * * * * IN WETLANDS // PERMANENT DOCUMENT NOT CONSIDERED FINAL IMPACTSEAM UNLESS ALL SIGNATURES COMPLETED o wood. 04- 4021 STIRRUP CREEK DRIVE 2 DURHAM, NC 27703 NC ENG F-1253 DETAIL 1 DETAIL 2 SPECIAL LATERAL 'V' DITCH SPECIAL LATERAL BASE DITCH o DETAIL 3 DETAIL 4 (Not to Scale) (Not to Scale) o o o / TOE PROTECTION toScale BANK STABILIZATION (Inn. i'' e in ''Front oo (Not ) (Not to Scale) Natural Bed *`A o< Ditch N MARLIN & M W < Elevation Natural 3'1 g< Natural o< Fill LARRY & KATHLEEN MICHAEL ale Natural Natural Ground ?•/ D F\a'� Slope Ground •./ D F\a'e< Slope wv� C JUDY PARKER DB 2065 PG 1812 N 0, ove Ground Ground 946 PG 606 Natural ,-� s� p Min. D= 1 Ft. ti� Min. D= 1 Ft. Geotextile 6= 2 Ft. I ` b 'i d 2' Flatter or Flatter(TYP) '� d= 1 Ft. Geotextile b= 3.5 Ft. Geotextile Channel Bed -L- STA. 12+90 LT TO STA. 13+00 LT Length= 30 Ft. -L- STA. 11+25 LT TO STA. 12+40.52 LT (variable) CL I RIP RAP = 8 TONS / Type of Liner= Class "I" Rip-Rap Type of Liner= CL"II" Rip Rap - Keyed-In *-DRl_A- STA. 10+35 LT TO STA. 11+87.00 RT GEO = 15 SY (4)11 SITE 2 SPECIAL LATERIAL V DITCH-L- STA. 13+73 LT TO STA. 14+25 LT 2' LAT. BASE-DITCH / SEE DETAIL 1 / FROM STA. 11+25 RtTO STA. 11+45 Rt STA. 12+44 TO 12+55, STA. 12+84 TO 12+99 CL I RIP RAP = 42 TONS CL I RIP RAP = 13 TONS CL II RIP RAP = 26 TONS GEO = 80 SY (SEE DETAIL 2) GEO = 26 SY GEO = 54 SY I 8 TN CL "I" RR 8 SY GEOel") SITE SITE 4 "'(0 PIPE OUTLET DITCH 0o DISTURB TREES ONLY AS NEEDEDJAMES E CRAVER JR. STABILIZATION (DETAIL 5) \,RENAL & ARRY " N DB 2250 PG 2418 6 TN CL "I" RR f)ii,:a OUTSIDE OF SLOPE STAKES DANIEL G & JULIA R SWAIN LARRY MICHAEL FAMILY TRUST //V DITCH 1' MINIMUM 6 SY GEO o DB 1004 PG 593/ F A E if / / o . p `' ' / DB 2065 PG 1807 50 P 24 ., 4 0. '�� U — iEP H SE D A�1) ��� \ i 444 1--,,,,_ /1,. , ):i. I " A 4f 1 I ., ( EE DP AIL b) A8 V ■0� DI �{ rtF\4060-40re e��� i, WOODS 1 I '4" 1,''' R‘ 14 \114:\ • if kitV C 4 Bj._, 41 4 kl* k ' lip. 1 , I L2 /TING R w wag \ _` t \\�,� er Ate•., ,� w: �� 2' BAS AI CH (SEE DET• L 2) 45 . / , -4,-(.7) .____ 7a0 — =�— �` „j•��+,y,,, ! .. - s.o,,,._ . A., a r..iiaa �wf J — — r _ ' r �^s J __\ rb, \ \„, LEL- + �1� r.1..K�j:�i. 'y fa7l \ _�R�11`+„ , j'y'� ���(���_--__ bEC C 5 IR •C� 6� "�Vl. I 2 _ +r+ ! � ,�dl�% .- —__+��a`���I�' SEC a+e i�, I .\ �/ - V .at - — =".t— S_' tom. E L fa- - — -v. J51 � bb s.� — — � � ,�e�on���r�x,aiu._M. s�f�---' ir.� • - P y v ,•�■r x I 3.6'BST • �/ 2B 2G1�04o4 %f ,,,,,J I if;�g ��llllr1 /40 ,� 9, m" OLD US 5 �` WELCOME A CADIA ROA (SR 1472) ") / `\j 5' 'l! " Dl� �,,r llig % i _. i ' 2l .,p__ > %]I■ 1P 738 737 tit. %, /91F �� q � � am: , _ 24CM■ iWOOBS •/ // vLy11�. N�,ta.�lyt!p�'� '6(A ° a� �y�% / s L sEL I 3 — — 8" :K W ILL // -//5gb TOE P1ECTION _,�� )7 � i• g p � t I `/� 111,2 (SEE DETAIL 3) ��/� Tir:lirrDr0111 �11litI `i �_� ��� I f V / / .,/� WOODS / e/ /.: '/v . BK WI L r _ / \ WOO S ,bL • / / NMARK CRAVER / / �^ L� / i I bLEDB 1020 PG 172i /' - - ,_,- `1 / /I—�' ^ (0` i i' _ 0 ' AS NEEDEC SbL- HN BOND �°' CLASS "II" RIPRAP AND 1OUTSIDE OF SLOPE STAKES DB 2052 PG 1127 GEOTEXTILE FABRIC ���o. �/1, FILL IN EXISTING 0) ti( STEVEN HUNT i�;,k OUTLET DITCH / orv�P M DB 1167 PG 130 Rit 6 TN CLASS "I" RR SITE 3 6 SY GEO \Ai / JAMES E CRAVER JR. SL--OULDER BERM STA 12+2 01 TO STA 12+32.01 LT & RT DB 2256 PG 1426 / ww" -L- STA 13+11.01 TO -L- STA 13+16.01 LT & RT );' BANK STABILIZATIONDETAIL 5 DETAIL 6 (DETAIL 4) PIPE OUTLET DITCH STABILIZATION RIP RAP AT EMBANKMENT(Not to Scale) (Not to Scale)Natural Bed Elevation 10'min.-> \ -DR/_Aatural Natural aHGround Ground Ditch ��l.o'min 2' N 792506M E 1621031 THOMAS & AUDRA SOUTHER P/ Sto /0+47.49 Grade BL STA 10+73 58RT1' . ELEV.=730.06' DB 1736 PG 396 = 43` 3/� 14.3" (LT) RR SPIKE IN 24" MAPLE 1 D = /68` 3/' 0/.2" Geotextile GEOTEXTILEdio 0 L = 25.83/ Channel Bed (Variable) = Length= 2 Ft. a M co T /3.57' Type of Liner= 380 TONS,CL II Rip-Rap v J Type of Liner= CL I Rip-Rap - Keyed-In Geotextile= 284 sy M co M co STA. 12+29 CL I RIP RAP = 2 TONS STA. 12+44 TO 12+55, STA. 12+84 TO 12+99 z ° ^n R = 34.00 GEO = 3 SY / -66 -66 -69 -66 -66 fft - 66 66 - - 69 66 z fez _fA Wu_ H-f&Q V)-66 Z cn�PrL_ fAff}U f 0- PROJECT REFERENCE NO. SHEET NO. 0- Lc ROW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER WETLAND AND SURFACE WATER PERMIT IMPACTS /y// PERit)I ANDS L IN \li'\ r . . . MECHANIZED CLEARING IN WETLANDS DOCUMENT NOT CONSIDERED FINAL WU PERMANENT STR IMPACTSEAM UNLESS ALL SIGNATURES COMPLETED o wood. 0is 4021 STIRRUP CREEK DRIVE 1- DURHAM, NC 27703 NC ENG F-1253 DETAIL 1 DETAIL 2 SPECIAL LATERAL 'V' DITCH SPECIAL LATERAL BASE DITCHo / o DETAIL 3 DETAIL 4 (Not to Scale) (Not to Scale) o o TOE PROTECTION BANK STABILIZATION V) N. N Not to Scale)( (Not to Scale) Natural Bed Front*`.1 of Ditch N MARLIN & M W t Elevation Natural 3'1 e< Natural of Fill LARRY & KATHLEEN MICHAEL ode Natural Natural Ground '''../ � Slope Ground ?•� D �` ,�e< Slope z JUDY PARKER DB 2065 PG 1$12 N N t�\ a iitIil k Natural o �oQN Ground �.. F`�\SmD= 1Ft. Geotextile B= 2 Ft• M ` 'i d Ln d= 1 Ft. e �- b= 3.5 Ft. Geotextile Channel Bed -L- STA. 12+90 LT TO STA. 13+00 LT Length= 30 Ft. -L- STA. 11+25 LT TO STA. 12+40.52 LT CL I RIP RAP = 8 TONS N Type of Liner= Class "I" Rip-Rap Type of Liner= CL"II" Rip-Rap�aKeyed-In *-DR1_A- STA. 10+35 LT TO STA. 11+87.00 RT GEO = 15 SY SITE 2 SPECIAL LATERIAL V DITCH -L- STA. 13+73 LT TO STA. 14+25 LT 2' LAT. BASE-DITCH SEE DETAIL 1 FROM STA. 11+25 Rt TO STA. 11+45 Rt STA. 12+44 TO 12+55, STA. 12+84 TO 12+99 / CL I RIP RAP = 42 TONS CL I RIP RAP = 13 TONS CL II RIP RAP = 26 TONS GEO = 80 SY (SEE DETAIL 2) GEO = 26 SY GEO = 54 SY 8 TN CL "I" RR 8 SY GEO / el") SITE 4 �s SITE 1 "' PIPE OUTLET DITCH ` ) 1' 00DISTURB TREES ONLY AS NEEDED JAMES E CRAVER JR. STABILIZATION (DETAIL 5) . RENAE C & LARRY N DB 2250 PG 2418 6 TN CL "I" RR OUTSIDE OF SLOPE STAKES DANIEL G & JULIA R SWAIN LARRY MICHAEL FAMILY TRUST F BAILEY 6 SY GEO •, f /.- / DB 1004 PG 593 0 DB 2065 PG 1807 V-DITCH 1' MINIMUM `X ,�� , j— — o DB 2250 PG 2415 N DEPTH (SEE DETAIL 1) t / ; o RIPRAP Iiik ` I I r \ o (SEE DETAIL 6) ABr:V 'OU D DI . '� F\� ��� \g2�'� �1 WOODS N E AS T T ' \ C4 1� " / I I I I Nc 8\ EIR _ ' �R�CM P �r 040► 0 I • I _w EXISTING R/W -• .N A �,- _ _ —�� 2' BASE DITCH (SEE DETAIL 2) 16,1 � ..�� C GRE . �o�a��f r.,F %''-� '� �_ .�� vw�rt W 1 y 15" RCf� — w— w - 0' � ,� — — — 1 8"PVC _I 12"1RCP — ����1Gi'fe! a �� . _ �. ._ ff� EXIST. PIP �— — _/ V���- i= . ._wawa' ,. MIA M_ =I (� �� BOLLARD I \ 11 yID■ r r —TV — P \ 23.6'BST o �// 2B 2G1<0404> I �lyl f" i I =�— �� \� .. MOM OLD US 52 �� WELCOME ARCADIA ROAD (SR 1472) N ��Ij11 ^� ��� I N '� 2" RCP A__ 0 2B 2GI<040'' lilt 'rAfia— r'�� ; 2: iy i _ RIPRAP . — 81 _� �Si?x t � �f1 S 4 i � ' 1 _ — _ / _ — —c- - - - — — — — j��- _ 4 PL GREU TL-3 1�,i As�./ tar • 8 — —c / I — G may a�.. t r it L� :_ \ 24" CM WOODS ./ i LLgkst _ G �!,!r - — — urr 8" BK WALL / ��// � W EXISTING R/W y���' iiU���/in i '44♦�0 �� •.- ��� 1 I (=Pr / "� //j UY N �S°I5'22' TOE PROTECTION ��� 4 4 (SEE DETAIL 3) R PAW ,�Q40� 1 1 / w �`�., 111,29, /� Am MIT e� ,+ 8" BK WALL ��j ---- WOODS I f i / / / \./ ai / `\ WOODS / I MARK GRAVER Q/PP / o DB 1020 PG 1721 / 6)' �� _, i JOHN BOND °• /\ �� CLASS "II" RIPRAP AND 7 �" DIST i' : TREES ONLY AS NEEDEC '.�` DB 2052 PG 1127 OUTSI D E OF SLOPE STAKES 1 GEOTEXTILE FABRIC + �°� �°j STEVEN HUNT �' FILL IN EXISTING OUTLET DITCH P^-) DB 1167 PG 130 2 b TN CLASS I RR SITE 3 /// / 6 SY GEO JAMES E CRAVER JR. Wl \ SHOULDER E2 B2 Ol TOERM STA 12+32.01 LT & RT / DB 2256 PG 1426 ti -L- STA 13+11.01 TO -L- STA 13+16.01 LT & RT BANK STABILIZATION DETAIL 5 DETAIL 6 (DETAIL 4) PIPE OUTLET DITCH STABILIZATION RIP RAP AT EMBANKMENT (Not to Scale) (Not to Scale) Natural Bed Elevation 10'min.-i- -DR/-A atural Natural B M Ground Ground Ditch ��l.o'min. 2' N 792506 E 1621031 THOMAS & AUDRA SOUTHER P/ Sto 10+47.49 Grade BL STA 10+73 58RT p6 1736 PG 396 A = 43` 3/' 14.3" (LT) 1, GI ELEV.=736e06' �, RR SPIKE IN 24" MAPLE D = 168` 3/' 0/.2" Geotextile < GEOTEXTILE 0 L = 25.83' Channel Bed (Variable) CD = Length= 2 Ft. p M co T /7.57 Type of Liner= 380 TONS,CL II Rip-Rap v J Type of Liner= CL I Rip-Rap - Keyed-In Geotextile= 284 sy M co M co STA. 12+29 CL I RIP RAP = 2 TONS STA. 12+44 TO 12+55, STA. 12+84 TO 12+99 z ° ^n R = 34.00 GEO = 3 SY / -09 fPr -* - -04 -04 fez _fA �_09_ _e-6 Wu_ H-f&Q cn{frZ cn�PrL_ �-(79 r o- PROJECT REFERENCE NO. SHEET NO. L j R'W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER WETLAND AD SURFA RFAZ WAT ' ERMIT IMPACTS i \ / / • , . /F PER WETLANDS L IN I , / r33 • : :. * MECHANIZEDDLANDSRING \\?, , PERMANENT STREAM DOCUMENT NOT CONSIDERED FINAL SI T E 2 \\\� IMPACTS UNLESS ALL SIGNATURES COMPLETED , ',j3 / V . WO 0 d. \, 4021 STIRRUP CREEK DRIVE D URHAM, NC 27703 ,_)3 NC ENG F-1�� \\ 253 3 SITE 1 v �v ` i - / _,_c6m,\\ 1 S I T E 4 \C \ c ; N- ABOV - CRO .� \ D D . , 4:11\ i /- \ 2 c / , - - \ , A\ - __ \ E:i , -''' ,__\ �� W O - \ CASV \ T 0 A I .-� .. L—CP \ \ s. — \ I141 .• /kIPRAP V. \040J MIL 41.11181 PVC ,_,,,,,„.____PR, - !,J .- 7 - , _,..,_....... w . . . . . -NENN ---- 1 otolopircol r=.4 tri wilt*..,____4.;,i ivilii 1\ -Ilackt."\ Aw*. - ww.) \\ C_________M?__-___ irt Il ale 1 0,1100.00,..., 1 'T FP.Ilr% ritillirr - W c\._ <0404 . 4110 - ir,- - A r // , , �r 1 z1� � UILIMM IVATEfIllPI � . ...40, ...„.„,,„,,, C,0407> 4m1 o triliNil rellireTk 1 ir 0 04 0 �� !�►�►1 � �� of ►-�-���,_ _G RE U T L-3 �141111►�-.� r �/-.�� :::::::::,,,kli:' Iv gi 03 *Ng 1 pp 4 A A : -GREU - _ _ _ - - Ar'' 7 C\.. Im I,� i�� ��-rtitti�t � -- r - r ,90 tr G ifirtirAkierfiftt ._- , _ _ _ — 2 afe F6-1 S I T E 3 /--40 ,, i 1,L, '4.i grarittiOilli 111,111 / AS itiki -, *4 4f' K04o6 , , M MIT il WOODS I j3 ' //(81 ---,, - - - - - H. , , - ',i --3 JAIVES E CAVER JRo / \Oil D3 2256 PG I 4 2 6 y \ / \/ CO / 4- 4- I , Laeo_i 4-4 *44 - WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 LT. 13+47-14+06 Driveway,30"Pipe,&Waterline <0.01 <0.01 2 LT. 13+20-13+40 Driveway,30"Pipe,&Waterline <0.01 <0.01 3 12+56-12+83 Bridge/Bank Stabilization <0.02 _ 89.00 4 12+54-12+89 Waterline Installation <0.01 3.00 (Temporary Impacts associated with Site 4 fall entirely within the footprint of Site 3) TOTALS*: <0.01 0.00 0.00 <0.01 0.00 1 <0.02 <0.01 89 3.00 0.00 *Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 02/26/2021 DAVIDSON 17BP.9.R.57 Revised 2018 Feb SHEET 1 OF 1