Loading...
HomeMy WebLinkAboutNCS000453_Indian Trail Self Audit Report_20210616MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) PROGRAM AUDIT REPORT NPDES PERMIT NO. NCS000453 INDIAN TRAIL, NORTH CAROLINA 315 MATTHEWS-INDIAN TRAIL ROAD Audit Date: 02/17/2021 Report Date: 03/02/2021 North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 9th floor 1612 Mail Service Center Raleigh, NC 27699-1612 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 (This page intentionally left blank) Audit Date: 02/17/21 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 TABLE OF CONTENTS AuditDetails..................................................................................................................................................1 PermitteeInformation..................................................................................................................................2 SupportingDocuments................................................................................................................................. 3 Construction Site Runoff Controls................................................................................................................4 Post -Construction Site Runoff Controls........................................................................................................7 Appendix A: Supporting Documents Appendix B: Photograph Log DISCLAIMER This audit consists of an evaluation of program compliance with the issued permit and implementation of the approved Stormwater Management Plan. This audit report does not include a review of all program components, and program deficiencies in addition to those noted may be present. The permittee is required to assess program progress and permit compliance, and to implement the approved Stormwater Management Plan in accordance with the issued permit. Audit Date: 02/17/21 ii MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 This page intentionally left blank Audit Date: 02/17/21 iii MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Audit Details Audit ID Number: Audit Date(s): NCS000453_Indian Trail MS4 Audit_2019/2020 March 2, 2021 Minimum Control Measures Evaluated: ❑ Program Implementation, Documentation & Assessment ❑ Public Education & Outreach ❑ Public Involvement & Participation ❑ Illicit Discharge Detection & Elimination ❑X Construction Site Runoff Controls — No delegated Sediment and Erosion Control Program ❑X Construction Site Runoff Controls — Delegated Sediment and Erosion Control Program ❑X Post -Construction Site Runoff Controls ❑ Pollution Prevention and Good Housekeeping for Municipal Operations ❑ Total Maximum Daily Loads (TMDLs) Field Site Visits: ❑ Municipal Facilities. Number visited: Choose an item. ❑ MS4 Outfalls. Number visited: Choose an item. ❑ Construction Sites. Number visited: Choose an item. ❑ Post -Construction Stormwater Runoff Controls. Number visited: Choose an item. ❑ Other: Number visited: Choose an item. ❑ Other: Number visited: Choose an item. Inspector(s) Conducting Audit Name, Title Orsanization Audit Report Author: Date: Signature Audit Report Author: Date Signature Audit Date(s): 02/17/2021 Page 1 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Permittee Information MS4 Permittee Name: Permit Effective Date: Permit Expiration Date: Date of Last MS4 Inspection/Audit: City, State, ZIP: Co-permittee(s), if applicable: Permit Owner of Record: Primary MS4 Representatives Participating in Audit Name, Title Organization MS4 Receiving Waters Waterbody Classification Impairments Audit Date(s): 02/17/2021 Page 2 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Supporting Documents Item When Provided Number I Document Title I. (Prior to/During/After) Post -Construction Storm Water Ordinance https://www. i n d is ntra i l.org/180/Post-Construction-Sto rmwater-0 rd i n a n ce 2 Unified Development Ordinance https://www.indiantraii.org/190/Unified-Development-Ordinance Stormwater Phone Line 3 https://www.indiantraii.org/298/Stormwater-Services Audit Date(s): 02/17/2021 Page 3 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Construction Site Runoff Controls Staff Interviewed: (Name, Title, Role) Program Delegation Status: ❑ The permittee has a delegated Sediment and Erosion Control Program and implements the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 components of this minimum measure (complete the permit citation and SPCA citation sections). ❑X The permittee does not have a delegated Sediment and Erosion Control Program and relies on DEMLR to comply with the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 components of this minimum measure (complete only the permit citation section). Permit Citation Program Requirement Status Supporting Doc No. II.E.3 Construction Site Runoff Controls The permittee provides and promotes a means for the public to notify the (NPDES Permit No. appropriate authorities of observed erosion and sedimentation problems (e.g., .•df Udi NCS000435) promoting the existence of the DEQ DEMLR "Stop Mud" hotline). Comments (Describe how provided and promoted) Town has a stormwater hotline and utilize this for all stormwater and active construction issues. Residents have used this line to notify Town of erosion issues as well. The Town will start promoting NC DEQ hotline. SPCA Citation I Delegated Program Requirement Status Supporting Doc No. § 113A-60 Local The permittee has adopted an ordinance or other regulatory mechanism to enforce erosion and Partial the erosion and sedimentation control program. sedimentation control programs (a) If yes, the ordinance meets or exceeds the minimum requirements of the Not SPCA. Applicable If yes, the ordinance applies throughout the corporate limits of the permittee. Not [Permit Part I.D] Applicable Town does have an adopted ordinance that discusses erosion and sedimentation control. Town delegates NCDEQ to permit any sites greater than an acre. § 113A-60 Local erosion and The permittee collects a fee paid by each person who submits an erosion and Not sedimentation sedimentation control plan. Applicable control programs (d) Audit Date(s): 02/17/2021 Page 4 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Construction Site Runoff Controls Comments (indicate the fee amount, if applicable) § 113A-60 Local Has any person initiated a land -disturbing activity (within the permittee's erosion and jurisdiction) for which an erosion and sedimentation control plan is required in the No --- sedimentation absence of an approved plan? control programs (e) If yes, the permittee has notified the North Carolina Sedimentation Control Not Commission of all such cases. Applicable Has the permittee determined that a person engaged in a land -disturbing activity Not has failed to comply with an approved erosion and sedimentation control plan? Applicable If yes, has the permittee referred any such matters to the North Carolina Not Sedimentation Control Commission for inspection and enforcement? Applicable Comments § 113A-61 Local The permittee reviews each erosion and sedimentation control plan submitted to approval of erosion them and notifies the person submitting the plan that it has been approved, Partial 1 and sedimentation approved with modification, or disapproved within 30 days of receipt. control plans The permittee only approves an erosion and sedimentation control plan upon determining that it complies with all applicable State and local regulations. Yes --- The permittee has disapproved of an erosion and sedimentation control plan in order to protect riparian buffers along surface waters. No --- If yes, the permittee notified the Director of the Division of Energy, Not Mineral, and Land Resources within 10 days of the disapproval. Applicable The Town requires plans for small sites if it feels it's warranted based on location, topography, geography, etc. § 113A-61.1 Inspection of land- The certificate of approval of each erosion and sedimentation control plan disturbing activity; approved by the permittee includes a notice of the right to inspect. Yes 1 notice of violation (a) The permittee provides for inspection of land -disturbing activities to ensure compliance with the SPCA and to determine whether the measures required in an Partial erosion and sedimentation control plan are effective. Per UDO and Post -Construction, any Town representative has the right to inspect any construction activities. Contractors are also told in preconstruction meetings that the Town will assist the State in onsite inspections, and if we see sites not adhering to the standards of the State. The State will be notified and also the Contractor. Audit Date(s): 02/17/2021 Page 5 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Construction Site Runoff Controls § 113A-61.1 When the permittee determines that a person engaged in land -disturbing activity Inspection of land- has failed to comply with the SPCA, the Permittee immediately issues a notice of Partial 2 disturbing activity; violation upon that person. notice of violation Each notice of violation issued by the permittee specifies the date by which the (c) person must comply. Partial Each notice of violation issued by the permittee informs the person of the actions Not that need to be taken to comply. Applicable Please see previous comments. The Town will notify the State if we see site issues that are not meeting State standards. If site is less than an acre then our UDO allows use to issue fines for non-compliance work. § 113A-64 Penalties Does the permittee issue civil penalties as part of the erosion and sedimentation program? Yes The Town can issue civil penalties for sites permitted by the agency based on existing ordinances. Audit Date(s): 02/17/2021 Page 6 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Post -Construction Site Runoff Controls Staff Interviewed: (Name, Title, Role) Audit Date(s): 02/17/2021 Page 7 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Post -Construction Site Runoff Controls Implementation (check all that apply): 0 The permittee implements the components of this minimum measure. ❑ The permittee relies upon another entity to implement the components of this minimum measure: ❑ The permittee implements the following deemed -compliant program(s), which meet NPDES MS4 post -construction requirements for the areas where implemented and in compliance with the specific program requirements as provided in 15A NCAC and noted below (Complete Session Law 2006-246 section below): ❑ Water Supply Watershed I (WS-1) — 15A NCAC 213.0212 ❑ Water Supply Watershed 11 (WS-11) — 15A NCAC 26 .0214 ❑ Water Supply Watershed III (WS-III) —15A NCAC 26 .0215 ❑ Water Supply Watershed IV (WS-IV) —15A NCAC 213.0216 ❑ Freshwater High Quality Waters (HQW) —15A NCAC 2H .1006 ❑ Freshwater Outstanding Resource Waters (ORW) —15A NCAC 2H .1007 ❑ Neuse River Basin Nutrient Sensitive (NSW) Management Strategy —15A NCAC 2B .0235 ❑ Tar -Pamlico River Basin Nutrient Sensitive (NSW) Management Strategy —15A NCAC 2B .0258 ❑ Randleman Lake Water Supply Watershed Nutrient Management Strategy —15A NCAC 2B .0251 ❑ Universal Stormwater Management Program —15A NCAC 2H .1020 Ordinance(s) (check all that apply): The permittee utilizes the following ordinances and/or regulatory authority to fulfill post construction minimum measure program requirements throughout the MS4 permitted area (check all that apply): ❑ DEQ model ordinance 0 MS4 designed post -construction practices that meet or exceed 15A NCAC 02H .1000. ❑ DEQ approved comprehensive watershed plan ❑ DEQ approved ordinance for a deemed -compliant Program (see list above) Instructions: For MS4s not implementing a S.L. 2006-246 deemed -compliant program, complete only the Permit Citation section below. For MS4s implementing a S.L. 2006-246 deemed -compliant program, complete the Session Law 2006-246 section below. If the MS4 does not implement a deemed -compliant program throughout the entire MS4 permitted area, then complete the Permit Citation section below for the permitted area(s) not covered under the S.L. 2006-246 deemed -compliant program. Session Law 2006- supporting 246 Program Requirement Status Doc No. Audit Date(s): 02/17/2021 Page 8 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Post -Construction Site Runoff Controls Deemed -Compliant The permittee implements deemed -compliant Program requirements in Program(s) accordance with the applicable 15A NCAC rules. Yes 1 The permittee implements deemed -compliant Program requirements throughout the entire MS4 area (If not also complete the Permit Citation section below.) Yes 1 The permittee applies deemed -compliant Program requirements to all federal, state and local government projects within the permitted MS4 area who do not Yes 1 have their own NPDES stormwater permit. The permittee included deemed -compliant Program reporting in their MS4 Annual Reports. Yes 1 The permittee included deemed -compliant Program implementation in their Stormwater Management Plan. Yes 1 No Comment Permit Citation Program Requirement Status supporting Doc No. II.F.2.a The permittee maintained an ordinance or other regulatory mechanism designed Legal Authority to meet the objectives of the Post -Construction Site Runoff Controls Stormwater Yes Management Program. If yes, the ordinance applies throughout the Indian Trail corporate limits of the permittee (Verify permit coverage area listed in Part I.D of permit and modify Yes 1 accordingly). The permittee has the authority to review designs and proposals for new development and redevelopment to determine whether adequate stormwater Yes 1 control measures will be installed, implemented, and maintained. The permittee has the authority to request information such as stormwater plans, inspection reports, monitoring results, and other information deemed necessary to evaluate compliance with the Post -Construction Stormwater Management Yes 1 Program. The permittee has the authority to enter private property for the purpose of inspecting at reasonable times any facilities, equipment, practices, or operations Yes 1 related to stormwater discharges. No Comment II.F.2.b Stormwater Control The permittee utilizes strategies which include SCMs appropriate for the MS4. Yes 1 Measures (SCMs) SCMs comply with 15A NCAC 02H .1000. Yes 1 Audit Date(s): 02/17/2021 Page 9 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Post -Construction Site Runoff Controls Comments II.F.2.c The permittee conducted site plan reviews of all new development and Plan Reviews redeveloped sites that disturb greater than or equal to one acre (including sites that disturb less than one acre that are part of a larger common plan of Yes 1 development or sale). If yes, the site plan reviews addressed how the project applicant meets the performance standards. Yes 1 If yes, the site plan reviews addressed how the project will ensure long-term Yes 1 maintenance. No Comment II.F.2.d The permittee maintained an inventory of projects with post -construction Inventory of Projects structural stormwater control measures installed and implemented at new Yes --- development and redeveloped sites. The inventory included both public and private sector sites located within the permittee's corporate limits that are covered by its post -construction ordinance Yes --- requirements. Town utilizes a plan review software (Infovision: Evolve) that stores and houses project data. Town also scans and keeps a copy of all recorded documents stated above. II.F.2.e The permittee provided mechanisms such as recorded deed restrictions and Deed Restrictions protective covenants that ensure development activities will maintain the project Yes 1 and Protective consistent with approved plans. Covenants No Comment II.F.2.f The permittee implemented or required an operation and maintenance plan for Mechanism to the long-term operation of the SCMs required by the program. Yes 1 Require Long-term Operation and The operation and maintenance plan required the owner of each SCM to perform Maintenance and maintain a record of annual inspections of each SCM. Yes 1 Annual inspection of permitted structural SCMs are required to be performed by a qualified professional. Yes 1 No Comment Audit Date(s): 02/17/2021 Page 10 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Post -Construction Site Runoff Controls II.F.2.g The permittee conducted and documented inspections of each project site covered Inspections of under performance standards, at least one time during the permit term (Verify this Partial 2 Structural is a permit condition in Part II.F.2.g of permit and modify accordingly). Stormwater Control Before issuing a certificate of occupancy or temporary certificate of occupancy, the Measures permittee conducted a post -construction inspection to verify that the permittee's performance standards have been met or a bond is in place to guarantee Yes 2 completion (Verify this is a permit condition in Part II.F.2.g of permit and modify accordingly. The permittee developed and implemented a written inspection program for SCMs installed pursuant to the post -construction program(Verify this is a permit Yes 1 condition in Part II.F.2.g of permit and modify accordingly. The permittee documented and maintained records of inspections. No --- The permittee documented and maintained records of enforcement actions. Yes --- Site inspections are not documented on paper. Planning Department does not issue a final C/O until both Engineering and Planning staff provide in writing that their individual inspections are completed and site complies with all Town standards. II.F.2.h The permittee made available through paper or electronic means, ordinances, Educational post -construction requirements, design standards checklists, and other materials Materials and appropriate for developers. Training for Note: New materials may be developed by the permittee, or the permittee may use Yes --- Developers materials adopted from other programs and adapted to the permittee's new development and redevelopment program. Most documents are available for developers, but Town will be providing in future a checklist type document as guidance. II.F.2.i Enforcement The permittee tracked the issuance of notices of violation and enforcement Partial --- actions. If yes, the tracking mechanism included the ability to identify chronic violators for initiation of actions to reduce noncompliance. Partial --- Town does document, but a central database isn't utilize, but will be developed in new SWMP plan. II.F.3.b The permittee fully complies with post construction program requirements on its New Development own publicly funded construction projects. Yes --- No Comment Audit Date(s): 02/17/2021 Page 11 of 12 MS4 Permit Audit Report Indian Trail, NC: NPDES Permit No. NCS000453 Post -Construction Site Runoff Controls II.F.3.c Does the MS4 have areas draining to Nutrient Sensitive Waters (NSW) pursuant to Nutrient Sensitive 15A NCAC 02H .0150? No --- Waters If yes, does the permittee use SCMs that reduce nutrient loading in order to Not meet local program requirements. Applicable _ If yes, does the permittee also still incorporate the stormwater controls Not required for the project's density level. Applicable If yes, does the permittee also require documentation where it is not feasible to Not use SCMs that reduce nutrient loading. Applicable No Comment II.F.3.d The permittee ensured that the design volumes of SCMs take into account the Design Volume runoff at build out from all surfaces draining to the system. Yes 1 Where "streets" convey stormwater, the permittee designed SCMs to be sized to treat and control stormwater runoff from all surfaces draining to the SCM including Yes 1 streets, driveways, and other impervious surfaces. No Comment Audit Date(s): 02/17/2021 Page 12 of 12