Loading...
HomeMy WebLinkAbout20210723 Ver 1_Compliance Evaluation Inspection_20210625Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210723 NCDOT - SR 2793 Cedar Creek Road Improvements Buncombe NCDOT - SR 2793 Cedar Creek Road Improvements NC DOT Division 13 6/25/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-82° 12' 01''+35° 32' 19'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on June 25, 2021 by Kevin Mitchell with the Asheville Regional Office. The inspection was in response to a complaint that the Asheville Regional Office received stating that the project was being cleared and no measures were in place. The site is currently in the clearing stage. No grubbing or grading has occurred on the project. The only reccomendation that DWR has at the time is to consider placing coir log checks in the drainage feature that discharges directly to the creek to prevent sedimentation to Cedar Creek (Class C;Tr). ~ Station L 11+00-14+00 RT Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210723 6/25/2021 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2