Loading...
HomeMy WebLinkAbout20211043 Ver 1_R-5709 4C Final Minutes_20210601 R-5709 Final 4C Interagency Concurrence Point Meeting RK Minutes Date: 6/15/2021 Meeting Date: May 12, 2021 Location: Virtual conference held via GoTo Meeting: https://global.gotomeeting.com/join/202085069 Time: 1:00 PM Attendees: James Lastinger—USACE Amy Chapman—NCDWR Robert Patterson—NCDWR Seth Wilcher—FHWA Paul Atkinson—NCDOT Hydraulics Ray Lovinggood—NCDOT Hydraulics Chris Rivenbark—NCDOT ECAP Matt Wilkerson—NDOT EAU Wes Cartner—NCDOT EAU Jeff Walston—NCDOT REU Jennifer Parrish—NCDOT REU David Clodgo—NCDOT Roadway Piotr Stojda—NCDOT Roadway Tucker Martin—NCDOT Utilities Jon Gaillard—NCDOT Utilities Dayton Martin—NCDOT Utilities Ali Koucheki—NCDOT Utilities Hoang Dieu—NCDOT SMU David Stutts—NCDOT SMU Rex Badgett—NCDOT Division 8 Art King- DEO Kevin Alford—Wetherill Elmo Vance—NCDOT PMU Mike Sanderson—NCDOT EPU Pam Williams—NCDOT PMU Colin Mellor—NCDOT EPU Pete Stafford—RK&K Trent Cormier—RK&K Rob Ridings—NCDWR Gary Jordan—USFWS Gordon Cashin—NCDOT ECAP Hannah Headrick—NCDOT EPU Amanetta Somerville- USEPA Monte Matthews—USACE Travis Wilson—NCWRC Reuben Blakley—NCDOT Division 8 Terry Farr—NCDOT PMU Brian Robinson—NCDOT Roadway An interagency concurrence point meeting was held to reach agreement on concurrence point 4C for the R-5709 NC-211 project in Moore/Hoke Counties. The following items were discussed, and conclusions reached. The group then began reviewing the permit drawings, led by Kevin Alford and Trent Cormier. • Site 13: Pond PA. Impacts due to the pond being drained by the contractor. o Discussed whether the wetlands around the pond being are impacted due to it being drained.After discussion, it was determined that the wetlands would not be impacted since the existing hydrology is being maintained. Rob Ridings noted that this pipe does not require burial if the pond is being drained and that leaving it buried in anticipation of a new channel forming within the pond is acceptable. • Site 18: Stream SH,Wetland WQ. Impacts due to roadway fill,42" RCP at outlet. o Need to Add 20% Bury Depth Note to plans. Note will read "Buried 0.7"' • Site 19:Wetland WR. Impacts due to roadway fill. This is a proposed total take. o Remove"Fill"hatch from the wetland area outside of the roadway fill slope.Add a Note on the Impact Summary that denoting the area outside the fill slope will be considered as impacted. We completed a sheet-by-sheet review of the drawings with the site-specific comments above noted during the meeting. As part of general discussion,Chris Rivenbark noted that the some of the wetland clearing method will be changing from mechanical to hand clearing. Additionally,the permitting agencies agreed that this permit could likely be filed as a general permit (GP) and not an Individual Permit(IP). T.I.P.Project R-5709 NC 211 Project WOKMoore/Hoke Counties,North Carolina