Loading...
HomeMy WebLinkAboutNC0021156_Inspection_20210608DocuSign Envelope ID: 16224737-849A-48B5-92FD-9FEF54AF7FB2 ROY COOPER Governor DIONNE DELLI-GATTI Secretary S. DANIEL SMITH Director David Johnson, PE Utilities Director City of Mount Holly Post Office Box 406 Mount Holly, NC 28120-0406 Dear Mr. Johnson: NORTH CAROLINA Environmental Quality June 8, 2021 SUBJECT: Notice of Deficiency Pretreatment Compliance Inspection City of Mount Holly NPDES Permit No. NC0021156 Gaston County Tracking No. NOD-2021-PC-03 81 Enclosed is a copy of the Pretreatment Compliance Inspection Report for the inspection of the City of Mount Holly's approved Industrial Pretreatment Program on May 27, 2021, by Mr. Wes Bell of this Office. This report is being issued as a Notice of Deficiency (NOD) due to the City's failure to sample all parameters required in a SIU's Permit. Specifically, the City did not perform semi-annual TTO monitoring in 2020 as specified in the American Efird's Industrial User Permit (#1157). This Office requests a written response be submitted by June 29, 2021, detailing the actions taken to prevent these violations from recurring. The response should be submitted to the attention of Mr. Bell. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192 or via email at wes.bell@ncdenr.gov. Enclosure: Inspection Report NORTH CPPOLINA OE Sincerely, DocuSigned by: A14CC681 AF27425... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1610 East Center Avenue. Suite 301 I Mooresville. North Carolina 28115 704.663.1699 DocuSign Envelope ID: 16224737-849A-48B5-92FD-9FEF54AF7FB2 NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION: 1. Control Authority (POTW) Name: City of Mount Holly 2. Control Authority Representative(s): Doug Shoutd, Nadine Blackwell 3. Title(s): Pretreatment Coordinator, Consultant 4. Last Inspection Date: 4/25/19 Inspection Type: ❑ PCI ® Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ® NA ICIS CODING Main Program Permit Number NC0021156 MM/DD/YY 05/27/21 7. Current Number Of Significant Industrial Users (SIUs)? 3 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number of Categorical Industrial Users (CIUs)? 2 16. Number CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either of the Last 2 Semi -Annual Periods? Not Been Published for Public Notice?(May refer to PAR if Excessive SIUs in SNC) N/A Not Pu 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? /1 YES ❑ NO See Comments Section ❑ YES r NO )lished: N/A N/A ❑ YES /1 NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ❑ YES ® NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO 26. If NO to 23 - 26, list violations: 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 1 DocuSign Envelope ID: 16224737-849A-48B5-92FD-9FEF54AF7FB2 28. PRETREATMENT PROGRAM ELEMENTS REVIEW: Program Element Last Submittal Received Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 3/28/19 0 Yes ❑ No 6/24/19 0 Yes ❑ No 4/1/24 Industrial Waste Survey (IWS) 12/7/16 /1 Yes ❑ No 3/13/16 /1 Yes ❑ No 12/1/21 Sewer Use Ordinance (SUO) 12/20/12 /1 Yes ❑ No 1/14/13 /1 Yes ❑ No Enforcement Response Plan (ERP) 9/15/10 /1 Yes ❑ No 12/15/10 /1 Yes ❑ No Long Term Monitoring Plan (LTMP) 3/30/16 /1 Yes ❑ No 5/4/16 /1 Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW: 29. User Name 1. American Efird 2. Clariant Corp. 3. Daimler Trucks NA 30. IUP Number 1157 1158 1163 31. Does File Contain Current Permit? /1 Yes ❑ No /1 Yes ❑ No /1 Yes ❑ No 32. Permit Expiration Date 12/31/22 12/31/22 12/31/22 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 410 414 & 455 433 34. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? /1 Yes ❑ No /1 Yes ❑ No /1 Yes ❑ No 35. Does File Contain an Inspection Completed Within Last Calendar Year? /1 Yes ❑ No /1 Yes ❑ No A Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. ►E Yes ■ No b. •Yes ■No a. ►E Yes ■ No b. •Yes ■No a. 1 Yes ■ No b. •Yes ■No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic Organic Management Plan (TOMP)? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 38. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. ►E Yes ■ No b.❑Yes❑NoEN/A a. ►E Yes ■ No b.❑Yes❑NoEN/A a. 1 Yes ■ No b.❑Yes❑NoEN/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP, including flow? ❑ Yes /1 No /1 Yes ❑ No A Yes ❑ No 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? /1 Yes ❑ No /1 Yes ❑ No 11 Yes ❑ No 41a. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required by IUP, including flow? _1 ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports on time? ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A 42a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by IUP? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 42b. For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? ►EYes ■No■NA ®Yes❑No❑N/A ❑Yes❑NoEN/A 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All Reporting Non -Compliance from SIU Sampling? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? c. Did POTW resample within 30 days of knowledge of SIU limit violations from the POTW sample event? a.®Yes❑No❑N/A b.❑Yes❑No®N/A c.❑Yes❑NoEN/A a.®Yes❑No❑N/A b.❑Yes❑No®N/A c.❑Yes❑NoEN/A a.❑Yes ❑NoEN/A b.❑Yes❑NoEN/A c.❑Yes ❑NoEN/A 45. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes r No ❑ Yes r No ❑ Yes 46. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? EYes❑No❑N/A EYes❑No❑N/A ❑Yes❑NoEN/A 47. Does the File Contain Penalty Assessment Notices? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 48. Does The File Contain Proof Of Penalty Collection? ❑Yes❑NoEN/A ❑Yes❑NoEN/A ❑Yes❑NoEN/A 49. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? a.❑Yes❑NoEN/A b.❑Yes❑NoEN/A a.❑Yes❑NoEN/A b.❑Yes ❑NoEN/A a.❑Yes ❑NoEN/A b.❑Yes❑NoEN/A 50. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? ❑ Yes /1 No ❑ Yes L No ❑ Yes /1 No NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2 DocuSign Envelope ID: 16224737-849A-48B5-92FD-9FEF54AF7FB2 FILE REVIEW COMMENTS: 17. Effluent dissolved oxygen minimum violations were reported in June 2019 and November 2020. Weekly and monthly average effluent total suspended solids (TSS) violations were reported in May 2020. 23. The LTMP will be revised to modify the detection levels for TSS and total phosphorus. 25. All 2020 and 2021 eDMRs will be reviewed to ensure all non -detect results and estimated values (J listing) are corrected and reported down to the appropriate detection levels. 35. The POTW performed SIU inspections on 10/20/20 (American Efird), 10/15/20 (Clariant), and 10/13/20 (Daimler Trucks NA). 39. The POTW performs field and TSS analyses and contracts Pace Analytical Services to perform LTMP analyses. The POTW failed to sample TTO semi-annually in 2020 as required in American Efird's IUP. 41a. American Efird, Clariant and Daimler Trucks NA all contract Pace Analytical Services to perform analyses. 46. American Efird was issued NOVs for limit violations of zinc (July and September 2020), copper (July 2020), total phosphorus (July 2020) and total nitrogen (December 2020). Clariant was issued a NOV for a total nitrogen limit violation in October 2020. SUMMARY AND COMMENTS: The POTW's records were organized and well maintained. Overall, the POTW's Industrial Pretreatment Program was being properly implemented. The POTW must ensure all sampling is performed according to the IUP and all LTMP results are reported down to the appropriate detection levels. NOD: ® YES ❑ NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory ❑ Marginal ❑ Unsatisfactory_ ❑ DocuSigned by: L1Oe4, Bat PCI COMPLETED BY: A61696D9OCC3437... PCI REVIEWED BY: DATE: 6/8/2021 Wes Bell, Sr. Environmental Specialist, Mooresville Regional Office DocuSigned by: A14CC681AF27425... DATE: 6/8/2021 W. Corey Basinger, Regional Supervisor, Mooresville Regional Office NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 3