Loading...
HomeMy WebLinkAbout20140762 Ver 6_Site inspection June22_20210624 Wetland Inspection Report Project Num: 20140762 Version: 5 Status: Issued Project Name: NCDOT-US 221 (R-2915E) Project Type: Road/Highway Widening County: Watauga Region: Winston-Salem Location: NCDOT-US 221 (R-2915E) Latitude: +350 16'05" Longitude: -81' 30' 10" SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 6/22/2021 Reason for Inspection: Routine Inspection Type: Site Inspection(DOT) Inspection Contact Person: Title: Phone: On-Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit(401 WQC) Inspection Summary: page 1 Site Number: 20140762 Owner: Thorne, Grejzory Inspection Date: 6/22/2021 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine Permit(401 WQC) Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: We reviewed active permit Sites 2A, 213, 11, 15A, 1513, and an area in the D Section that maw maintenance for an old broken CMP. Bore and jack operation at Site 2 was inactive (on pause,) and partially complete. EC measures were maintained and in place for pit dewatering operation. Site 11 was a completed pipe lining operation. More work was needed to repair temporary impacts at inlet. Riprap was not placed at outlet yet and may not be needed. Site 15 was an active pipe lining operation that was to be completed in a day or two. Temporary impacts were still in place for pump around. page: 2