Loading...
HomeMy WebLinkAbout20211029 Ver 1_Riparian Buffer Authorization Request_20210621Buffer Authorization Application Form 15ANCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Fo Update 10/23/2018 Original Submittal 6/21/2021 A. Owner/Applicant Information General Information Primary Contact Email:* tbeasley@withersravenel.com Rease list the contact person's en -ail for questions or payrrent on this project if needed. Who is submitting the application?* W Owner r Applicant other than Owner r Agent Is there an agent working on this application r Yes but not submitting it? r No 1. Property Owner Information: la. Name on Recorded Deed:* DHIC VARINA GATEWAY LLC 1b. Responsible Party: R. Elam Hall (for Corporations) 1c. Mailing Address:* Street Address 1341 Horton Circle Address Line 2 aty State / Province / Pbegion Arlington TX Fbstal / Zip Code Country 76011 Us 1d. Telephone:* 540-273-9626 le. Email Address:* rehall@drhorton.com 3. Agent Information: 3a. Name: 3b. Company Affiliation: 3c. Mailing Address: Street Address Address Line 2 aty State / Province / Fegion Fbstal / Zip Code Country 3d. Telephone: 3e. Email Address: 3f. Attach a signed and dated copy of the agent Click the upload button ordrag and drop fileshere toattach docurrent authorization form. FCF Only B. Project Information and Prior Project History 1. Project Information la. Name of Project:* Ascend Varina Gateway Apartments (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* r Yes t: No 1d. Subdivision Name: le. Nearest Fuquay Varina Municipality: 1f. Property Size: 18.80 acres 1g. County (or Counties) where the project is located:* Wake 1h. Property ID# Date of Purchase 0657599860 12/18/2020 Tax RN or Parcel id 1 i. Deed Information ...... ............................... ... ...... ...... ...... ...... il Type of Book F Book# Page# 1[ Deed 01821 18.8 Map 1j. Attach a copy of the recorded map that indicates when the lot was last platted. (lick the upload button or drag and drop files here to attach document Parcel -Owner Info.pdf 934.65KB FDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup r Manually Latitude * 35.618220 Longitude *-78.811279 11. Is the project located in any of North Carolina's twenty coastal counties? C Yes 0 No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Basal Creek (Stream Index: 27-43-15-3) 2b. Water Quality Classification of nearest receiving water:* B; NSW 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 0 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project site consists of undeveloped woodlands. The general land use in the vicinity of the project consists of a mixture of residential and commercial land uses. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach docunent USGS Exhibits.pdf 560.96KB PDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files hereto attach docurrent Soil Survey.pdf 198.94KB FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* The project consists of construction of an apartment complex and associated infrastructure. The only impacts associated with the project are buffer impacts necessary for construction of the outfall for the wet detention SCM. Traditional commercial construction equipment and techniques will be used to construct the project. Attach a site plan as applicable to the project: (lick the upload button or drag and drop files here to attach docurrent Buffer Impact Maps_Complete.pdf 21VIB FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* c 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date Attach Corps James Lastinger 08/03/2017 Approved 336.4.. (� if known) Delineation Exhibit.pdf pd only *** Please include the date of the determination and upload a copy of the determination. Comments: Delineation was approved by James Lastinger on 8/03/207 as part of the 'Basal Creek Townhomes" project (SAW-2008-00354). 6. Project History 6a. Have permits or certifications been requested or obtained forth is project (including all prior phases) in the past?* r Yes r No 7. Future Project Plans ............................................................................................................. 7a. Is this project a phased project?* r Yes r No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) r Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) r .Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type* Zone 1 Zone 2 Impact 1 - SCM Stream 3 Permanent Allowable 83.00 433.00 Outfall (P) Square Square lVbp label (e.g. RDad Perm or Terrp Feet Feet Crossing 1) Total Zone 1 Impacts: 83.00 Total Zone 2 Impacts: 433.00 Total Buffer Impacts: 516.00 Comments: Buffer impacts will occur for the outfall of the SCM, which is "Allowable Upon Authorization". D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* The project has been designed to avoid all impacts to wetlands and streams. The only proposed impacts are for the SCM outfall. The outfall has been designed to minimize buffer impacts by designing the outfall to cross the buffers perpendicularly. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Silt fencing will be installed around all disturbed areas prior to construction. Access during construction will occur within uplands. E. Diffuse Flow Plan la. What type of SCM are you providing?* r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Proposed project will not create concentrated stormwater flow through the buffer W Other SCM that removed minimum of 30% nitrogen 1b. Describe how diffuse flow will be maintained:* The SCM consists of a wet detention basin which will provide a minimum of 30% nitrogen removal and therefore diffuse flow is not required. 1c. Diffuse Flow Documentation* aick the upload button or drag and drop files here to attach docurrent Diffuse Flow Documentation. pdf 38.29KB FUF only F. Supplementary Information Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? C Yes (-- No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r Yes r No 2b. Is this an after -the -fact buffer authorization application? r Yes r No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: dick the upload button or drag and drop files here to attach document FDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Troy Beasley Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version:* Select Reviewer: Select Reviewing Office* Has payment been received?* O Yes O No O Yes r No 20211029 1 Stephanie Goss:eads\szgoss Raleigh Regional Office - (919) 791-4200 C No Payment Needed r Fee Received r Need Fee - send electronic notification sr7usDNavF GRAPHIC SCALE E AyE NFFQR• ?so 0 1000 2000 1 inch = 2000 ft. GRIGS8YAVE—-- _ 450 2ft - � ❑ 41 gG ma R p gR1A 55 . k'."Q`L- 35 ... OLD ADAMS"RD A BASS LAKE 3�0 . " -,1LL {'SWAY - - - - - -- - .HILLTap'' FQd}ORF -- - - J NF y ..� `KETD= PROJECT LOCATION ❑ BARTIIAN DR WADE WASH RD y V ~ 87C10EN5 Rb {� LN 55 -- . - J� DOGWOOD CREEK PL may? 1 WOODCHASE GREEN OR . p,P ASHOALE DR. . f'r'd;-F FIRln fib _ - ��v FARM 4. Greeni2Wfl Lei �E'Q.p HOLY BRIAR DR Memorial = ,Q TWIN LAKE OR Gardens p4- SIPPIHAW OAKS DR EY ❑ MARLWAY 1 _ m � - C. LT RHODA LILLEY OR % o [F @EAVERAAM -,-� 1;D6E bR. SC kbD PK WY ,1 F �v 400 a 9d - 4 w1lb-o ] L@OVRD Mr. �� e � BENGAL BLVD FOREST FERN LN m -RRY HOWAR - f 0� qR FAYE•T _FiMLE ST ASCEND VARINA GATEWAY APTS USGS QUAD (2019) - FUQUAY-VARINA APO WithersRavenel 1/ Engineers I Planners I Surveyors FU UAY-VARINA WAKE COUNTY NORTH CAROLINA I ���� i1, GRAPHIC SCALE M 0 200 400 r1 inch = 400 ft. I fr — PROJECT BOUNDARY t J � \J f � ASCEND VARI NA GATEWAY APTS USGS QUAD (2019) - FUQUAY-VARINA WithersRavenet 1/ Engineers I Planners I Surveyors GRAPHIC SCALE 0 200 400 ti 0 1 inch = 400 ft. f �-1 q p D CeD W C q r 1 ■ g PROJECT BOUNDARY A p c a y A PC2 _ r i►h r WaB • = NoB APC_ Wgq wac WgA OR 40 . � r NoB . �� •' NoB HIV a B NoB r 8 Wg - �► �j ASCEND VARINA GATEWAY APTS WAKE CO. SOIL SURVEY (1970) 40 WithersRavenel SHEET90 10 Engineers i P[anners i Surveyors FU UAY-VARINA WAKE COUNTY NORTH CAROLINA PIN: 0657599860 Total Value: $5,884,224 PIN Ext: 000 Biling Class: Business Real Estate ID: 0250843 Description: L01 BASAL CREEK DEVELOPMENT Map Name: 0657 02 BM2019 -00852 Owner: DHIC VARING GATEWAY LLC Heated Area: 3690 Mail Address 1: 2300 BROAD ST Street Name: N BROAD ST Mail Address 2: FUQUAY VARINA NC 27526- Site Address: 2300 N BROAD ST 5546 City: FUQUAY-VARINA Mail Address 3: Planning Jursidiction: FV Deed Book: 018249 Township: Holly Springs Deed Page: 01821 Year Built: 1872 Deed Acres: 18.8 Sale Price: $0 Deed Date: 12/18/2020 Sale Date: Building Value: $22,434 Use Type: SINGLFAM Land Value: $5,861,790 Design Style: Conventional N 0 215 430 860 ft I I I I I I I 1 inch = 400 feet Disclaimer iMaps makes every effort to produce and publish the most current and accurate information possible. However, the maps are produced for information purposes, and are NOT surveys. No warranties, expressed or implied, are provided for the data therein, its use,or its interpretation. —A.—S I --'d I spa Ou3 gd I@U@Aedsj@gj!M POPP 7N'VNRIvA-Avnanj hb'M31b'� o VNIdVACMIDSV dVWiDVdWlllVda]AO § o ` 0 t3 C�D . .......... ...... DN'VNidvA-),vnbnj —A-inS I --Pld I --a IJJ J@U@Aedsj- 010% Avm�liv!) L# iDVdWI d�i��no T cli VNIdVACMIDSV X -------------- L .... ------- --- -------- dw ------------- 4 4 -41c- �7 0 iL WW- 0 % V1d]SVNW'dG�SNIGVdSG]1lVi]G ztO N CO %0 WithersRavenel 40 Our People. Your Success. Diffuse Flow Documentation The SCM consists of a wet detention basin which will provide a minimum of 30% nitrogen removal and therefore diffuse flow is not required. 219 Station Road, Suite 1011 Wilmington, NC 28405 t: 910.256.9277 1 www.withersravenel.com I License No. C-0832 Asheville I Cary I Greensboro I Pittsboro I Raleigh I Southern Pines I Wilmington NOTES: n GRAPHIC SCALE 1) WETLAND DELINEATION APPROVED BY USACE (SAW-2008-00354). 0 100 200 2) BUFFER SUBJECTIVITY BASED ON NCDWR BUFFER DETERMINATION LETTER DATED 9/1/2017 (RRO#17-248). 0 1 inch = 200 ft. °0 0 PROJECT/PARCEL BOUNDARY BEAVER IMPOUNDMENT � � o fX3 SUBJECT TO BUFFERS AT EDGE OF WATER o - 0 0 WETLAND D Y� C NON -JURISDICTIONAL POND C NOT SUBJECT TO BUFFERS I 50' NEUSE RIVER RIPARIAN BUFFERONE z 90 9 �V � 1 O a P ASCEND VARINA GATEWAY APTS APPROVED DELINEATION EXHIBIT 1110 WithersRavenel 1/ Engineers I Planners I Surveyors FU UAY-VARINA WAKE COUNTY NORTH CAROLINA