HomeMy WebLinkAboutSWA000100_Fast Track ATC Cover Letter_20210511ROY COOPER
Governor
DIONNE DELLFGATTI
Secretary
BRIAN WRENN
Director
Clayton Properties Group, Inc.
Attn: Brian D. Shugart
221 Jonestown Road
Winston-Salem, NC 27104
NORTH CAROLINA
Environmental Quality
May 11, 2021
Subject: Authorization to Construct (ATC) Permit No. SWA000100
The Lake at Spicewood — Phase 1
Forsyth County
Dear Mr. Shugart:
The Division of Energy, Mineral, and Land Resources (DEMLR) received a complete "Authorization to
Construct" (ATC) Permit Application Form for the subject project to be permitted under the State
Stormwater Fast Track Process on April 28, 2021. Staff have reviewed the application materials and have
determined that the project, as proposed, complies with the Stormwater Regulations set forth in Rule 15A
NCAC 02H.1043. We are hereby forwarding Authorization to Construct Permit No. SWA000100 dated
May 11, 2021, for the construction of the stormwater control measures (SCMs) and built -upon area
associated with the subject project.
This Authorization to Construct Permit does not constitute an approval of the project at its completion.
Approval of this project at completion will be based on Division review and approval of the final permit
application completed by a North Carolina licensed professional. It shall be the Permittee's and the
licensed professional's responsibility to ensure that the as -built project meets the appropriate stormwater
rules. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-
215.6A through § 143-215.6C and/or referral of the licensed professional to the appropriate North
Carolina licensing board.
This Authorization to Construct Permit shall be effective from the date of issuance until May 11, 2026,
shall be subject to the conditions and limitations as specified therein, and shall not supersede any other
agency permit that may be required.
This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this
ATC Permit and is herein incorporated by reference.
Please note that this Authorization to Construct Permit is not transferable except after notice to and
approval by the Division. The Division may require rescission and/or revocation and reissuance of this
permit.
If you have any questions concerning this permit, please contact Jim Farkas in the DEMLR Central Office
at 919-707-3646 or Jim.Farkas@ncdenr.gov.
Sincerely,
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH OAROLINA _
Depar ntofEnvimnmmdlDwllry 919.707.9200
for Brian Wrenn,
Director, Division of Energy, Mineral and Land Resources
Enclosure(s): Attachment A — Fast Track Construction Commencement Form
Attachment B — Example Deed Restriction and Protective Covenants Language
Application Documents
cc: SWA000100 File, Winston-Salem Regional Office
Paul A. Stimpson, PE — LaBella Associates, PC