HomeMy WebLinkAbout20211027 Ver 1_Meeting Request Review_20210622 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWmnnacnrrtl Qua fay
ID#* 20211027 Version* 1
Regional Office* Asheville Regional Office-(828)296-4500
Reviewer List* Kevin Mitchell
Pre-Filing Meeting Request submitted 6/22/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Roger D. Bryan
Contact Email Address* rdbryan@ncdot.gov
Project Name* Bridge 145
Project Owner* NC Department of Transportation
Project County* Madison
Owner Address: Street Address
55 Orange Street
Address Line 2
City State/Rovince/Region
Asheville NC
Fbstal/Zip Code Country
28801 US
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Kevin Mitchell
Please give a brief project description below and include location information.*
The project will replace Bridge 145 with a three sided box culvert on SR
1151 over Big Pine Creek in Madison County.
Please attach the documentation you would like to have the meeting about.
17BP13R172_Permit Drawings.pdf 1.57MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 6/22/2021
Reviewer Meeting Request Decision
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Is a meeting required or is there more info needed?*
r Yes r No
If rmre inforrration is needed,please add comrents for the errail notification below.