Loading...
HomeMy WebLinkAbout20211026 Ver 1_R2511_Permit Drawings_BUFFER_20210609_20210623VICINITY MAP (NTS) CAT-1 CAT-1 GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77 AT-1 GREU TL-2GREU TL-3 AT-1PROP. SBG SBGPROP. CAT-1 GREU TL-3 GREU TL-3 CAT-1 CAT-1 GREU TL-3 AT-1 CAT-1 CAT-1 GREU TL-3 CAT-1 GREU TL-3 CAT-1 GREU TL-3 +23.0981.97' +27.564.21' +35.76 105.41' +88.18 85.12' +79.5847.89' +53.4835.40'+43.3465.84' +75.7470.62' +52.0362.65' +01.7663.26' +43.1840.94' +36.634.81' +96.862.82' +87.7110.85' +30.43297.56' +38.85137.47'+68.07 137.05' +68.6213.29' +05.85103.54' +53.8571.52' +31.3181.84' +07.3983.70' +82.0032.57' +28.2566.54' +30.2436.65' +27.3985.55' +40.9890.76' +49.9491.90' +86.0892.25' +15.3192.01' +20.6191.74' +61.00 43.79'43.89' +93.4635.37' +01.5112.64'+29.5312.75' +96.5813.20' +79.4012.76'137.22'+86.68137.19'+93.34+17.8129.97' +75.8633.28 '+93.5541.75'+69.24 31.38'+69.32 30.00'+73.31 30.05' +22.55 30.05'+30.6430.14' +21.62 0.30' +72.030.65'+25.961.65'+26.493.02' +97.6031.85'+98.1934.55' +98.8936.65' +99.9738.02' +01.0937.79' +52.4337.67'+87.66116.18'+17.3435.46' +22.7226.76' +22.1818.86' +21.6412.43' +51.926.06' +92.41164.58' 97.71'+06.0425.29'+15.31 25.18'+91.17 79.49'+28.02 96.30'+85.15 80.31'+02.65 95.04'+03.36 74.73'+86.18 96.01'+02.81 83.77'+03.60 84.34'+84.11 59.57'+12.68 66.24'+98.69 81.82'+25.68 68.90'+35.36 48.05'+54.24 +75.26122.11'18.55'+00.64 13.25'+58.40+38.07 170.12'+01.7919.19' +01.693.75' +34.7912.73' +02.3466.33' 42.21'+62.19 +98.4344.32' +27.6135.32'44.58' +34.80 +15.23'13.70' +99.7113.85'+16.33 136.14'+37.5393.23' +35.7067.00' 82.60'+78.32 +41.4474.17' +16.1266.84' +37.16 66.47'+80.6083.49'+80.9683.47' +19.31130.06' +04.0569.85' +96.3179.40'+21.0266.52' +53.5782.91'+41.6588.81'+00.23 91.36'43.76'+25.57 +60.92109.75' +97.45129.14' +66.1019.20' +20.9912.54' 142.78'+86.59 +55.6461.49' +15.2964.96' +18.2685.52' +67.8577.03'+22.1274.46'+41.1474.30' +75.2758.60' 29 +14.5611.88' +90.11136.62'11.33'+16.94 +67.7611.74'+78.3761.12' +59.80 114.41'+39.49 116.78' +44.6176.92' +47.7628.64' 84.36'+83.69 +67.4267.00' +90.03104.50'+39.2935.06' 35.33'+00.66 82.66' +19.10+88.25 138.19'+98.31131.74'+01.38112.39'+97.74 105.39'+51.91126.93'+30.9373.84' +82.4282.28'+27.8582.15' +50.6781.25' +88.0780.61' +01.4369.93' 134.34' +94.83106.08' 125.81'28.06 +83.22 +80.9912.98' +34.9935.07' +43.8934.95' +03.9072.10' +55.9012.63' +49.38166.00'+31.5811.58' +82.4311.63'+18.77126.12'+67.4332.11' +03.9252.84'+61.9057.93' +31.9563.79' +42.3168.21'+70.0787.24'+59.4073.43' +59.3475.58'+29.4977.10' +59.4479.90' +59.8781.81' +60.3283.05' +81.2183.68'+03.1483.59' +25.5283.51' +76.8883.27' +02.2282.82' +53.9472.84' +61.9983.25' +79.1183.29' +53.7383.24' +15.3182.36'+15.2382.44' 83.53'+11.85 +14.5274.29'+80.6682.51' +03.5485.93' +68.4712.38'+26.83142.27' +57.6912.04'+38.59143.36'+09.04141.03'8.83'+79.11 +73.0110.26' +52.4912.50' +02.4830.85' +08.3430.00' 93.09'+97.94 82.77'98.73 +80.5383.33' 69.74'+81.83 82.87'+68.72 68.05'+68.96 82.89'+77.55 82.89'+77.55 65.65'+36.86 83.00'+57.17 83.03'+28.66 83.20'+38.61 88.00'+59.57 72.93'+96.40 322.15+66 .10+50.40137.61'+48.9949.25' +73.81116.45' +48.92119.27 +12.4095.47' +85.3395.49' +79.1791.16' +00.2435.97' +33.0866.85' +96.8785.67' +11.5983.43'50.89'+23.40 43.62' +92.96 70.02'+72.36 +68.5130.18' 85.94'+39.67 SITE 1 SITE 2 SITE 3 SITE 4 SITE 5 SHEET 1 OF 9 BUFFER DRAWING ENGLISH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 LOCATION: TYPE OF WORK: DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA TIP PROJECT:GRADING, DRAINAGE, PAVING, AND STRUCTURES See Sheet 1-A For Index of Sheets PROJECT BEGIN PROJECT END 09/08/99 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN 0 00 6/9/2021R:\Hydraulics\PERMITS_Environmental\Drawings\r2511_Hyd_BUF_tsh.dgnagneushevCONTRACT: C204498ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAFOR NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 25 50 10050 50 25 50 100 10 5 10 20 NCDOT CONTACT: PLANS PREPARED BY: D T V = = = = = K 4 BEAUFORT & MARTIN COUNTIES R-2511R-2511 35494.1.1 N/A EXISTING MULTI-LANES SOUTH OF WILLIAMSTON US 17 FROM NORTH OF NC 171 TO MARTIN CO.BEAUFORT CO.MATCHLINEMATCHLINE5 6 7 8 9 10 11 12 13 14 15 16 17 18 192021222324 25 26 27 28 29 30 3 1 32 33 34 35 36 37 38 39 404 1 4 3 4445 4 6 47 4 2 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MICHAEL T. MERRITT, P.E. BEAUFORT COUNTY MARTIN COUNTY 17 1733 Pamlico River171 903 30 903 32COUNTYBEAUFORTCOUNTYPITT264 64A 64 13 64 CSX Railroad Railroad Southern Norfolk WASHINGTON ROBERSVILLE JAMESVILLE WILLIAMSTON -L- US 17 TO WASHINGTON TO WILLIAMSTONSR 1418N. ROBERSON RD.-Y1-SR 1410VOA RD.-Y2-S R 1 4 2 1HODGE S RD.GRI F FI N-Y3-SR 1419WOOLARD RD.-Y4-SR 1420BEAR GRASS RD. -Y5-SR 1106CHURCH RD.SMITHWICK CREEK-Y6-SR 1106JOE MOBLEY RD.-Y6-SR 1114DAN PEELE RD.-Y7-SR 1114GRIFFIN RD.THURMAN-Y8-SR 1570ROGERSON RD.DAVID-Y9-SR 1116SCHOOL RD.RODGERS-Y10-SR 1205CREEK BLVD.HOLLY-Y11-SCOTT D. BLEVINS, P.E. -L- Sta. 568+50.00 END TIP PROJECT R-2511 -L- Sta. 7+50.00 BEGIN TIP PROJECT R-2511 -L- US 17 ADT 2020 ADT 2040 9,164 14,284 5% 60 MPH * TTST =8% = RURAL ARTERIAL FUNC CLASS = DUAL 5% 13% *DECEMBER 20, 2018 JOHN ABEL, JR. PROJECT ENGINEER - DIVISION 1CREEKGUM SWAMPPE 60% -L- Sta. 156+21.18 BEGIN BRIDGES -L- Sta. 156+89.29 END BRIDGES OFFSITE DETOUR 2018 STANDARD SPECIFICATIONS NAD 83/ 2011 35494.2.1 TOTAL LENGTH OF TIP PROJECT R-2511............. 10.625 miles LENGTH STRUCTURE TIP PROJECT R-2511........... 0.013 miles LENGTH ROADWAY TIP PROJECT R-2511............ 10.612 miles 1-888-521-4455 OR 919-878-9560 RALEIGH, NORTH CAROLINA 27615-3960 8601 SIX FORKS ROAD, FORUM 1, SUITE 700 RUMMEL, KLEPPER & KAHL, LLP DECEMBER 21, 2021 1. THIS IS A PARTIALLY CONTROLLED-ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS. NOTES: R/W 35494.3.1 CONST. Main St.R234 Poplar Chapel CedarBranchChurch Holly Springs Ch. St. Sycamore Haughton St. Martin Co. Airport Washington St. CemeteryOakdale CemeteryGroveCedar Prong Kennedy Hubbard ChurchHoward Hill High SchoolWashingtonCarolina Ave. Pactolus Rd. Swamp Old Warren Field Swam p Swamp Swamp SwampSwampSwampMillSwampHorsepen BeaverdamBig Gum Ford TrackRace Pamlico -L- CS Sta. 7+50. 0 0 Begin ConstructionBEGIN PROJECT R-2511 33 C88 Pitt St. Carson .54 .22 .89.48.44 1.46 BUFFER IMPACTS Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/9/2021R:\Hydraulics\PERMITS_Environmental\Drawings\R2511_Hyd_Buf Filtration.dgnagneushev8/17/99R-2511 ENGLISH SHEET 2 OF 9 BUFFER DRAWING www.rkk.com Engineers | Construction Managers | Planners | Scientists GRASS SWALE DATA D10= 0.47' V10= 2.15ft/s Q10= 5.50cfs D2= 0.41' V2= 1.98ft/s Q2= 4.24cfs SLOPE= 1.61% DA= 1.45ac PSH 4 DETAIL A 18+48 RT -L- STA. 16+00 TO PROVIDING FILTRATION BUFFER FILTRATION GRASS SWALE DATA D10= 1.43' V10= 1.70ft/s Q10= 20.33cfs D2= 1.26' V2= 1.59ft/s Q2= 15.66cfs SLOPE= 0.30% DA= 5.36ac PSH 4 DETAIL A 23+50 LT -L- STA. 17+79 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.94' V10= 1.35ft/s Q10= 8.57cfs D2= 0.82' V2= 1.25ft/s Q2= 6.60cfs SLOPE= 0.30% DA= 2.10ac PSH 4 DETAIL A 17+75 LT -L- STA. 15+64 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.62' V10= 2.14ft/s Q10= 7.76cfs D2= 0.54' V2= 1.98ft/s Q2= 5.98cfs SLOPE= 1.19% DA= 1.89ac PSH 7 DETAIL A 54+10 LT -L- STA. 52+00 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 1.29' V10= 2.05ft/s Q10= 20.92cfs D2= 1.14' V2= 1.91ft/s Q2= 16.12cfs SLOPE= 0.49% DA= 6.62ac PSH 7 DETAIL A 55+43 LT -L- STA. 55+00 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.44' V10= 2.01ft/s Q10= 4.74cfs D2= 0.38' V2= 1.85ft/s Q2= 3.65cfs SLOPE= 1.51% DA= 1.25ac PSH 7 DETAIL A 54+11 RT -L- STA. 48+75 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 1.16' V10= 2.14ft/s Q10= 18.58cfs D2= 1.02' V2= 1.99ft/s Q2= 14.32cfs SLOPE= 0.59% DA= 4.90c PSH 8 DETAIL A 68+84 RT -L- STA. 63+50 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.33' V10= 2.04ft/s Q10= 3.34cfs D2= 0.28' V2= 1.87ft/s Q2= 2.57cfs SLOPE= 2.19% DA= 0.88ac PSH 7 DETAIL A 17+25 LT -Y2- STA. 15+00 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 1.19' V10= 2.08ft/s Q10= 18.66cfs D2= 1.04' V2= 1.94ft/s Q2= 14.38cfs SLOPE= 0.55% DA= 4.92ac PSH 8 DETAIL A 69+53 LT -L- STA. 58+50 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.74' V10= 1.96ft/s Q10= 8.99cfs D2= 0.64' V2= 1.82ft/s Q2= 6.93cfs SLOPE= 0.82% DA= 2.37ac PSH 11 DETAIL A 105+90 LT -L- STA. 99+39 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 1.04' V10= 2.13ft/s Q10= 15.89cfs D2= 0.91' V2= 1.98ft/s Q2= 12.24cfs SLOPE= 0.66% DA= 4.19ac PSH 4-5 DETAIL A 23+50 RT -L- STA. 18+91 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.37' V10= 1.47ft/s Q10= 2.77cfs D2= 0.32' V2= 1.35ft/s Q2= 2.13cfs SLOPE= 1.00% DA= 0.73ac PSH 7-8 DETAIL A 58+50 LT -L- STA. 55+43 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 1.59' V10= 2.13ft/s Q10= 29.64cfs D2= 1.40' V2= 1.99ft/s Q2= 22.84cfs SLOPE= 0.42% DA= 9.38ac PSH 8-9 DETAIL O 78+50 RT -L- STA. 68+88 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 1.12' V10= 2.14ft/s Q10= 17.63cfs D2= 0.98' V2= 1.99ft/s Q2= 13.59cfs SLOPE= 0.62% DA= 4.65ac PSH 8-9 DETAIL A 74+50 LT -L- STA. 69+59 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.55' V10= 1.59ft/s Q10= 4.93cfs D2= 0.48' V2= 1.47ft/s Q2= 3.8cfs SLOPE= 0.74% DA= 1.30ac PSH 10-11 DETAIL A 98+50 RT -L- STA. 94+00 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.95' V10= 1.79ft/s Q10= 11.64cfs D2= 0.83' V2= 1.66ft/s Q2= 8.97cfs SLOPE= 0.52% DA= 3.07ac PSH 11 DETAIL A 109+00 RT -L- STA. 98+94 TO PROVIDING FILTRATION GRASS SWALE DATA D10= 0.93' V10= 1.94ft/s Q10= 12.17cfs D2= 0.81' V2= 1.80ft/s Q2= 9.38cfs SLOPE= 0.63% DA= 3.21ac PSH 10-11 DETAIL A 99+34 LT -L- STA. 93+19 TO PROVIDING FILTRATION WA10' CONCGRG1SFD9' CONCC ONC CONC2SFDBK WALLWALLRIPRAPRIPRAPRIPRAPRIPRAPRUINSSRIPRAPBK WALLRI PRAPRI PRAPRIPRAP RIPRAPRIPRAPRIP R A PWA L L13' GR16' SOI LGRASS GRASSISL CONC CONC ISL HWY 17 BST VARIES HWY 17 BST VARIESHWY 17 BST VARIES HWY 17 BST VARIES SR 1418 N. ROBERSON ROAD 20' BSTT TTTEXISTING R/W MONUMENT RIPRAP 220.00'EXISTING R/W EXISTING R/W DB 1431 PG 103 MCDONALD GAUTIER, III, ET AL DB 1258 PG 57 OF TRANSPORTATION NORTH CAROLINA DEPARTMENT DB 1708 PG 617 MAXWELL P. CHESNUTT FAMILY TRUST DB 1 124 PG 2 CHRISTIAN BASS TOPPIN DB 1595 PG 341 DB 804 PG 851 DB 739 PG 496 DB 1809 PG 836 ROSEANN BASS WB 15E PG 178 DAVID LEE LAWRENCE, JR. Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 C A C A C A C A C A C A C A 1 2 3 4 5C AF FF F F F F F F FFFFFF F F FF F F F F F F F F F F 6" PVC 6" PVC 6" PVC COPPER COPPER COPPER 5+00 10+00 15+00 10+00-L- POC Sta. 13+74.26 -Y1- POT Sta. 14+25.74= -Y1- POT Sta. 10+00.00 -L- SC Sta. 13+08.88-L- TS Sta. 12+08.88 -L- CS Sta. 7+75.00 -L- ST Sta. 10+00.00 -L--Y1--Y1- Sta. 10+50.00 BEGIN CONSTRUCTION PROP. 47" WW FENCE PROP. 47" WW FENCE PROP. 47" WW FENCE +80.00 BEGIN FENCE BEGIN C/A +80.00 END FENCE END C/A -L- CS Sta. 7+50.00 Begin Construction BEGIN PROJECT R-2511 TIE TO EXIST. FENCE BEGIN WW FENCE TIE TO EXIST. FENCE BEGIN WW FENCE SITE 1 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/9/2021R:\Hydraulics\PERMITS_Environmental\Drawings\R2511_Hyd_prm_BUF_psh04.dgnagneushev8/17/99MATCHLINE -L- STA. 19+50 SEE SHEET 5R-2511 4 NAD 83/ 2011ENGLISHSHEET 3 OF 9 BUFFER DRAWINGALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 www.rkk.com Engineers | Construction Managers | Planners | Scientists vvvvvvvvDI DI 15" RCP 15" RCP 12" CMPHW HW HW 15" HDPE15" HDPE15" HDPE60" CMP60" CMPFOOT BRIDGE SA SA 2GI DI DI 2GI FS RETAI N18" RCP-III SEE DETAIL B MEDIAN V DITCH W/ 10 SY GEO FAB 3 TONS CL B RIPRAP HW 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV DI DI REMOVE PIPE REMOVE EXISTING PIPE REMOVE EXISTING REMOVE REMOVE REMOVEREMOVEREMOVE 15" 15" 15" 15" 15" 15" SYSTEM REMOVE EXISTING FS ELEV.=35.0 W/ 62 SY GEO FAB 33 TONS CL I RIPRAP SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH REMOVE TB 2GI-A SEE DETAIL AI STANDARD 5' BASE DITCH 54" WELDED STEEL TRENCHLESS INSTALLATION 54" WELDED STEEL TRENCHLESS INSTALLATION HW66" WELDED STEEL (BURI ED 1')TRENCHLESS I NSTALLATI ONFILL FLOWABLE FILL W/ PLUG & P P HW REMOVE ON BANKS ONLY W/ 89 SY GEO FAB 48 TONS CL I RIPRAP SEE DETAIL M CHANNEL CHANGE SEE DETAIL M CHANNEL CHANGE WB RUINS SOIL72" CHL72" CHL19' CONC CO N C PA SOILSS72" CHLRIPRAPRIPRAPRIPRAPRIPRAPRIPRAP30' C ON C S9' SOIL8' SOILSR 1410 VOA ROAD 18' BSTTTTT TTHH HH EIP EIP NAIL 60.00'EXISTING R/WEXI STING R/WEXISTING R/W EXISTING R/W DB 1699 PG 55 EAST COAST EQUIPMENT PARTNERS, LLC BILLY J. ARNOLD, et ux DB 1392 PG 845 TRACT FOUR (CHERRY TRACT III) DB 606 PG 252 EDWARD G. WARD HEIRS. DON W. NOBLES, et ux DB 1226 PG 513 DRAWN BY TAX MAPPING ARNOLD LAND HOLDINGS, LLC DB 1888 PG 457 BIG BUCK PLANTATION, LLC MB 16 PG 48 DB 1924 PG 858 INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 BREAK ACCESS BREAK ACCESS BREAK ACCESS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/9/2021R:\Hydraulics\PERMITS_Environmental\Drawings\R2511_Hyd_prm_BUF_psh07.dgnagneushev8/17/99R-2511 7 MATCHLINE -L- STA. 45+00 SEE SHEET 6MATCHLINE -L- STA. 58+00 SEE SHEET 8www.rkk.com Engineers | Construction Managers | Planners | Scientists 50+00 55+00 15+00-Y2- PC Sta. 15+67.80 -Y2- PT Sta. 17+30.46 -L- POT Sta. 54+50.49 -Y2- POT Sta. 18+32.93= -L- ST Sta. 51+77.28 -L- CS Sta. 50+77.28 -L- SC Sta. 45+00.72 -Y2- Sta. 15+00.00 BEGIN CONSTRUCTION +15.00 END FENCE PROP. 47" WW FENCE PROP. 47" WW FENCE +65.00 BEGIN FENCE BEGIN C/A +65.00 END C/A +31CHORD 110'C A C A C A C A 56' +03.00 190' +34.00 171' +47.00 EXIST. R/W +90.00 EXIST. R/W +55.00 EXIST. R/W +35.00 EXIST. R/W +05.00 19 17 20 22 23 C ACA145' +16.59 145' EXIST. P/L F FFF F F F F F F F F F F FFFFCCFF F F F ENGLISHNAD 83/ 2011SHEET 4 OF 9 BUFFER DRAWINGMITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 SITE 2 6" PVC 6" PVC10" STEEL CASING10" STEEL CASI NG6" PVCCOPPER 25 PAIR6 PAIR50 PAIR COPPER 50 PAIR COPPER 12" STEEL NCGS ADKINS ELEV=45.13' 150' LT BL STA 27+25 BM1 vvvv15" RCP 15" RCP 24" RCP48" RCPINV=35.10'INV=35.48'SB2 15" R CP-I V 15" RCP-IV 2GI DI DI 15" RCP-III 15" RCP-III DI 2GI 2GI HW 2GI-A 15" RCP-IV 15" RCP-IV 15" RCP-IV DI REMOVE REMOVEREMOVE 18" FS RETAIN REMOVE 30" RCP-III SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL Y TOE PROTECTION SEE DETAIL Y TOE PROTECTION SEE DETAIL AC 4' BASE DITCH STANDARD SEE DETAIL C W/ RIPRAP LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH 66" RCP-III (BURIED 1')66" RCP-III (BURIED 1') US 17 28.5' BST SOILCONC8' GR8' GR8' GR8' GRM12147.10T EIP150.00'EXISTING R/W EXISTING R/W ESTATE FILE 85E PG 164 TRACT TWO EDWARD G. WARD HEIRS. TRACT FOUR (CHERRY TRACT III) BILLY J. ARNOLD, et ux DB 1392 PG 845 DB 1190 PG 891 DB 706 PG 361 (MAP) TRACT ONE ESTATE FILE 85E PG 164 TRACT TWO ESTATE FILE 85E PG 164 EDWARD G. WARD HEIRS. DB 701 PG 412 (MAP) DB 745 PG 200 ALTON R. HARRIS, et ux BIG BUCK PLANTATION, LLC DB 1888 PG 457 BIG BUCK PLANTATION, LLC DB 1888 PG 457 GEORGE S. BLAND, et al EDWARD G. WARD HEIRS. ESTATE FILE 85E PG 164 EDWARD G. WARD, et ux ROBERT J. ALLIGOOD, et ux DB 920 PG 665 SOIL SOIL SOIL Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 6" PVC 50 PAIR COPPER 50 PAIR COPPER 50 PAIR COPPER 12" STEEL 50 PAIR COPPERPIC7PIC8 ELEV=42.25' 181' RT BL STA 42+30 BM2 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/9/2021R:\Hydraulics\PERMITS_Environmental\Drawings\R2511_Hyd_prm_BUF_psh08.dgnagneushev8/17/99R-2511 8 NA D 83/ 2011MATCHLINE -L- STA. 58+00 SEE SHEET 7MATCHLINE -L- STA. 71+00 SEE SHEET 9www.rkk.com Engineers | Construction Managers | Planners | Scientists 60+00 65+00 70+00 -L- TS Sta. 64+19.69 -L- SC Sta. 65+39.69 -L- ST Sta. 70+24.76 -L- CS Sta. 69+04.76 CAT-1 CAT-1 PROP. 47" WW FENCE PROP. 47" WW FENCE PROP. 47" WW FENCE AT-1+40Wing Wall to Tie Fence Wing Wall to Tie Fence C A C A 23 20 24 25 25 26 23 26 28 29 F F F F F F F F F F FF FFFF F F F C F F F F F F ENGLISH MITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 SHEET 5 OF 9 BUFFER DRAWING SITE 3 vvvvvv15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 18" RCP HW HW HW 15" RCP4'X6'48" RCPINV=31.60'INV=31.32'SB15" RCP-III 2GI 2GI DI DI DI W/ 7 SY GEO FAB 2 TONS CL B RIPRAP W/ 7 SY GEO FAB 2 TONS CL B RIPRAP REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE & CULVERT REMOVE PIPE 24" 18" 18" 18" 18" 30" RCP-III 15" SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH 15" RCP-III 15" RCP- I V 15" RCP-IV 15" RCP-IV 48" RCP-III2GI-A SEE DETAIL A BASE DITCH LATERAL 4' SEE DETAIL O BASE DITCH LATERAL 4' HWHW MATTING (TYP.) COIR FIBER MATTING (TYP.) COIR FIBER EST. 70 SY GEOTEXTILE EST. 40 TONS CLASS I RIP RAP CHANNEL IMPROVEMENTS 105 LF OF INLET 48" RCP-III48" RCP-III8'x6' RCBC15" SY GEOTEXTILE EST. 50 RIP RAP CLASS I EST. 45 TONS IMPROVEMENTS CHANNEL 75 LF OF OUTLET 18" S1SFD 60" CHL48" CONC 1SCH CONC B G S 9' GR9' GR9 ' GR 9' GR9' BSTHTR 12' SOIL16' GRGR B 1SFD WST 30' PRIVATE EASEMENT (DB 1112 PG 222)EIP EIP EIP EIP EIP MARK FULLERTON, et al DB 1779 PG 868 DB 938 PG 791 (MAP)DB 1258 PG 777 ROSA L. JONES, et vir DB 1420 PG 674 DB 941 PG 591 (MAP) DB 1604 PG 409 AME ZION CHURCH TRUSTEES of CHERRY RUN DELPHINE CHAPMAN, et al DB 918 PG 945 HOLINESS CHURCH LOVE FAITH DB 1255 PG 222 DB 949 PG 785 (MAP) DB 916 PG 331 (MAP) BIG SWAMP, LLC BIG SWAMP, LLC DB 1911 PG 190 DB 1910 PG 225 JAMES DANIELS HRS DB 1251 PG 858 DB 1987 PG 282 MB 1 PG 105 STEVE & SANDRA GORHAM STEVE & SANDRA GORHAM ROBERT & KRISTIE DUNN INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560.025.02.01.00.01.02.03TYP. 40'+69.03TYP. 40'+14.42.025.025.025.025.02.02.01.00.01TYP. 25'+23.03.02.02.02TYP. 25'+05.025.03.025.025.03.025.025.02.01.00.01.02.03.006" PVC 6" PVC 50 PAIR COPPER 50 PAIR COPPER 12" STEEL 50 PAIR COPPER 50 PAIR COPPER PIC11ELEV=46.15' 145' RT BL STA 87+35 BM4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/9/2021R:\Hydraulics\PERMITS_Environmental\Drawings\R2511_Hyd_prm_BUF_psh11.dgnagneushev8/17/99R-2511 11 N A D 83/ 2011MATCHLINE -L- STA. 97+00 SEE SHEET 10MATCHLINE -L- STA. 110+00 SEE SHEET 12www.rkk.com Engineers | Construction Managers | Planners | Scientists 100+00 105+00 -L- TS Sta. 100+69.03 -L- SC Sta. 101+89.03 -L- CS Sta. 106+14.42 -L- ST Sta. 107+34.42 PROP. 47" WW FENCE PROP. 47" WW FENCE 49 50 48 51 52 53 54 55 45 F F F F F F F F F F F F F F F F F F FFF F F ENGLISH SHEET 6 OF 9 BUFFER DRAWING MITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 SITE 4 HWHW15" RCP 15" RCP18" RCP HW 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP 15" RCP2 4" RCPINV=39.39' INV=40.42' SJ 2 @ 42" RCP-IIIHW 2GI W/ 7 SY GEO FAB 2 TONS CL B RIPRAP 15" RCP- I V 15" RCP-IV 1 5" RCP-I V 15" RCP-IV 1 5" R C P -IV 15" RCP-IV 15" RCP-IV 2GI DI DI DI DI DI DI W/ 7 SY GEO FAB 2 TONS CL B RIPRAP SEE DETAIL E LATERAL V DITCH ON BANKS ONLY W/ 75 SY GEO FAB 40 TONS CL I RIPRAP REMOVE REMOVE REMOVEREMOVEREMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE 18" 15" 15" 15" 36" RCP-III15" RCP-III SEE DETAIL B MEDIAN V DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A BASE DITCH LATERAL 4' 18" SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL A BASE DITCH LATERAL 4' SEE DETAIL PLATERAL 4' BASE DITCH SEE DETAIL P BASE DITCH LATERAL 4' WC WC S 18" RCP24" HDPE 24" RCP 24" RCP 15" RCP15" RCPGR9' SOIL/GR CANOPY1SBKD 9' CONC30" RCP HW HW CONCCONC CONC T T T 6" PVC 6" PVC 6" PVC 10" STEEL CASING 50 PAIR COPPER 50 PAIR COPPER 6" PVC12" STEEL HH 50 PAI R COPPER24" CMP 24" RCP EIPEIPEIP 30' PR IVATE R IGHT -OF -WAY 60.00'EXISTING R/WEXISTING R/WJAMES L. HODGES, JR. et ux STEVEN C. WARD FIELDDRAIN ELEV=38.73' 94' RT BL STA 132+37 BM6EXISTING R/W 20' BSTSR 1419 WOOLARD ROADSANDRA W. WYNN ALEX J. TYSON WILLIAM V. WARD WILLIAM V. WARD, ET ALEIP Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/9/2021R:\Hydraulics\PERMITS_Environmental\Drawings\R2511_Hyd_prm_BUF_psh15.dgnagneushev8/17/99R-2511 15 N A D 8 3 / 2011MATCHLINE -L- STA. 149+00 SEE SHEET 14MATCHLINE -L- STA. 162+00 SEE SHEET 16www.rkk.com Engineers | Construction Managers | Planners | Scientists 150+00 155+00 160+0020+00-L- TS Sta. 152+21.24 -L- SC Sta. 153+81.24 -L- POC Sta. 157+73.77 -Y4- POT Sta. 20+93.34= -Y4- PT Sta. 16+62.46 -Y4- Sta. 17+00.00 BEGIN CONSTRUCTION PROP. 47" WW FENCE PROP. 47" WW FENCE PROP . 47" WW FENCE TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77 -L- Sta. 155+97.19 BEGIN APPROACH SLAB -L- Sta. 157+13.61 END APPROACH SLAB +53.97 BEGIN FENCE BEGIN C/A +45.00 END FENCE END C/A -L- Sta. 156+04.55 BEGIN APPROACH SLAB -L- Sta. 157+04.75 END APPROACH SLAB -L- Sta. 156+21.18 BEGIN BRIDGE -L- Sta. 156+80.76 END BRIDGE -L- Sta. 156+28.87 BEGIN BRIDGE -L- Sta. 156+89.29 END BRIDGE to Bridge Tie Fence to Bridge Tie Fence EXIST. R/W +08.00 EXIST. R/W +45.00 EXIST. R/W +07.00 110' +66.00 PROP. SBG SBG PROP. CHORD 220'110'C A C A 97' +63.00 110' +95.00 62 65 67 68 69 C A C A 57.80' +51.00 68AF F F F F F FFFFFFF F F F F F F F F F F F F F F FF SHEET 7 OF 9 BUFFER DRAWING MITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 ENGLISH SITE 5 GUM SWAMP CREEKSC 15" RCP-IV 15" RCP-IV 15" RCP-IV W/ 7 SY GEO FAB 2 TONS CL B RIPRAP W/ 5 SY GEO FAB 1 TON CL B RIPRAP 2GI 2GI TB 2GI 2GI15" RCP-III HW SEE DETAIL Z SP. LAT V DITCH 15" RCP-III 2GI W/ 7 SY GEO FAB 2 TONS CL B RIPRAP 3 @ 36" RCP-III W/ 50 SY GEO FAB 26 TONS CL I RIPRAP REMOVEREMOVE REMOVE REMOVE REMOVE PIPE EXISTING REMOVEREM OVEREMOVE 2GI 15" RCP-III SEE DETAIL Y TOE PROTECTION SEE DETAIL Y TOE PROTECTION SEE DETAIL Y TOE PROTECTION SEE DETAIL Y TOE PROTECTION SEE DETAIL A LATERAL 4' BASE DITCH SEE DETAIL P LATERAL 4' BASE DITCH SEE DETAIL AA LATERAL 4' BASE DITCH SEE DETAIL R LATERAL 4' BASE DITCH SEE DETAIL AD STANDARD 10' BASE DITCH 15" SEE DETAIL R BASE DITCH LATERAL 4' 36" Site Station StructureNo.(From/To)Size / Type1 16+90 to 19+13 Prop. 66" WELDED STEELX 5529 4527 100562 52+89 to 55+62 Prop. 60" RCPX16327 10878 272053 68+12 to 70+29 Prop. 8'x6' RCBC w/ (2) 48" RCPX14972 8618 235904 98+36 to 100+13 Prop. (2) 42" RCPX8377 5662 140395 155+70 to 157+45 Prop. Dual 60' BridgesX8230 5181 134115529 4527 10056 47906 30339 78245 0 0NOTES:Revised 2018 Feb SHEET 8 OF 9ALLOWABLE MITIGABLE6/9/2021ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)35494.1.1BEAUFORT & MARTIN COUNTIESR-2511BUFFER REPLACEMENTIMPACTSRIPARIAN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATION Total area, including utility impacts, has been taken into consideration for Allowable vs Mitigable ImpactsDIVISION OF HIGHWAYSTOTALS*:ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)TYPE ZONE 1 (ft2)ZONE 2 (ft2)118+85 RT176 6253+98 to 55+622030 26885155+70 to 157+458230 518110436 7875Revised 2018 Feb SHEET 9 OF 9WETLANDS IN BUFFER IMPACTS SUMMARY35494.1.1NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS6/9/2021BEAUFORT & MARTIN COUNTIESR-2511WETLANDS IN BUFFERSSITE NO.STATION (FROM/TO)TOTAL:Rev. Jan 2009