Loading...
HomeMy WebLinkAbout20210925 Ver 1_ePCN Application_20210623 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20210925 1 Is a payment required for this project?* ✓ No payment required 6' Fee received Reviewing Office* ✓ Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Ryan Conchilla:eads\rjconchilla Information for Initial Review la.Name of project: Tabernacle Church Road Bridge Replacement 1a.Who is the Primary Contact?* Della Moore lb.Primary Contact Email:* 1c.Primary Contact Phone:* drmoore2@ncdot.gov (336)334-3515 Date Submitted 6/23/2021 Nearest Body of Water Big Alamance Creek Basin Cape Fear Water Classification Big Alamance Creek Site Coordinates Latitude: Longitude: 35.962690 -79.715119 A. Processing Information County(or Counties)where the project is located: Guilford Is this a NCDMS Project ✓ Yes ( No Is this project a public transportation project?* ( Yes r No Is this a NCDOT Project?* ( Yes r No (NCDOT only)T.I.P.or state project number: SF-400584 WBS#(9) 17BP.7.R.138 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version 20210925 1 Pre-fling Meeting or Request Date 5/4/2021 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach document DWR Pre-Filing Meeting Request Form(2).pdf 53KB Re type mast be FCF 1a.Type(s)of approval sought from the Corps: (7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? f7 Nationwide Permit(NWP) ✓Regional General Permit(RGP) ✓Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes 6 No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express ✓Non-404 Jurisdictional General Permit 17 Riparian Buffer Authorization ✓ Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes 6' No For the record only for Corps Permit: r Yes 6 No If.Is this an after-the-fact permit application?* ✓ Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo lh.Is the project located in any of NC's twenty coastal counties? ✓ Yes 6 No 1j.Is the project located in a designated trout watershed? ✓ Yes f No B. Applicant Information 1d.Who is applying for the permit? 17 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes f No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 1584 Yanceyville St Address Line 2 atY State/Bovine/Region Greensboro NC Postal/Zip Cork Country 27405 Guilford 2e.Telephone Number: 2f.Fax Number: (336)334-3515 2g.Email Address:* drmoore2@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b.Subdivision name: (if appropriate) Pleasant Garden 1c.Nearest municipality/town: Climax 2. Project Identification 2a.Property Identification Number: 2b.Property size: N/A 2c.Project Address Street Address Address Line 2 Clly Slate/Rovince/Fagion Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Big Alamance Creek 3b.Water Resources Classification of nearest receiving water:* Big Alamance Creek 3c. What river basin(s)is your project located in?* Cape Fear 3d.Please provide the 12-digit HUC in which the project is located. 030300020301 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The surrounding land use consists of forest,rural residential,and woodlands.TIP project SF-400584 involves the replacement of the existing NCDOT Bridge#400584 on SR 3412 (Tabernacle Church Road)over Big Alamance Creek in Guilford County. Bridge#400584 consists of 3 @ 30'precast prestressed concrete channels with end bents made of PPC cap and timber piles with interior bents made of PPC cap and steel piles.The proposed bridge will consists of 1 @ 100'-39"box beam with 4'-0"caps. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes f• No C Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0.055 4g.List the total estimated linear feet of all existing streams on the property: 100 4h.Explain the purpose of the proposed project:* The purpose of this project is to replace a structurally deficient and aged bridge with a new structurally sound bridge. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The project includes removal of the existing bridge NCDOT Bridge#400584 on SR 3412(Tabernacle Church Road)over Big Alamance Creek at Guilford County.The project is approximately 0.12 miles long surrounded by forest and rural residential areas within 0.3 acres.This bridge consists of 3 @ 30'precast prestressed concrete channels with end bents made of PPC cap and timber piles with interior bents made of PPC cap and steel piles,2 @ 10'lanes with 0.5'paved shoulders.The proposed typical cross section will be two 11'lanes with 4'paved shoulders and 2'grass shoulders(off-road);4'-3"paved shoulders approaching the(bridge).The proposed structure is to include 1 @ 100'-39"box beam with 4'-0"caps. Rip-rap pads will be utilized to dissipate energy and to reduce velocity at all proposed outfalls.No deck drains are required for the proposed bridge.The bridge subject to the Jordan Lake Buffer Rules.An offsite detour will be utilized during removal and placement of the existing and proposed bridges.Construction equipment utilized will consists of(but not limited to) cranes,excavators,backhoes,dumb trucks,hand tools,compactors,and erosion control&safety equipment/materials that will serve as barriers for compliance and BMP implementation. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* ✓ Yes C No C Unknown Comments: Please see permit plans. 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved r Not Verified C Unknown F N/A Corps AID Number: N/A 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Agency/Consultant Company: Simpson Engineers and Associates Other: VHB Engineering 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes (7 No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? N/A D. Proposed Impacts Inventory 1. Impacts Summary la.Where are the impacts associated with your project?(check all that apply): 17 Wetlands fJ Streams-tributaries fJ Buffers r Open Waters 1 Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* L-14+20 to Fill in Wetlands P Bottomland Hardwood Forest WLB Yes DWR 0.019 16+14 (acres) L-14+20 to Mechanized Clearing in P Bottomland Hardwood Forest WLB Yes DWR 0.036 16+14 Wetlands (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.000 0.055 2g.Total Wetland Impact 0.055 2i.Comments: N/A 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* Si L-14+20 to 16+14 Temporary Other Big Alamance Creek Perennial Both 5 10 Average(feet) (linear feet) 31.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 0 10 3i.Total stream and ditch impacts: 10 3j.Comments: N/A 6. Buffer Impacts(for DWR) 6a.Project is in which protect basin(s)? Check all that apply. C Neuse r Tar-Pamlico C Catawba r Randleman E Goose Creek 17 Jordan Lake r Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact L-13+65 to 15+08-LT(Bridge) P Big Alamance Creek No 684 114 L-13+68 to 15+08-LT(Parallel Impacts) P Big Alamance Creek No 125 303 L-13+62 to 15+04-RT(Bridge) P Big Alamance Creek No 2,815 756 L��-13+62 to 15+04-RT(Parallel Impacts) P Big Alamance Creek No 236 1,150 L-14+61 to 15+08-LT(Wetlands in Buffer) T Big Alamance Creek Yes 165 212 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 165.00 212.00 Zone 1 Zone 2 Total Permanent impacts: 3,860.00 2,323.00 Zone 1 Zone 2 Total combined buffer impacts: 4,025.00 2,535.00 6i.Comments: N/A E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Rip-rap pads will be utilized to dissipate energy and to reduce velocity at all proposed outfalls.BMP's alongside erosion control measures will be installed as per plan and the site will be continuously monitored during rain events and throughout the duration of construction. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: An off-site detour will be implemented to control traffic for this area.Concrete footers will be retained,the embankments will be stabilized with Class II Riprap and geotextile fabric,standard base ditches and toe protection will be utilized to manage flow as well as erosion control measures to direct flow and maintain compliance. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? r Yes m No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: In accordance with 15A NCAC 02H.0506(h),15A NCAC 02H.1305(g),the Division of Water Resources(DWR)requires compensatory mitigation for permanent impacts(sometimes referred to as losses or fill)of streams,and wetlands.DWR requires compensatory mitigation for impacts equal to or greater than 300 linear feet of perennial stream and equal to or greater than 0.10 acre of wetland.Mitigation is only required if stream impacts on a single reach of stream,or multiple crossings of the same stream added together exceed 300 linear feet.DWR requires that all impacts exceeding these thresholds be mitigated at a 1:1 ratio.This project will not exceed the quantified standards for mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? 6 Yes f No What type of SCM are you providing? 1 Level Spreader 1 Vegetated Conveyance(lower SHWT) f-Wetland Swale(higher SHWT) fJ Other SCM that removes minimum 30%nitrogen f-Proposed project will not create concentrated storm titer flow through the buffer 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C Yes f No 2b.Does this project meet the requirements for low density projects as defined in 15A NCAC 02H.1003(2)? s Yes r No Comments: Vegetated conveyances shall meet the following requirements for: (i)Side slopes (ii)Shoulders G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* 6 Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ✓ Yes (• No Comments:* N/A 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15ANCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes 6- No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* C Yes R No 3b.If you answered"no,"provide a short narrative description. No this is a simple bridge replacement to accommodate future traffic/travel demands within a residential area.No future projects or extension thereof in lieu of this project is warranted at this time.The purpose for this bridge replacement is to secure a structurally sound bridge and to remove the existing deficient structure that is well beyond repairing. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes r No C N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* G Yes CNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ( Yes C No 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* r Yes r No r Unknown 5e.Is this a DOT project located within Division's 1-8? 6 Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Website,Aquatic Survey Performed 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes 6 No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* 6 Yes rNo 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* SHPO 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* 6 Yes r No 8b.If yes,explain how project meets FEMA requirements: According to FEMA Floodplain Maps this site is situated in an area of minimal flood hazard and with 0.2%annual chances of flooding. Political Jurisdictions:TOWN OF PLEASANT GARDEN DFIRM_ID 37081C VERSION_ID 2.3.3.3 SOURCE_CIT 37081C BASE7 GFID 2040f948-0c16-468c-91fc-9be99ec65131 SHAPE.LEN 8c.What source(s)did you use to make the floodplain determination?* FEMA Maps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach docunant Tabernacle Church Rd Permit Drawings(1).pdf 1.91MB Tabernacle Church Rd Topo.pdf 764.13KB Tabernacle Rd No Archaeological Survey.pdf 1.83MB Tabernacle Rd Plant Survey.pdf 126.73KB Tabernacle Church Rd Buffer Drawings(2).pdf 1008.56KB Tabernacle Church Rd Soil Map.pdf 908.51KB Catawba Indian Nation Tribal Coordination Notification.pdf 44.26KB Rle nest be HT or ffW Comments N/A Signature * H7 By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: W.R.Archer III,PE Signature ,G1r7tnt ' Date 6/23/2021