Loading...
HomeMy WebLinkAbout20180179 Ver 1_Addendum_20210623Mitigation Project Information Upload ID#* 20180179 Select Reviewer:* Version* 1 Erin Davis Initial Review Completed Date 06/23/2021 Mitigation Project Submittal - 6/23/2021 Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No Type of Mitigation Project:* rJ Stream r Wetlands r Buffer r Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Cara Conder Project Information ID#:* 20180179 Existing ID## Project Type: r DMS C•' Mitigation Bank Project Name: Grassy Creek Tributaries County: Surry Document Information .................................................................................................................................................................. Mitigation Document Type:* Mitigation Bank Information File Upload: Signature Print Name:* Signature:* Email Address:* cara@waterlandsolutions.com Version: *1 Existing Version GrassyCreekTribs_Addendum.pdf 6.39MB Rease upload only one R7Fof the complete file that needs to be submitted... Cara Conder Addendum to the Final Mitigation Plan Grassy Creek Tributaries Mitigation Project Surry County, North Carolina Private Commercial Mitigation Bank for Stream Compensatory Mitigation Credits Upper Yadkin River Basin (CU 03040101) (Warm Water Thermal Regime) USACE Action ID Number: SAW-2017-02528 Prepared for: U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, North Carolina 28403-1343 Prepared by: 4 WATER & LAND SOLUTIONS 7721 SIX FORKS ROAD, SUITE 130, RALEIGH, NC D615 (919)614-5�11 woterlondSolWions.com SIX FORKS ROAD, 130, NC 27615 614 - 5111 I waterlandsolutions.com June 2021 Addendum - Grassy Creek Tributaries Mitigation Project Table of Contents 1 Introduction 3 1.1 Background 3 1.1 Site Construction Winter/Spring 2020 3 2 Revised Mitigation Credits 4 3 Mitigation Work Plan Addendum 4 3.1.1 Stream Repair Design Reach Revisions 4 Tables Table 1. Mitigation Plan Stream Mitigation Credits (SMCs) 3 Table 2. Revised Stream Mitigation Credits (SMCs) 4 Figures Figure 1 Repair Plan Figure Figure 2 Revised Mitigation Features Appendices Appendix A Design Plan Repair Sheets Page 2 Addendum - Grassy Creek Tributaries Mitigation Project 1 Introduction 1.1 Background Water & Land Solutions, LLC (WLS) is submitting this mitigation plan addendum for the Grassy Creek Tributaries Mitigation Project ("Project") under the WLS Yadkin 01 Umbrella Mitigation Bank ("Bank"). The Project involved the restoration, enhancement, and permanent protection of eight stream reaches (R1, R2, R3, R4, R5, R6, R6a and R7), totaling approximately 6,154 linear feet of streams. Table 1 summarizes the stream mitigation credits (SMCs) from the final mitigation plan approved on January 27, 2020. Table 1. Mitigation Plan Stream Mitigation Credits (SMCs) Project Reach Designation Type of Mitigation Existing Proposed Stream Stream Stream Length Ratio Mitigation Length (LF) (LF) Credits (SMCs) R1 R2 R3 R4 R5 R6 R6a R7 Stream Restoration (PI) Stream Restoration (PI) 2,343 651 2,323 476 1:1 1:1 2,243* 426* Stream Restoration (PI) 1,229 1,198 1:1 1,178* Stream Enhancement II 1,127 1,122 5:1 225 Stream Restoration (PI/PII) 329 329 1:1 329 Stream Restoration (PI/PII) Stream Restoration (PI/PII) Stream Restoration (PI/PII) 242 54 376 247 54 405 1:1 1:1 1:1 247 54 355* Totals 6,351 6,154 5,057 Note: *SMCs account for deducting crossings/easement breaks. No mitigation credits were calculated outside the conservation easement boundaries. 1.1 Site Construction Winter/Spring 2020 The site was initially constructed during winter/spring 2020 and there were no major deviations from the final mitigation plan and construction plans. The site earthwork construction was completed on April 28th, 2020 and the vegetation planting was completed on April 30th, 2020. Baseline or MVO monitoring device installation and data collection was conducted the week of May 4th, 2020. This included seven permanent vegetation plots, 12 permanent cross -sections, three flow gauges (R1, R5, and R6), and one crest gauge. During the month of May 2020, the site experienced two separate 2-year storm events resulting in over bank flows and floodplain erosion prior to permanent groundcover establishment. The Surry County Airport Weather Station (KMWK), which is about 15 miles north of the site, reported a total of 9 inches of rain for the month of May which is +1.5 inches greater than the monthly average. On May 20, 2020 there was a storm event with 2.74 inches of rain and on May 21, 2020 there was an additional 1.32 inches of rain. Tropical Storm Bertha made landfall on May 27, 2020 and resulted in 2.61 inches of rain in approximately four hours. On May 27, 2020 the gage height at the USGS Ararat River Station (02113850) in Ararat, NC was approximately 2.0 feet and on May 28th the gage was above 9.0 feet. The average gage height for this station in 2020 was 1.626 feet. Water & Land Solutions Page 3 Addendum - Grassy Creek Tributaries Mitigation Project These rain events caused enough damage to portions of the site preventing the as -built survey completion in 2020. WLS developed a repair plan for the Project, which was implemented in October 2020 and completed by April 2021. 2 Revised Mitigation Credits The mitigation credits have been revised based on repair design changes and are from the as -built survey for Reaches R2 and R3 (Table 2). All the other reaches did not have any channel repair work done and are based on the mitigation plan lengths. Table 2. Revised Stream Mitigation Credits (SMCs) Project Reach Designation Type of Mitigation Existing Proposed Stream Stream Stream Length Ratio Mitigation Length (LF) (LF) Credits (SMCs) R1 R2 R3 R4 R5 R6 R6a R7 Stream Restoration (PI) Stream Restoration (PI) 2,343 651 2,323 430 1:1 1:1 2,2431 3771,2 Stream Restoration (PI) 1,229 Stream Enhancement II 1,127 Stream Restoration (PI/PII) 329 1,202 1,122 329 1:1 1,1801,2 5:1 225 1:1 329 Stream Restoration (PI/PII) 242 247 1:1 247 Stream Restoration (PI/PII) 54 54 1:1 54 Stream Restoration (PI/PII) 376 405 1:1 3551 Totals 6,351 6,112 5,010 Note 1: *SMCs account for deducting crossings/easement breaks. No mitigation credits were calculated outside the conservation easement boundaries. Note 2: SMCs on R2 and R3 are the as -built survey lengths and were the reaches that were repaired/redesigned. 3 Mitigation Work Plan Addendum The mitigation work plan addendum involved the restoration, enhancement and permanent protection of approximately 6,112 linear feet of stream channel. In April 2020 the site was completely planted (8 acres). Following the repair completion (April 2021) 3.43 acres were re -planted. The repair design approach is described in the following subsections. 3.1.1 Stream Repair Design Reach Revisions R1: Damage along this reach mainly involved floodplain erosion. The majority of this erosion occurred downstream of the powerline culvert. There was also one structure failure towards the downstream end of this reach. In addition, both BMPs experienced hillslope erosion. The repair of this reach involved grading the floodplain at a 5% slope from the channel top of bank back to start of the terrace slope. A failed geolift at station 29+25 and 30+50 was also repaired. The BMP within the powerline easement had the slopes graded at a 3:1 slope. In addition, two small swales were constructed to direct flow from adjacent farm fields into this BMP. These swales were lined with matting. Once the swales met the 3:1 slope of the BMP, the remainder of the swale was constructed Page 4 Addendum - Grassy Creek Tributaries Mitigation Project as a boulder step pool, as well as lined with a mix of Class B and Class II rip rap to act as a steep cascade into the BMP. The BMP weir was also be reinforced with Class II stone and boulders. The larger BMP towards the lower end of the reach was stabilized by regrading and matting eroded side slopes. A small swale was constructed to direct flow into the BMP from the adjacent farm field into the BMP. This swale was lined with Class II stone. Both the stone at the inlet and weir of this BMP were supplemented with additional Class II Stone. R2: Approximately 281 LF of this reach was impacted with a heavy sediment load from streams within Pilot Mountain State Park. The repair approach for this reach was to realign the channel from its start at the park boundary and tie this new alignment into the newly constructed channel at approximate station 43+64. The channel was designed more as a Cb-channel with low meander geometry and more step structures to dissipate energy. The entire floodplain along this reach was undercut by approximately one -foot to remove unsuitable material from the floodplain. Cohesive soil was then placed back in the floodplain. The channel and floodplain were regraded along this reach to constrict flood flows slightly and increase shear stress. This will allow the heavy sediment load coming out of the park to be routed more competently through this reach. Along with this realignment several point bars were regraded at a 6:1 slope. Based on the new realignment Reach 2 stream length decreased by approximately 46 feet. R3: Damage along R3 involved erosion of outside meander bends and slight channel adjustment in two meanders. Along with these channel changes, areas of floodplain subsidence occurred both within and outside the conservation easement. Flood flows also eroded many areas of the floodplain. Repair along this reach included many areas of point bar grading at 6:1 slope and reinforcing failing outside meander bends with vegetated geolifts. Two meander bends were slightly realigned to soften channel planform. The first meander bend was realigned starting at station 48+90 and ties back into the ford crossing at approximate existing channel station 51+30. The second realignment starts at station 56+86 and ties back into the existing channel at approximate station 57+75 Based on the realignments in this reach the stream length increased by approximately 4 feet. R4, R5, R6, R6a, R7: There were no design changes to these reaches. Water & Land Solutions Page 5 Figures Channel realigned per repair plan 1,000 Feet Legend —Stream Repair (Restoration) II Conservation Easement [ Pilot Mountain State Park Property Water Quality Feature Stream Mitigation Type Enhancement II Restoration Channel realigned per repair plan Channel realigned per repair plan /WATER & LAND - SOLUTIONS Grassy Creek Tributaries Mitigation Project Repair Plan Map NAD 1983 2011 State Plane North Carolina FIPS 3200 FT US FIGURE 1 L_ Pilot Mountain State Park Property Water Quality Feature Stream Mitigation Type Enhancement II Samoa E o o GeoE-y-, [gyp eog . phi . , MEV DD USDA,Igt§g§o Z E O cDQ IMQ ad nt1'x�- 1211E2, NAP CUa u G 4WATER &LAND" SOLUTIONS Grassy Creek Tributaries Mitigation Project Proposed Mitigation Features Map NAD 1983 2011 State Plane North Carolina FIPS 3200 FT US FIGURE 2 Appendix A r PROJECT NAME GRASSY CREEK DRAWING INFORMATION w I— LIJ > 0' U w 0 0_ Z 0 Q 1 Z (/) 0_ LU/ Q I— C 11-1 LU LU U V) V) V SURRY COUNTY, NORTH CAROLINA SHEET INDEX co Z ono • o1 oo� U << Z `n w Q • 0 v) Z �[ EU Z < u w 1 O w Q Q0 r&)r COVER SHEET PLAN AND PROFILE N PROJECT NAME GRASSY CREEK IL Z z Q 0 w z D U' O o 00 F DRAWING INFORMATION _GRASSY CREEUP is v 0 Q zO Q 0 0 Ed O) PROJECT NAME GRASSY CREEK LLU Z z Q O w z 0O ea F a- DRAWING INFORMATION _GRASS, CREEK_PP_SHEETS., 0 Z Q ZO Q 1:1- O PROJECT ENGINEER PROJECT NAME GRASSY CREEK TRIBUTARIES z O 16 O • 0 = r 2 DRAWING INFORMATION 0 z J_ Q LL z0 Q 0_ 0 • PROJECT ENGINEER PROJECT NAME GRASSY CREEK TRIBUTARIES z 0 16 0 0 r 2 DRAWING INFORMATION 0 z J_ Q LL z 0 Q 0_ 0 PROJECT ENGINEER PROJECT NAME GRASSY CREEK TRIBUTARIES DRAWING INFORMATION co 3 0 Z w J_ Q LL Z0 Q a_ I( 11, li 1 PROJECT NAME GRASSY CREEK TRIBUTARIES DRAWING INFORMATION Z N Z GRASSY CREEK 1311 Z z Q O W z 15 0 0 ° CL 2 DRAWING INFORMATION _GRASS, CREEK_PP_SHEETS., 0 Q z0 Q 0 0 T /